共 50 条
- [41] MULTI-OBJECTIVE UNRELATED PARALLEL MACHINES SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENCE CONSTRAINTS INTERNATIONAL JOURNAL OF ENGINEERING, 2008, 21 (03): : 269 - 278
- [45] Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times The International Journal of Advanced Manufacturing Technology, 2010, 50 : 1153 - 1164
- [47] Metaheuristics for solving a multi-objective flow shop scheduling problem with sequence-dependent setup times Journal of Scheduling, 2020, 23 : 49 - 69