Post-Earthquake Scheduling of Rescuers: A Method Considering Multiple Disaster Areas and Rescuer Collaboration

被引:1
|
作者
Cao, Pingping [1 ]
Zheng, Jin [2 ]
Li, Mingyang [2 ]
机构
[1] Criminal Invest Police Univ China, Dept Basic Teaching & Res, Shenyang 110854, Peoples R China
[2] Liaoning Univ, Business Sch, Dept Management Sci & Engn, Shenyang 110136, Peoples R China
关键词
earthquake emergency rescue; rescuer scheduling; rescue task; collaboration; multiple disaster areas; optimization model; MEDICAL RESCUE; EMERGENCY RESPONSE; EARTHQUAKE; ALLOCATION; OPTIMIZATION; MANAGEMENT; OPERATIONS; DEMAND;
D O I
10.3390/su151511586
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Reasonable and efficient scheduling of rescuers plays a crucial role in earthquake emergency relief, which can effectively reduce disaster losses and promote social stability and sustainable development. Due to the suddenness of disasters, the urgency of time, and the complexity of rescue efforts, scheduling of rescuers often involves multiple disaster areas, multiple departure areas, and diverse rescue tasks. However, most existing studies have paid little attention to the scheduling problem of rescuers considering multiple disaster areas, multiple departure areas, and multiple rescue tasks and have not comprehensively considered the collaboration of rescuers and task requirements. Thus, how to reasonably dispatch rescuers to disaster areas by considering the collaboration of rescuers and task needs is a noteworthy research problem. The objective of this paper is to propose a method considering multiple disaster areas and the collaboration of rescuers to solve the scheduling problem of rescuers after earthquakes. Firstly, the collaborative degrees of rescuers are calculated according to the collaborative performance among rescuers concerning collaborative feature indicators. Secondly, according to the performance of rescuers concerning professional skill evaluation indicators, the professional abilities of rescuers are calculated, and the comprehensive performance indicators for rescuers are obtained by aggregating the collaborative degrees and the professional abilities of rescuers. Thirdly, the time satisfaction degrees are calculated based on the times taken by rescuers from different departure areas to disaster areas and the time requirements of disaster areas. Then, the time satisfaction degrees and the comprehensive performance of rescuers are aggregated to obtain the comprehensive matching degrees. Furthermore, a rescuer scheduling model for earthquake emergency rescue is constructed to maximize the comprehensive matching degrees between rescuers and rescue tasks, and the optimal scheduling scheme is determined by solving the model. Finally, a case study and comparative analyses are presented to verify the rationality and feasibility of the proposed method. The results show that the proposed method can reasonably assign rescuers to quickly respond to the needs of rescue tasks in disaster areas, and is better than the other two methods in terms of rescue comprehensive capability evaluation. The proposed method can provide decision support for solving the post-earthquake scheduling problem of rescuers and help to improve the emergency response ability for large-scale geological disaster events.
引用
收藏
页数:22
相关论文
共 50 条
  • [21] Social capital and community disaster resilience: post-earthquake tourism recovery on Gili Trawangan, Indonesia
    Stefan Partelow
    Sustainability Science, 2021, 16 : 203 - 220
  • [22] Optimization Dubins Path of Multiple UAVs for Post-Earthquake Rapid-Assessment
    Zhu, Moning
    Zhang, Xuehua
    Luo, He
    Wang, Guoqiang
    Zhang, Binbin
    APPLIED SCIENCES-BASEL, 2020, 10 (04):
  • [23] Damaged Building Detection From Post-Earthquake Remote Sensing Imagery Considering Heterogeneity Characteristics
    Xie, Yakun
    Feng, Dejun
    Chen, Hongyu
    Liu, Zichen
    Mao, Wenfei
    Zhu, Jun
    Hu, Ya
    Baik, Sung Wook
    IEEE TRANSACTIONS ON GEOSCIENCE AND REMOTE SENSING, 2022, 60
  • [24] Analysis of emergency assembly points for post-earthquake disaster management: a case study of Erzincan, Türkiye
    Akar, Alper
    Akar, Ozlem
    Konakoglu, Berkant
    NATURAL HAZARDS, 2024, 120 (13) : 11791 - 11824
  • [25] NGO collaboration in community post-disaster reconstruction: field research following the 2008 Wenchuan earthquake in China
    Lu, Yi
    Xu, Jiuping
    DISASTERS, 2015, 39 (02) : 258 - 278
  • [26] Developing a bi-objective resilience relief logistic considering operational and disruption risks: a post-earthquake case study in Iran
    Foroughi, Amin
    Moghaddam, Babak Farhang
    Behzadi, Mohammad Hassan
    Sobhani, Farzad Movahedi
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2022, 29 (37) : 56323 - 56340
  • [27] Running safety assessment of trains considering post-earthquake damage state of bridge-track system
    Tang, Yongjiu
    Zhu, Zhihui
    Ba, Zhenning
    Lee, Vincent W.
    Gong, Wei
    ENGINEERING STRUCTURES, 2023, 287
  • [28] Geo-Logics of Power: Disaster Capitalism, Himalayan Materialities, and the Geopolitical Economy of Reconstruction in Post-Earthquake Nepal
    Paudel, Dinesh
    Le Billon, Philippe
    GEOPOLITICS, 2020, 25 (04) : 838 - 866
  • [29] Natural Disaster Damages and Their Link to Coping Strategy Choices: Field Survey Findings from Post-Earthquake Nepal
    Rayamajhee, Veeshan
    Bohara, Alok K.
    JOURNAL OF INTERNATIONAL DEVELOPMENT, 2019, 31 (04) : 336 - 343
  • [30] Doing Civil Society-Driven Social Accountability in a Disaster Context: Evidence from Post-Earthquake Nepal
    Dhungana, Nimesh
    POLITICS AND GOVERNANCE, 2020, 8 (04): : 395 - 406