Mathematical models and benchmarking for the fuzzy job shop scheduling problem

被引:6
作者
Afsar, Sezin [1 ]
Vela, Camino R. [1 ]
Palacios, Juan Jose [1 ]
Gonzalez-Rodriguez, Ines [2 ]
机构
[1] Univ Oviedo, Dept Comp, Campus Gijon, Gijon 33204, Spain
[2] Univ Cantabria, Dept Matemat Estadist & Comp, Av Castros S-N, Santander 39005, Spain
关键词
Scheduling; Job shop; Fuzzy numbers; Mathematical models; Benchmark; Metaheuristics; SWARM OPTIMIZATION; PROCESSING TIME; UNCERTAINTY; ALGORITHM; INSTANCES;
D O I
10.1016/j.cie.2023.109454
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The fuzzy job shop scheduling problem with makespan minimisation has received considerable attention over the last decade. Different sets of benchmark instances have been made available, and many metaheuristic solutions and corresponding upper bounds of the optimal makespan have been given for these instances in different publications. However, unlike the deterministic case, very little work has been invested in proposing and solving mathematical models for the fuzzy problem. This has resulted both in a lack of a good characterisation of the hardness of existing benchmark instances and in the absence of reliable lower and upper bounds for the makespan. In consequence, it is difficult, if not impossible to properly assess and compare new proposals of exact or approximate solving methods, thus hindering progress in this field. In this work we intend to fill this gap by proposing and solving two mathematical models, a mixed integer linear programming model and a constraint programming model. A thorough analysis on the scalability of solving these mathematical models with commercial solvers is carried out. A state-of-the-art metaheuristic algorithm from the literature is also used as reference point for a better understanding of the results. Using solvers of different nature allows us to improve known upper and lower bounds for all existing instances, and certify optimality for many of them for the first time. It also enables us to structurally characterise the instances' hardness beyond their size.
引用
收藏
页数:14
相关论文
共 66 条
  • [31] Solving fuzzy job shop scheduling problems using random key genetic algorithm
    Lei, Deming
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (1-4) : 253 - 262
  • [32] Fuzzy job shop scheduling problem with availability constraints
    Lei, Deming
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 58 (04) : 610 - 617
  • [33] A Hybrid Iterated Greedy Algorithm for a Crane Transportation Flexible Job Shop Problem
    Li, Jun-Qing
    Du, Yu
    Gao, Kai-Zhou
    Duan, Pei-Yong
    Gong, Dun-Wei
    Pan, Quan-Ke
    Suganthan, P. N.
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2022, 19 (03) : 2153 - 2170
  • [34] Improved Artificial Immune System Algorithm for Type-2 Fuzzy Flexible Job Shop Scheduling Problem
    Li, Jun-qing
    Liu, Zheng-min
    Li, Chengdong
    Zheng, Zhi-xin
    [J]. IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2021, 29 (11) : 3234 - 3248
  • [35] A hybrid discrete particle swarm optimization algorithm for solving fuzzy job shop scheduling problem
    Li, Jun-qing
    Pan, Yu-xia
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (1-4) : 583 - 596
  • [36] Self-adaptive multi-objective evolutionary algorithm for flexible job shop scheduling with fuzzy processing time
    Li, Rui
    Gong, Wenyin
    Lu, Chao
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 168
  • [37] Fuzzy job-shop scheduling based on ranking level (λ, 1) interval-valued fuzzy numbers
    Lin, FT
    [J]. IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2002, 10 (04) : 510 - 522
  • [38] A hybrid multi-verse optimization for the fuzzy flexible job-shop scheduling problem
    Lin, Jian
    Zhu, Lei
    Wang, Zhou-Jing
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 127 (1089-1100) : 1089 - 1100
  • [39] Mixed Integer linear programming and constraint programming models for the online printing shop scheduling problem
    Lunardi, Willian T.
    Birgin, Ernesto G.
    Laborie, Philippe
    Ronconi, Debora P.
    Voos, Holger
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2020, 123
  • [40] Project cash flow analysis in the presence of uncertainty in activity duration and cost
    Maravas, Alexander
    Pantouvakis, John-Paris
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (03) : 374 - 384