Dynamic Process Modeling and Real-Time Performance Evaluation of Rework Production System With Small-Lot Order

被引:4
作者
Jia, Zhiyang [1 ]
Ni, Zejun [1 ]
Ma, Chiye [1 ]
机构
[1] Beijing Inst Technol, Sch Automat, Beijing 100081, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
Manufacturing system; rework production; process modeling; performance evaluation; MULTISTAGE MANUFACTURING SYSTEMS; SERIAL PRODUCTION LINES; TRANSIENT;
D O I
10.1109/LRA.2023.3262175
中图分类号
TP24 [机器人技术];
学科分类号
080202 ; 1405 ;
摘要
Rework production system is a typical structure in practical manufacturing, where the defective parts detected by the inspection machine are sent to rework rather than being directly scrapped. Due to the special structure, more complex coupling phenomena between machines and buffers are introduced, especially when machines are unreliable and buffers are finite. In addition, under the intelligent manufacturing environment, customized demands trigger small-lot orders become a common occurrence, which lead to traditional steady-state analysis inapplicable. Therefore in this letter, we study dynamic process modeling and real-time performance evaluation problems of the rework system. Practical issues, such as unreliable machines, finite buffers, and small-lot orders are taken into account. Specifically, a novel dynamic decomposition and aggregation algorithm is proposed. The proposed method is validated to have a precise performance measures prediction effect, as well as an efficient computational performance.
引用
收藏
页码:2874 / 2881
页数:8
相关论文
共 24 条
[1]   Bottlenecks in Bernoulli Serial Lines With Rework [J].
Biller, Stephan ;
Li, Jingshan ;
Marin, Samuel P. ;
Meerkov, Semyon M. ;
Zhang, Liang .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2010, 7 (02) :208-217
[2]   Implementing a Real-Time, Energy-Efficient Control Methodology to Maximize Manufacturing Profits [J].
Brundage, Michael P. ;
Chang, Qing ;
Li, Yang ;
Arinez, Jorge ;
Xiao, Guoxian .
IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2016, 46 (06) :855-866
[3]   Performance evaluation and enhancement of multistage manufacturing systems with rework loops [J].
Cao, Yongxin ;
Subramaniam, V. ;
Chen, Ruifeng .
COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 62 (01) :161-176
[4]   Transient Performance Analysis of Serial Production Lines With Geometric Machines [J].
Chen, Guorong ;
Wang, Chuanfeng ;
Zhang, Liang ;
Arinez, Jorge ;
Xiao, Guoxian .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 2016, 61 (04) :877-891
[5]   Multi-type products and dedicated buffers-based flexible production process analysis of serial Bernoulli lines [J].
Chen, Jingchuan ;
Jia, Zhiyang ;
Huang, Longzhu .
COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 154
[6]   Modeling of Bernoulli production line with the rework loop for transient and steady-state analysis [J].
Ge, Yuntian ;
Li, Lin ;
Wang, Yong .
JOURNAL OF MANUFACTURING SYSTEMS, 2017, 44 :22-41
[7]   Closed Bernoulli lines with finite buffers: real-time performance analysis, completion time bottleneck and carrier control [J].
Jia, Zhiyang ;
Dai, Yaping ;
Chen, Jingchuan .
INTERNATIONAL JOURNAL OF CONTROL, 2021, 94 (07) :1994-2007
[8]   Performance Analysis of Assembly Systems With Bernoulli Machines and Finite Buffers During Transients [J].
Jia, Zhiyang ;
Zhang, Liang ;
Arinez, Jorge ;
Xiao, Guoxian .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2016, 13 (02) :1018-1032
[9]  
Li J, 2009, PRODUCTION SYSTEMS ENGINEERING, P1, DOI 10.1007/978-0-387-75579-3
[10]   Production system design for quality robustness [J].
Li, Jingshan ;
Blumenfeld, Dennis E. ;
Marin, Samuel P. .
IIE TRANSACTIONS, 2008, 40 (03) :162-176