Mathematical models and benchmarking for the fuzzy job shop scheduling problem

被引:6
作者
Afsar, Sezin [1 ]
Vela, Camino R. [1 ]
Palacios, Juan Jose [1 ]
Gonzalez-Rodriguez, Ines [2 ]
机构
[1] Univ Oviedo, Dept Comp, Campus Gijon, Gijon 33204, Spain
[2] Univ Cantabria, Dept Matemat Estadist & Comp, Av Castros S-N, Santander 39005, Spain
关键词
Scheduling; Job shop; Fuzzy numbers; Mathematical models; Benchmark; Metaheuristics; SWARM OPTIMIZATION; PROCESSING TIME; UNCERTAINTY; ALGORITHM; INSTANCES;
D O I
10.1016/j.cie.2023.109454
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The fuzzy job shop scheduling problem with makespan minimisation has received considerable attention over the last decade. Different sets of benchmark instances have been made available, and many metaheuristic solutions and corresponding upper bounds of the optimal makespan have been given for these instances in different publications. However, unlike the deterministic case, very little work has been invested in proposing and solving mathematical models for the fuzzy problem. This has resulted both in a lack of a good characterisation of the hardness of existing benchmark instances and in the absence of reliable lower and upper bounds for the makespan. In consequence, it is difficult, if not impossible to properly assess and compare new proposals of exact or approximate solving methods, thus hindering progress in this field. In this work we intend to fill this gap by proposing and solving two mathematical models, a mixed integer linear programming model and a constraint programming model. A thorough analysis on the scalability of solving these mathematical models with commercial solvers is carried out. A state-of-the-art metaheuristic algorithm from the literature is also used as reference point for a better understanding of the results. Using solvers of different nature allows us to improve known upper and lower bounds for all existing instances, and certify optimality for many of them for the first time. It also enables us to structurally characterise the instances' hardness beyond their size.
引用
收藏
页数:14
相关论文
共 66 条
  • [1] Fuzzy job-shop scheduling problems: A review
    Abdullah, Salwani
    Abdolrazzagh-Nezhad, Majid
    [J]. INFORMATION SCIENCES, 2014, 278 : 380 - 407
  • [2] THE SHIFTING BOTTLENECK PROCEDURE FOR JOB SHOP SCHEDULING
    ADAMS, J
    BALAS, E
    ZAWACK, D
    [J]. MANAGEMENT SCIENCE, 1988, 34 (03) : 391 - 401
  • [3] Multi-objective enhanced memetic algorithm for green job shop scheduling with uncertain times
    Afsar, Sezin
    Jose Palacios, Juan
    Puente, Jorge
    Vela, Camino R.
    Gonzalez-Rodriguez, Ines
    [J]. SWARM AND EVOLUTIONARY COMPUTATION, 2022, 68
  • [4] [Anonymous], 2009, P 19 INT C AUT PLANN
  • [5] Applegate D., 1991, ORSA Journal on Computing, V3, P149, DOI 10.1287/ijoc.3.2.149
  • [6] Basan N.P., 2019, CHEM ENG T, V74, P613, DOI 10.3303/CET1974103.
  • [7] Survey on fuzzy shop scheduling
    Behnamian, J.
    [J]. FUZZY OPTIMIZATION AND DECISION MAKING, 2016, 15 (03) : 331 - 366
  • [8] A survey on new generation metaheuristic algorithms
    Dokeroglu, Tansel
    Sevinc, Ender
    Kucukyilmaz, Tayfun
    Cosar, Ahmet
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
  • [9] A Reinforcement Learning Approach for Flexible Job Shop Scheduling Problem With Crane Transportation and Setup Times
    Du, Yu
    Li, Junqing
    Li, Chengdong
    Duan, Peiyong
    [J]. IEEE TRANSACTIONS ON NEURAL NETWORKS AND LEARNING SYSTEMS, 2024, 35 (04) : 5695 - 5709
  • [10] Probability-possibility transformations, triangular fuzzy sets, and probabilistic inequalities
    Dubois, Didier
    Foulloy, Laurent
    Mauris, Gilles
    Prade, Henri
    [J]. Reliable Computing, 2004, 10 (04) : 273 - 297