Application of Fuzzy Multi-Objective Programming to Regional Sewer System Planning

被引:9
作者
Huang, Chung-Fu [1 ,2 ]
Chen, Wei-Ting [3 ]
Kao, Chuan-Ksing [4 ]
Chang, Han-Jung [4 ]
Kao, Po-Min [5 ,6 ]
Wan, Terng-Jou [4 ]
机构
[1] Zhaoqing Univ, Sch Environm & Chem Engn, Zhaoqing 526061, Peoples R China
[2] Zhaoqing Univ, Guangdong Prov Key Lab Environm Hlth & Land Resour, Zhaoqing 526061, Peoples R China
[3] St Marys Jr Coll Med Nursing & Management, Dept Cosmet Applicat & Management, Yilan 26644, Taiwan
[4] Natl Yunlin Univ Sci & Technol, Dept Safety Hlth & Environm Engn, Yunlin 64002, Taiwan
[5] Natl Yunlin Univ Sci & Technol, Ctr Green Sustainable & Innovat, Yunlin 64002, Taiwan
[6] Natl Yunlin Univ Sci & Technol, Bachelor Program Ind Technol, Yunlin 64002, Taiwan
关键词
regional sewer system planning; multi-objective programming; nonlinear programming; mixed-integer programming; compromise fuzzy programming; OPTIMIZATION; SIMULATION; INTEGRATION; REMOVAL; DESIGN; PLANT;
D O I
10.3390/pr11010183
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Planning of sewer systems typically involves limitations and problems, regardless of whether traditional planning methods or optimization models are used. Such problems include non-quantifiability, fuzzy objectives, and uncertainties in decision-making variables which are commonly applied in the planning of any process. Particularly, uncertainties have prevented the inclusion of these variables in models. Consequently, the theoretical optional solution of the mathematical models is not the true optimum solution to practical problems. In this study, to solve the above problems for regional sewer system planning, multi-objective programming (MOP), nonlinear programming, mixed-integer programming, and compromise fuzzy programming were used. The objectives of this study were two-fold: (1) determination of the necessary decision-making variables or parameters, such as the optimum number of plants, piping layout, size of the plant, and extent of treatment; (2) establishment of a framework and methodology for optimal planning for designing a regional sewer system, matching demanded targets with the lowest cost, which would achieve the aim of lower space and energy requirements as well as consumption and high treatment efficiency for the purpose of meeting effluent standards. The findings of this study revealed that individual regional sewage treatment plants could be merged to form a centralized system. Land acquisition was difficult; thus, reducing the number of plants was required. Therefore, the compromise-fuzzy-based MOP method could effectively be used to build a regional sewer system plan, and the amount of in-plant establishment reached its maximized value with a minimized cost.
引用
收藏
页数:15
相关论文
共 45 条
[1]  
[Anonymous], 1951, J WILEY N
[2]   Fuzzy arithmetic DEA approach for fuzzy multi-objective transportation problem [J].
Bagheri, M. ;
Ebrahimnejad, A. ;
Razavyan, S. ;
Lotfi, F. Hosseinzadeh ;
Malekmohammadi, N. .
OPERATIONAL RESEARCH, 2022, 22 (02) :1479-1509
[3]   Selecting the optimum portfolio using fuzzy compromise programming and Sharpe's single-index model [J].
Bilbao-Terol, A. ;
Perez-Gladish, B. ;
Antomil-lbias, J. .
APPLIED MATHEMATICS AND COMPUTATION, 2006, 182 (01) :644-664
[4]   Optimal Design of Regional Wastewater Pipelines and Treatment Plant Systems [J].
Brand, Noam ;
Ostfeld, Avi .
WATER ENVIRONMENT RESEARCH, 2011, 83 (01) :53-64
[5]  
BRILL ED, 1978, WATER RESOUR RES, V14, P109
[6]   Optimization of a waste heat utilization network in an eco-industrial park [J].
Chae, Song Hwa ;
Kim, Sang Hun ;
Yoon, Sung-Geun ;
Park, Sunwon .
APPLIED ENERGY, 2010, 87 (06) :1978-1988
[7]   Optimal expansion strategy for a sewer system under uncertainty [J].
Chang, Ni-Bin ;
Hernandez, Elma Annette .
ENVIRONMENTAL MODELING & ASSESSMENT, 2008, 13 (01) :93-113
[8]   A flexible three-level logistic network design considering cost and time criteria with a multi-objective evolutionary algorithm [J].
Cheshmehgaz, Hossein Rajabalipour ;
Desa, Mohamad Ishak ;
Wibowo, Antoni .
JOURNAL OF INTELLIGENT MANUFACTURING, 2013, 24 (02) :277-293
[9]   Multi-objective optimization design and control of plug-in hybrid electric vehicle powertrain for minimization of energy consumption, exhaust emissions and battery degradation [J].
da Silva, Samuel Filgueira ;
Eckert, Jony Javorski ;
Silva, Fabricio Leonardo ;
Silva, Ludmila C. A. ;
Dedini, Franco Giuseppe .
ENERGY CONVERSION AND MANAGEMENT, 2021, 234
[10]   A simulation-based integrated approach to optimize the biological nutrient removal process in a full-scale wastewater treatment plant [J].
Fang, Fang ;
Ni, Bingjie ;
Li, Wenwei ;
Sheng, Guoping ;
Yu, Hanqing .
CHEMICAL ENGINEERING JOURNAL, 2011, 174 (2-3) :635-643