Post-Earthquake Scheduling of Rescuers: A Method Considering Multiple Disaster Areas and Rescuer Collaboration

被引:1
|
作者
Cao, Pingping [1 ]
Zheng, Jin [2 ]
Li, Mingyang [2 ]
机构
[1] Criminal Invest Police Univ China, Dept Basic Teaching & Res, Shenyang 110854, Peoples R China
[2] Liaoning Univ, Business Sch, Dept Management Sci & Engn, Shenyang 110136, Peoples R China
关键词
earthquake emergency rescue; rescuer scheduling; rescue task; collaboration; multiple disaster areas; optimization model; MEDICAL RESCUE; EMERGENCY RESPONSE; EARTHQUAKE; ALLOCATION; OPTIMIZATION; MANAGEMENT; OPERATIONS; DEMAND;
D O I
10.3390/su151511586
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Reasonable and efficient scheduling of rescuers plays a crucial role in earthquake emergency relief, which can effectively reduce disaster losses and promote social stability and sustainable development. Due to the suddenness of disasters, the urgency of time, and the complexity of rescue efforts, scheduling of rescuers often involves multiple disaster areas, multiple departure areas, and diverse rescue tasks. However, most existing studies have paid little attention to the scheduling problem of rescuers considering multiple disaster areas, multiple departure areas, and multiple rescue tasks and have not comprehensively considered the collaboration of rescuers and task requirements. Thus, how to reasonably dispatch rescuers to disaster areas by considering the collaboration of rescuers and task needs is a noteworthy research problem. The objective of this paper is to propose a method considering multiple disaster areas and the collaboration of rescuers to solve the scheduling problem of rescuers after earthquakes. Firstly, the collaborative degrees of rescuers are calculated according to the collaborative performance among rescuers concerning collaborative feature indicators. Secondly, according to the performance of rescuers concerning professional skill evaluation indicators, the professional abilities of rescuers are calculated, and the comprehensive performance indicators for rescuers are obtained by aggregating the collaborative degrees and the professional abilities of rescuers. Thirdly, the time satisfaction degrees are calculated based on the times taken by rescuers from different departure areas to disaster areas and the time requirements of disaster areas. Then, the time satisfaction degrees and the comprehensive performance of rescuers are aggregated to obtain the comprehensive matching degrees. Furthermore, a rescuer scheduling model for earthquake emergency rescue is constructed to maximize the comprehensive matching degrees between rescuers and rescue tasks, and the optimal scheduling scheme is determined by solving the model. Finally, a case study and comparative analyses are presented to verify the rationality and feasibility of the proposed method. The results show that the proposed method can reasonably assign rescuers to quickly respond to the needs of rescue tasks in disaster areas, and is better than the other two methods in terms of rescue comprehensive capability evaluation. The proposed method can provide decision support for solving the post-earthquake scheduling problem of rescuers and help to improve the emergency response ability for large-scale geological disaster events.
引用
收藏
页数:22
相关论文
共 50 条
  • [41] Post-Earthquake Emergency Logistics Location-Routing Optimization Considering Vehicle Three-Dimensional Loading Constraints
    Pu, Xujin
    Zhao, Xu
    SYMMETRY-BASEL, 2024, 16 (08):
  • [42] Review of the flat-jack method and lessons from extensive post-earthquake research campaign in Croatia
    Lulic, Luka
    Stepinac, Mislav
    Bartolac, Marko
    Lourenco, Paulo B.
    CONSTRUCTION AND BUILDING MATERIALS, 2023, 384
  • [43] Building Damage Assessment Based on the Fusion of Multiple Texture Features Using a Single Post-Earthquake PolSAR Image
    Zhai, Wei
    Huang, Chunlin
    Pei, Wansheng
    REMOTE SENSING, 2019, 11 (08)
  • [44] Post-earthquake fire simulation considering overall seismic damage of sprinkler systems based on BIM and FEMA P-58
    Xu, Zhen
    Zhang, Zongcai
    Lu, Xinzheng
    Zeng, Xiang
    Guan, Hong
    AUTOMATION IN CONSTRUCTION, 2018, 90 : 9 - 22
  • [45] Asymmetrical power relationships in disaster reduction remain the key barrier to sustainable recovery: Neoliberalism and Nepal's post-earthquake recovery experiences
    Lam, Lai Ming
    SUSTAINABLE DEVELOPMENT, 2024, 32 (02) : 1483 - 1495
  • [46] Multi-criteria decision making for city-scale infrastructure of post-earthquake assembly areas: Case study of Istanbul
    Aman, Doga Dinemis
    Aytac, Gulsen
    INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2022, 67
  • [47] A rapid evaluation method based on natural frequency for post-earthquake traffic capacity of small and medium span bridges
    Tan, Guojin
    Li, He
    Wang, Wensheng
    Kong, Qingwen
    Jiang, Lin
    Zhang, Sufeng
    Wei, Xueliang
    ENGINEERING STRUCTURES, 2023, 280
  • [48] Post-earthquake functionality and resilience prediction of bridge networks based on data-driven machine learning method
    Zhang, Wangxin
    Wen, Jianian
    Dong, Huihui
    Han, Qiang
    Du, Xiuli
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2025, 190
  • [49] BUILDING DAMAGE INFORMATION INVESTIGATION FROM A SINGLE POST-EARTHQUAKE POLSAR IMAGE BASED ON THE FUSION OF MULTIPLE TEXTURE FEATURES
    Zhai, Wei
    Huang, Chun-Lin
    Pei, Wan-sheng
    Li, Yan
    2017 IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM (IGARSS), 2017, : 1036 - 1039
  • [50] Investigating impacts of different building contents on the post-earthquake evacuation time using an agent-based model with considering turning behavior
    Bao, Yu
    EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION, 2024, 23 (04) : 939 - 955