Effective criteria in the public-private partnership in developing countries to apply the sustainable development goals: GAN-based decision support system for the renewable electrical system, case study Syria

被引:0
作者
Krepl, Vladimir [1 ,2 ,3 ]
Fandi, Ghaeth [2 ,4 ,5 ]
Rehabi, Mohammad [2 ,5 ]
Ghanem, Safwan [2 ,4 ]
Jrad, Fayez [6 ]
Mueller, Zdenek [4 ]
Smutka, Lubos [2 ,5 ]
Kyncl, Jan [4 ]
Urbanus, Melkior [2 ,4 ]
Fandie, Soliman
Cabelkova, Inna [5 ]
Tlusty, Josef [2 ,4 ,7 ]
机构
[1] Czech Univ Life Sci Prague, Fac Econ & Management, Dept Econ, Kamycka 961-129, Prague 6, Czech Republic
[2] Czech Univ Life Sci Prague, Fac Econ & Management, Ctr Int Rural Dev Studies CIRDS, Kamycka 961-129, Prague 6, Czech Republic
[3] Czech Univ Life Sci Prague, Fac Trop AgriSci, Dept Sustainable Technol, Kamycka 961-129, Prague 6, Czech Republic
[4] Czech Tech Univ, Fac Elect Engn, Dept Elect Power Engn, Technicka 2, Prague 6, Czech Republic
[5] Czech Univ Life Sci Prague, Fac Econ & Management, Dept Trade & Finance, Kamycka 961-129, Prague 6, Czech Republic
[6] Tishreen Univ, Fac Civil Engn, Dept Construct Management & Engn, Latakia, Syria
[7] Czech Tech Univ, Fac Biomed Engn, Dept Hlth Care Disciplines & Populat Protect, Sportovcu 2311, Kladno 27201, Czech Republic
关键词
Effective criteria; Private-public partnership; Electrical system; Sustainable energy; Generative adversarial neural networks; Sustainable development goals;
D O I
10.1016/j.heliyon.2023.e21422
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The cost of generating electricity in developing countries surpasses the government's ability to sustain it, necessitating the involvement of the private sector in this service provision through public-private partnerships (PPPs) contracts. In Syria, the electricity system has been highly susceptible to damage as a result of the ongoing crisis, leading to frequent and prolonged blackouts. This research focuses on addressing the need for a comprehensive system that aids decision-making for PPPs contracts in the country. By employing a combination of studies, reports, and interviews with domain experts, significant general and exclusive factors that guide decision-makers in PPPs contracts are identified and organized into questionnaires. These questionnaires are then filled out by professionals engaged in PPPs contracts. The collected data is analyzed and validated using SPSS software. However, due to insufficient data collected, generative adversarial neural networks (GAN) are utilized to enhance the research data. Additionally, Expert Choice and the analytic hierarchy process are employed to calculate weights for each factor. Remarkably, the calculated weights for both general and exclusive factors align with real-life strategies. General factors primarily address the financial and commercial considerations associated with PPPs, while exclusive factors primarily focus on the operational aspects of the electrical power system. These factors are arranged in descending order of effectiveness, enabling stakeholders to determine whether the private sector should be engaged in the project or if it should remain within the public sector's purview. The proposed system has demonstrated its reliability and can serve as a promising starting point for PPPs contracts.
引用
收藏
页数:11
相关论文
共 23 条
[1]  
Aketopi B., 2007, Public Investment and Public-Private Partnership
[2]  
Aldegheeli W, 2017, Partnership between the public and private sectors to produce electric power
[3]  
Almorshed A., 2005, Master's thesis
[4]  
[Anonymous], 2016, Partnership law no 5
[5]  
Brailovskyi Illia, 2017, Skhid, P11, DOI [/10.21847/1728-9343.2016.6(146).91796, DOI 10.21847/1728-9343.2016.6(146).91796]
[6]   Flexible contracts to cope with uncertainty in public-private partnerships [J].
Cruz, Carlos Oliveira ;
Marques, Rui Cunha .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (03) :473-483
[7]  
Fadeela A, 2010, The problem of participatory between public and private and the social dimension of the development process
[8]   Public-Private Partnership Experience in the International Arena: Case of Turkey [J].
Gurgun, Asli Pelin ;
Touran, Ali .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (06)
[9]  
Hamdoneh M.K.H., 2017, Master Thesis
[10]  
Hashem H.A, 2015, Al-Ghari J. Econ. Adm. Sci. Iraq, V13