Environment-oriented disassembly planning for end-of-life vehicle batteries based on an improved northern goshawk optimisation algorithm

被引:23
作者
Zhan, Changshu [1 ]
Zhang, Xuesong [1 ]
Tian, Guangdong [2 ]
Duc Truong Pham [3 ]
Ivanov, Mikhail [4 ]
Aleksandrov, Anatoly [4 ]
Fu, Chenxi [5 ]
Zhang, Junnan [6 ]
Wu, Zhen [6 ]
机构
[1] Northeast Forestry Univ, Transportat Coll, Harbin 150040, Peoples R China
[2] Beijing Univ Civil Engn & Architecture, Sch Mech Elect & Vehicle Engn, Beijing 100044, Peoples R China
[3] Univ Birmingham, Dept Mech Engn, Birmingham B15 2TT, W Midlands, England
[4] Bauman Moscow State Tech Univ, Dept Ecol & Ind Safety, Moscow 105005, Russia
[5] Dalian Maritime Univ, Sch Foreign Languages, Dalian 116000, Peoples R China
[6] Shandong Wina Green Power Technol Co Ltd, Dept Tech Dev, Weifang 262700, Peoples R China
关键词
Remanufacturing; Green manufacturing; Recycling of ELV batteries; Energy consumption; Disassembly sequence planning;
D O I
10.1007/s11356-023-25599-0
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Due to environmental pollution and resource shortages, the electric vehicle industry has been developing swiftly, and the market demand for batteries, as an essential part of electric vehicles, has also surged. Proper disassembly of end-of-life vehicle batteries (ELV batteries) is necessary to achieve the integrity and closure of their life cycle, promote the development of green remanufacturing, effectively reduce the pollution of the environment caused by metal ion leakage, and reduce people's dependence on natural resources to a certain extent. To schedule the disassembly operations of ELV batteries more rationally and further promote their disassembly quality and efficiency, this paper proposes a dual-objective disassembly sequence planning (DSP) optimisation model, which aims to minimise the hazard index and energy cost during ELV battery disassembly operations. Since the proposed model is a complex NP-hard optimisation problem, this study develops an efficient metaheuristic algorithm for solving this model based on the northern goshawk optimisation algorithm. The main algorithm adds two types of discrete recombination operators and a local search operator. At the same time, the predatory behaviour of the goshawk is optimised by combining the characteristics of the disassembly sequence planning problem to improve its performance. Finally, the disassembly of the battery of a Tesla Model 1 is used as a case study to demonstrate the effectiveness and feasibility of the proposed method.
引用
收藏
页码:47956 / 47971
页数:16
相关论文
共 38 条
[1]   Techno-economic and environmental disassembly planning of lithium-ion electric vehicle battery packs for remanufacturing [J].
Alfaro-Algaba, M. ;
Javier Ramirez, F. .
RESOURCES CONSERVATION AND RECYCLING, 2020, 154
[2]   A decision tool for disassembly process planning under end-of-life product quality [J].
Bentaha, Mohand-Lounes ;
Voisin, Alexandre ;
Marange, Pascale .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2020, 219 :386-401
[3]  
Chen JZ, 2011, ADV INTEL SOFT COMPU, V129, P471
[4]   Northern Goshawk Optimization: A New Swarm-Based Algorithm for Solving Optimization Problems [J].
Dehghani, Mohammad ;
Hubalovsky, Stepan ;
Trojovsky, Pavel .
IEEE ACCESS, 2021, 9 :162059-162080
[5]   AND OR GRAPH REPRESENTATION OF ASSEMBLY PLANS [J].
DEMELLO, LSH ;
SANDERSON, AC .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1990, 6 (02) :188-199
[6]   Sustainable distributed permutation flow-shop scheduling model based on a triple bottom line concept [J].
Fathollahi-Fard, Amir M. ;
Woodward, Lyne ;
Akhrif, Ouassima .
JOURNAL OF INDUSTRIAL INFORMATION INTEGRATION, 2021, 24
[7]   A Novel Hybrid Fuzzy Grey TOPSIS Method: Supplier Evaluation of a Collaborative Manufacturing Enterprise [J].
Feng, Yixiong ;
Zhang, Zhifeng ;
Tian, Guangdong ;
Fathollahi-Fard, Amir Mohammad ;
Hao, Nannan ;
Li, Zhiwu ;
Wang, Wenjie ;
Tan, Jianrong .
APPLIED SCIENCES-BASEL, 2019, 9 (18)
[8]   Flexible Process Planning and End-of-Life Decision-Making for Product Recovery Optimization Based on Hybrid Disassembly [J].
Feng, Yixiong ;
Gao, Yicong ;
Tian, Guangdong ;
Li, Zhiwu ;
Hu, Hesuan ;
Zheng, Hao .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2019, 16 (01) :311-326
[9]   RETRACTED: Preventive maintenance for the flexible flowshop scheduling under uncertainty: a waste-to-energy system [J].
Gholizadeh, Hadi ;
Fazlollahtabar, Hamed ;
Fathollahi-Fard, Amir M. ;
Dulebenets, Maxim A. .
ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021, 31 (22) :33163-33163
[10]   Disassembly sequence plan generation using a branch-and-bound algorithm [J].
Güngör, A ;
Gupta, SM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (03) :481-509