A scheduling mechanism for hybrid flow shops with reworks under general queue time limits

被引:0
|
作者
Cho, Yooney [1 ]
Kim, Hyeon-Il [2 ]
Kim, Yeo-Reum [2 ]
Yoo, Seock-Kyu [1 ]
Kim, Byoung-Hee [1 ]
Lee, Dong-Ho [2 ,3 ]
机构
[1] VMS Solut, Yongin, South Korea
[2] Hanyang Univ, Dept Ind Engn, Seoul, South Korea
[3] Hanyang Univ, Dept Ind Engn, Wangsimni Ro 222, Seoul 04763, South Korea
基金
新加坡国家研究基金会;
关键词
Manufacturing management; hybrid flow shop; scheduling; queue time limits; reworks; mechanism; SEMICONDUCTOR WAFER FABRICATION; 2-MACHINE FLOWSHOP; CONSTRAINTS; MINIMIZATION; ALGORITHMS; SIMULATION; MACHINE; SYSTEM; LINES;
D O I
10.1177/09544054231182174
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study addresses multi-stage hybrid flow shop scheduling in which a job is reworked if the queue time between two arbitrary stages exceeds an upper limit. The problem is to determine the allocations of jobs to machines at each stage and the start times of jobs and rework setups/operations when incurred. A mixed integer programming model is proposed for each of the makespan and the total tardiness measures. Then, because the problem is NP-hard, a scheduling mechanism is proposed that consists of three phases: (a) filtering the jobs to be delayed; (b) searching the jobs to be reworked; and (c) dispatching non-delayed and delayed jobs sequentially. Simulation results show that the mechanism proposed in this study outperforms the conventional dispatching approach in the high rework setup time case for the makespan problem and low/high setup time cases for the tardiness problem. The best priority rules of the mechanism under each of the measures are also reported.
引用
收藏
页码:962 / 970
页数:9
相关论文
共 50 条
  • [41] An estimation of distribution algorithm for hybrid flow shop scheduling under stochastic processing times
    Wang, K.
    Choi, S. H.
    Qin, H.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (24) : 7360 - 7376
  • [42] Electricity cost minimisation for optimal makespan solution in flow shop scheduling under time-of-use tariffs
    Minh Hung Ho
    Hnaien, Faicel
    Dugardin, Frederic
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (04) : 1041 - 1067
  • [43] Tri-objective lot-streaming scheduling optimization for hybrid flow shops with uncertainties in machine breakdowns and job arrivals using an enhanced genetic programming hyper-heuristic
    Duan, Jianguo
    Liu, Fanfan
    Zhang, Qinglei
    Qin, Jiyun
    COMPUTERS & OPERATIONS RESEARCH, 2024, 172
  • [44] A hybrid particle swarm optimization algorithm for a no-wait flow shop scheduling problem with the total flow time
    Akhshabi, M.
    Tavakkoli-Moghaddam, R.
    Rahnamay-Roodposhti, F.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (5-8) : 1181 - 1188
  • [45] Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration
    Yang, Shu-Hui
    Wang, Ji-Bo
    APPLIED MATHEMATICS AND COMPUTATION, 2011, 217 (09) : 4819 - 4826
  • [46] An improved ant colony algorithm for dynamic hybrid flow shop scheduling with uncertain processing time
    W. Qin
    J. Zhang
    D. Song
    Journal of Intelligent Manufacturing, 2018, 29 : 891 - 904
  • [47] Multi-job lot streaming to minimize the weighted completion time in a hybrid flow shop scheduling problem with work shift constraint
    Nejati, Mohsen
    Mahdavi, Iraj
    Hassanzadeh, Reza
    Mahdavi-Amiri, Nezam
    Mojarad, MohamadSailm
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (1-4) : 501 - 514
  • [48] Scheduling a two-stage hybrid flow shop with dedicated machines, time lags and sequence-dependent family setup times
    Harbaoui, H.
    Bellenguez-Morineau, O.
    Khalfallah, S.
    2016 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2016, : 2990 - 2995
  • [49] A Hybrid Cellular Automaton Mechanism Inspired Approach for Dynamic and Real-time Traffic Lights Scheduling
    Hu, Wenbin
    Wang, Huan
    Yan, Liping
    Du, Bo
    IEEE 12TH INT CONF UBIQUITOUS INTELLIGENCE & COMP/IEEE 12TH INT CONF ADV & TRUSTED COMP/IEEE 15TH INT CONF SCALABLE COMP & COMMUN/IEEE INT CONF CLOUD & BIG DATA COMP/IEEE INT CONF INTERNET PEOPLE AND ASSOCIATED SYMPOSIA/WORKSHOPS, 2015, : 105 - 112
  • [50] Multi-job lot streaming to minimize the weighted completion time in a hybrid flow shop scheduling problem with work shift constraint
    Mohsen Nejati
    Iraj Mahdavi
    Reza Hassanzadeh
    Nezam Mahdavi-Amiri
    MohamadSailm Mojarad
    The International Journal of Advanced Manufacturing Technology, 2014, 70 : 501 - 514