SUCCESSFULLY COMPLETED IMPLEMENTATION OF THE PROJECT "SPEKTAR"

被引:0
作者
不详
机构
来源
GRADEVINAR | 2023年 / 75卷 / 03期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:322 / 322
页数:1
相关论文
共 50 条
[32]   Giant pipeline project completed [J].
不详 .
PROFESSIONAL ENGINEERING, 2007, 20 (22) :10-10
[33]   SOLAR IRRIGATION PROJECT COMPLETED [J].
不详 .
DESIGN NEWS, 1978, 34 (14) :11-11
[34]   Highlight - a recently completed project [J].
Hill, RM .
POWER ENGINEERING JOURNAL, 1999, 13 (03) :174-174
[35]   Highlight - a recently completed project [J].
Asenov, A .
POWER ENGINEERING JOURNAL, 1999, 13 (02) :79-80
[36]   Human genome project completed [J].
Tabitha M Powledge .
Genome Biology, 4 (1)
[37]   Highlight - A recently completed project [J].
Shuttleworth, R .
POWER ENGINEER, 2003, 17 (05) :44-45
[38]   CIM Dragline Project completed [J].
Haddock, K .
CIM BULLETIN, 2002, 95 (1057) :7-8
[39]   Highlight - a recently completed project [J].
Molokov, S .
POWER ENGINEERING JOURNAL, 1999, 13 (01) :14-14
[40]   Chevron Phillips Chemical has successfully completed the acquisition [J].
Thinnes, Billy .
HYDROCARBON PROCESSING, 2012, 91 (01) :9-9