Risk Assessment Method and Application for Tunnel Lining Demolition Construction

被引:1
作者
Li, Lei [1 ]
Zhao, Jinpeng [2 ]
Fan, Xiaomin [2 ]
机构
[1] Res Inst Highway Minist Transport, Bridge & Tunnel Res Ctr, Beijing 100088, Peoples R China
[2] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 21期
关键词
tunnel lining; lining demolition; construction risks; risk assessment;
D O I
10.3390/app132111819
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The maintenance, reconstruction, and expansion of tunnels often require the removal of existing tunnel linings. However, there is a paucity of research on risk assessments during tunnel lining demolitions. In order to address this gap, we developed a risk assessment model for tunnel lining demolitions using a fuzzy hierarchy comprehensive evaluation and expert surveys. This model draws on on-site construction experience. A fuzzy hierarchy comprehensive evaluation assesses risk probability, while expert questionnaires evaluate risk loss. Our study applied this model to a tunnel project in Qinghai, determining that the overall risk level falls within category "V3", indicating acceptable risk. Nonetheless, ongoing vigilance and monitoring measures are necessary throughout the construction process. These findings contribute to a deeper understanding of tunnel lining demolition risk assessments for improving project management and safety.
引用
收藏
页数:18
相关论文
共 41 条
[1]  
Ata A., 2022, Egypt. Int. J. Eng. Sci. Technol, V37, P7
[2]   Risk assessment of water inrush in karst tunnels based on two-class fuzzy comprehensive evaluation method [J].
Chu, Handong ;
Xu, Guangli ;
Yasufuku, Noriyuki ;
Yu, Zhang ;
Liu, Pola ;
Wang, Jifeng .
ARABIAN JOURNAL OF GEOSCIENCES, 2017, 10 (07)
[3]   Fuzzy comprehensive evaluation model for construction risk analysis in urban subway [J].
Dai, Chun-Quan ;
Zhao, Zeng-Hui .
INTERNATIONAL JOURNAL OF MODELING SIMULATION AND SCIENTIFIC COMPUTING, 2015, 6 (03)
[4]  
Damiani A., 2023, Life-Cycle of Structures and Infrastructure Systems, V1st ed., P3562
[5]   Review of application of analytic hierarchy process (AHP) in construction [J].
Darko, Amos ;
Chan, Albert Ping Chuen ;
Ameyaw, Ernest Effah ;
Owusu, Emmanuel Kingsford ;
Parn, Erika ;
Edwards, David John .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (05) :436-452
[6]   Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No.2 [J].
Eskesen, SD ;
Tengborg, P ;
Kampmann, J ;
Veicherts, TH .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2004, 19 (03) :217-237
[7]  
Ghosh S., 2004, International Journal of Project Management, V22, P633, DOI 10.1016/j.ijproman.2004.05.004
[8]   Multi-source information fusion for safety risk assessment in underground tunnels [J].
Guo, Kai ;
Zhang, Limao .
KNOWLEDGE-BASED SYSTEMS, 2021, 227
[9]   Evaluating the Application of Rock Breakage without Explosives in Underground Construction-A Critical Review of Chemical Demolition Agents [J].
Habib, Kelly-Meriam ;
Shnorhokian, Shahe ;
Mitri, Hani .
MINERALS, 2022, 12 (02)
[10]  
Hollaway L.C., 2002, PROG STRUCT ENG MAT, V4, P131, DOI [10.1002/pse.112, DOI 10.1002/PSE.112]