An optimization model for express delivery with high-speed railway

被引:12
作者
Zhen, Lu [1 ]
Fan, Tianyi [1 ]
Li, Haolin [1 ]
Wang, Shuaian [2 ]
Tan, Zheyi [1 ]
机构
[1] Shanghai Univ, Sch Management, Shanghai, Peoples R China
[2] Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Hong Kong, Peoples R China
基金
中国国家自然科学基金;
关键词
High-speed rail express delivery; Transportation resources arrangement; Freight flow allocation; Two -stage stochastic programming model; Meta -heuristic solution approach; SERVICE NETWORK; CHINA; PASSENGER; TRANSPORT;
D O I
10.1016/j.tre.2023.103206
中图分类号
F [经济];
学科分类号
02 ;
摘要
With the expansion of the high-speed railway (HSR) network in China, high-speed rail express delivery (HSReD) is being used to satisfy the increasing demand for express cargo. The decisions on transportation resources arrangement and freight flow allocation are two of the key issues for practical implementation of HSReD. In this study, we examine the above key issues by developing a two-stage stochastic integer linear programming model to maximize the expected net operation profit of HSReD. A meta-heuristic solution approach introduced some tailored tactics is proposed to speed up the process of solving the above model in the large-scale instances. Numerical experiments based on different sizes and practical investigation on China Railway Nanchang Group are conducted to validate the effectiveness of the proposed model and solution approach. Some managerial implications are also obtained based on the sensitivity analysis, which may be potentially useful for optimizing the daily operation management of HSReD.
引用
收藏
页数:25
相关论文
共 38 条
[21]   Urban rail service design for collaborative passenger and freight transport [J].
Li, Zhujun ;
Shalaby, Amer ;
Roorda, Matthew J. ;
Mao, Baohua .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 147
[22]   Optimizing the freight train connection service network of a large-scale rail system [J].
Lin, Bo-Liang ;
Wang, Zhi-Mei ;
Ji, Li-Jun ;
Tian, Ya-Ming ;
Zhou, Guo-Qing .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2012, 46 (05) :649-667
[23]  
Liu F., 2020, J ADV TRANSPORT, V2, P1
[24]   A decomposition based hybrid heuristic algorithm for the joint passenger and freight train scheduling problem [J].
Liu, Liang ;
Dessouky, Maged .
COMPUTERS & OPERATIONS RESEARCH, 2017, 87 :165-182
[25]   A Distributionally Robust Optimization Method for Passenger Flow Control Strategy and Train Scheduling on an Urban Rail Transit Line [J].
Lu, Yahan ;
Yang, Lixing ;
Yang, Kai ;
Gao, Ziyou ;
Zhou, Housheng ;
Meng, Fanting ;
Qi, Jianguo .
ENGINEERING, 2022, 12 :202-220
[26]   Calculating the maximal number of additional freight trains in a railway network [J].
Meirich, Christian ;
Niessen, Nils .
JOURNAL OF RAIL TRANSPORT PLANNING & MANAGEMENT, 2016, 6 (03) :200-217
[27]  
NBS, 2021, ANN DAT
[28]   An optimization model for freight transport using urban rail transit [J].
Ozturk, Onur ;
Patrick, Jonathan .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 267 (03) :1110-1121
[29]   Two-stage robust railway line-planning approach with passenger demand uncertainty [J].
Pu, Song ;
Zhan, Shuguang .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 152
[30]   Optimizing station location and fleet composition for a high-speed rail line [J].
Repolho, Hugo M. ;
Church, Richard L. ;
Antunes, Antonio P. .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2016, 93 :437-452