Hybrid multi-objective evolutionary meta-heuristics for a parallel machine scheduling problem with setup times and preferences

被引:4
|
作者
Srinath, Nitin [1 ]
Yilmazlar, I. Ozan [1 ]
Kurz, Mary E. [1 ]
Taaffe, Kevin [1 ]
机构
[1] Clemson Univ, Dept Ind Engn, Clemson, SC 29634 USA
关键词
Parallel machine scheduling; Sequence-dependent setup times; Multi-objective; Metaheuristics; Preferences; GENETIC ALGORITHM; NSGA-II; METAHEURISTIC ALGORITHM; SEQUENCE; MOEA/D; PARETO;
D O I
10.1016/j.cie.2023.109675
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Fabric dyeing is a vital production process of textile products. In the dyeing process, orders are scheduled to machines, and the sequence of jobs on a machine is crucial since the machines require washing out that depends on the type of consecutive orders. This washing out process is a significant cost factor of the dyeing process because of the chemicals used, which causes sequence dependent setup times. Also, the order of the products to be processed is important in terms of quality that depends on color and shade of the jobs. In this paper, two metaheuristics, namely a non-dominated sorting genetic algorithm (NSGA-II) and multi-objective evolutionary algorithm based on decomposition (MOEA/D) are presented to solve the multi-objective scheduling problem for the dyeing process with sequence dependent setup times, in which the objectives are makespan, tardiness, total number of setups, color preference, and shade difference. Two different gene designs and corresponding feasible schedule generation methods - one heuristic based and one integer programming based, which are integrated within the metaheuristic framework, are proposed. Finally, proposed algorithms are compared based on single and multiple objective analysis. From the tests conducted, we observed that the use of hybrid-optimal approaches integrated within the meta-heuristic frameworks provide higher quality solutions but suffer from longer computation times.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Hybrid meta-heuristics for the unrelated parallel machine scheduling problem with setup times
    Fang, Wei
    Zhu, Haolin
    Mei, Yi
    KNOWLEDGE-BASED SYSTEMS, 2022, 241
  • [2] Comparison of two Meta-Heuristics for the Bi-Objective Flexible Job Shop Scheduling Problem with Sequence Dependent Setup Times
    Sacramento, Joao
    Pedrosa, Joao
    Chibeles-Martins, Nelson
    Pinto-Varela, Tania
    30TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PTS A-C, 2020, 48 : 181 - 186
  • [3] A Multi-Objective Identical Parallel Machine Scheduling with Setup and Removal Times with Deteriorating and Learning Effects
    Amini, A.
    Tavakkoli-Moghaddam, R.
    Niakan, F.
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 1271 - 1274
  • [4] A hybrid metaheuristic algorithm for a parallel machine scheduling problem with dependent setup times
    Baez, Sarahi
    Angel-Bello, Francisco
    Alvarez, Ada
    Melian-Batista, Belen
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 131 : 295 - 305
  • [5] Efficient meta-heuristics for the Multi-Objective Time-Dependent Orienteering Problem
    Mei, Yi
    Salim, Flora D.
    Li, Xiaodong
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 254 (02) : 443 - 457
  • [6] A hybrid multi-objective evolutionary algorithm approach for handling sequence- and machine-dependent set-up times in unrelated parallel machine scheduling problem
    Manupati, V. K.
    Rajyalakshmi, G.
    Chan, Felix T. S.
    Thakkar, J. J.
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2017, 42 (03): : 391 - 403
  • [7] A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics
    Sadati, A.
    Moghaddam, R. Tavakkoli
    Naderi, B.
    Mohammadi, M.
    IRANIAN JOURNAL OF FUZZY SYSTEMS, 2019, 16 (04): : 21 - 40
  • [8] Constructive heuristics for the unrelated parallel machines scheduling problem with machine eligibility and setup times
    Perez-Gonzalez, Paz
    Fernandez-Viagas, Victor
    Zamora Garcia, Miguel
    Framinan, Jose M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 131 : 131 - 145
  • [9] A New Multi-objective Meta-heuristics for Distribution Network Reconfigurations with SVRs
    Yoshida, Takafumi
    Mori, Hiroyuki
    IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC 2010), 2010,
  • [10] A matheuristic algorithm for multi-objective unrelated parallel machine scheduling problem
    Sarac, Tugba
    Ozcelik, Feristah
    JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2023, 38 (03): : 1953 - 1966