Long-term and multi-objective maintenance scheduling of medium voltage overhead lines based on LP metric method

被引:1
|
作者
Moghadam, Mehdi Akbari [1 ]
Bagheri, Sajad [1 ]
Salemi, Amir Hosein [1 ]
Tavakoli, Mohammad Bagher [1 ]
机构
[1] Islamic Azad Univ, Dept Elect Engn, Arak Branch, Arak 3836119131, Iran
关键词
power distribution reliability; preventive maintenance;
D O I
10.1049/gtd2.13139
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Planning maintenance of medium voltage overhead lines is one of the most important issues in the studies on power distribution network, which will prevent and reduce unwanted interruption. In this paper, long-term maintenance of medium voltage networks was planned by multi-objective function, including an extended mixed-integer linear model to optimize costs, energy not supplied (ENS), and average interruption duration index (SAIDI). In addition, the uncertainty about the annual growth rate of the load, the increase in the cost of goods and services and the increase in the selling price of energy as well as various constraints are all included in the desired objective function, which is one of the main innovations of this paper compared to other published studies. To apply the uncertainties, information gap decision theory (IGDT) has been used, and to solve the objective functions, LP-Metric method has been used. The proposed method was implemented on the standard 11-bus RBTS network by MATLAB and GAMS. The results showed that three different long-term maintenance plans proposed here lead to the optimization of the annual maintenance costs of network, reduction in ENS and interruption, and increase in the reliability of the network based on the uncertainty of each feeder. Here, long-term maintenance of medium voltage overhead lines has been planned by multi-objective function, including an extended mixed-integer linear model to optimize costs, optimization energy not supplied (ENS), and system average interruption duration index (SAIDI). Also, the uncertainties of the annual load growth rate, the increase in the cost of goods and services, and the increase in the selling price of energy along with various constraints are included in the desired objective function, which is one of the main innovations of this paper compared to other published studies. image
引用
收藏
页码:1478 / 1493
页数:16
相关论文
共 50 条
  • [31] Automatic preference based multi-objective evolutionary algorithm on vehicle fleet maintenance scheduling optimization
    Wang, Yali
    Limmer, Steffen
    Olhofer, Markus
    Emmerich, Michael
    Baeck, Thomas
    SWARM AND EVOLUTIONARY COMPUTATION, 2021, 65
  • [32] A new optimal reactive power scheduling method for loss minimization and voltage stability margin maximization using successive multi-objective fuzzy LP technique
    Venkatesh, B
    Sadasivam, G
    Khan, MA
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (02) : 844 - 851
  • [33] Multi-objective Optimization of Brugge Field for Short-Term and Long-Term Waterflood Management
    Mohammed Al-Aghbari
    Majid Al-Wadhahi
    Ashish M. Gujarathi
    Arabian Journal for Science and Engineering, 2022, 47 : 11069 - 11087
  • [34] Multi-objective Optimization of Brugge Field for Short-Term and Long-Term Waterflood Management
    Al-Aghbari, Mohammed
    Al-Wadhahi, Majid
    Gujarathi, Ashish M.
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2022, 47 (09) : 11069 - 11087
  • [35] Bio-objective long-term maintenance scheduling for wind turbines in multiple wind farms
    Zhou, Yifan
    Miao, Jindan
    Yan, Bin
    Zhang, Zhisheng
    RENEWABLE ENERGY, 2020, 160 : 1136 - 1147
  • [36] A Cloud-Edge-Based Multi-Objective Task Scheduling Approach for Smart Manufacturing Lines
    Huayi Yin
    Xindong Huang
    Erzhong Cao
    Journal of Grid Computing, 2024, 22
  • [37] A Cloud-Edge-Based Multi-Objective Task Scheduling Approach for Smart Manufacturing Lines
    Yin, Huayi
    Huang, Xindong
    Cao, Erzhong
    JOURNAL OF GRID COMPUTING, 2024, 22 (01)
  • [38] Multi-objective two-layer optimization model for overhead line maintenance selection based on condition monitoring
    Zhang, D. (zhangdb2004@163.com), 2013, Automation of Electric Power Systems Press (37):
  • [39] Optimal multi-objective long-term sizing of distributed energy resources and hourly power scheduling in a grid-tied microgrid
    Mukhopadhyay, Bineeta
    Das, Debapriya
    SUSTAINABLE ENERGY GRIDS & NETWORKS, 2022, 30
  • [40] Voltage stability constrained multi-objective optimisation model for long-term expansion planning of large-scale wind farms
    Nikkhah, Saman
    Rabiee, Abbas
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2018, 12 (03) : 548 - 555