Multi-level lot-sizing and job shop scheduling with lot-streaming: Reformulation and solution approaches

被引:15
作者
Rohaninejad, Mohammad [1 ]
Hanzalek, Zdenek [1 ]
机构
[1] Czech Tech Univ, Czech Inst Informat Robot & Cybernet, Ind Informat Dept, Prague 6, Czech Republic
关键词
Lot-sizing; Job shop scheduling; Constraint programming; Heuristic; Fix and relax; CAPACITATED FLOW-SHOP; GENETIC ALGORITHM; MODEL; OPTIMIZATION; FIX; SETUPS; HEURISTICS; COMPLEXITY; PRODUCTS; SEARCH;
D O I
10.1016/j.ijpe.2023.108958
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses a multi-level lot-sizing and job shop scheduling problem with lot-streaming. In the multi-level production system, workstations receive materials from the lower level, and after some operation, materials are shipped to the next level. Hence, establishing a material balance between the different levels is the most challenging part of multi-level production planning and scheduling. The material balance can be performed with or without lot-streaming. Lot-streaming effectively enables consecutive operations to overlap by splitting a processing lot into several sub-lots. In small-bucket time models, this capability is taken into account by establishing the material balance in each small unit of time (micro-period), which makes the models computationally expensive. In the present work, a novel and much less complicated big-bucket time formulation has been developed, which incorporates lot-streaming considering sequence-dependent setup times and capacitated machines. Computational experiments affirm the promising results of the proposed model compared to the well-known models in the literature. Moreover, two efficient heuristics have been developed for solving larger-size problems. First, the fix-and-relax algorithm as a constructive heuristic is combined with the fix-and-optimize algorithm as an improvement heuristic. Next, a decomposition heuristic is proposed using mixed-integer programming (MIP) and constraint programming (CP) in the master and sub-problem, respectively. The computational results show that the proposed heuristics are very efficient, even in solving large-sized problems.
引用
收藏
页数:20
相关论文
共 71 条
[41]   Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions [J].
Lang, Jan Christian ;
Shen, Zuo-Jun Max .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 214 (03) :595-605
[42]   Heuristic approach on dynamic lot-sizing model for durable products with end-of-use constraints [J].
Li, Yongjian ;
Cai, Xiaoqiang ;
Xu, Lei ;
Yang, Wenxia .
ANNALS OF OPERATIONS RESEARCH, 2016, 242 (02) :265-283
[43]   Operation of manufacturing systems with work-in-process inventory and production control [J].
Ma, YH ;
Koren, Y .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2004, 53 (01) :361-365
[44]   MULTILEVEL CAPACITATED LOTSIZING COMPLEXITY AND LP-BASED HEURISTICS [J].
MAES, J ;
MCCLAIN, JO ;
VANWASSENHOVE, LN .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 53 (02) :131-148
[45]  
Mahdieh Masoumeh, 2011, J IND SYST ENG, V5, P107
[46]   Simultaneous lotsizing and scheduling by combining local search with dual reoptimization [J].
Meyr, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 120 (02) :311-326
[47]   A relax-and-fix with fix-and-optimize heuristic applied to multi-level lot-sizing problems [J].
Motta Toledo, Claudio Fabiano ;
Arantes, Marcio da Silva ;
Bressan Hossomi, Marcelo Yukio ;
Franca, Paulo Morelato ;
Akartunali, Kerem .
JOURNAL OF HEURISTICS, 2015, 21 (05) :687-717
[48]   A near-optimal solution method of multi-item multi-process dynamic lot size scheduling problem [J].
Muramatsu, K ;
Warman, A ;
Kobayashi, M .
JSME INTERNATIONAL JOURNAL SERIES C-MECHANICAL SYSTEMS MACHINE ELEMENTS AND MANUFACTURING, 2003, 46 (01) :46-53
[49]   SIMULATION STUDY OF A FLEXIBLE MANUFACTURING SYSTEM REGARDING SUSTAINABILITY [J].
Ojstersek, R. ;
Acko, B. ;
Buchmeister, B. .
INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2020, 19 (01) :65-76
[50]   Sequencing, lot sizing and scheduling of several products in job shops: the common cycle approach [J].
Ouenniche, J ;
Boctor, F .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (04) :1125-1140