Delay in Decision-Making Affecting Construction Projects: A Sustainable Decision-Making Model for Mega Projects

被引:11
作者
Khahro, Shabir Hussain [1 ]
Shaikh, Haseeb Haleem [2 ]
Zainun, Noor Yasmin [2 ]
Sultan, Basel [1 ]
Khahro, Qasim Hussain [2 ]
机构
[1] Prince Sultan Univ, Coll Engn, Dept Engn Management, Riyadh 11586, Saudi Arabia
[2] Univ Tun Hussein Onn Malaysia, Fac Civil Engn & Built Environm, Jamilus Res Ctr, Batu Pahat 86400, Malaysia
关键词
construction industry; decision making; delay; construction process; large-scale projects; MANAGEMENT; CLAIMS; COORDINATION; INTELLIGENCE; METHODOLOGY; INDUSTRY; QUALITY; TOOL;
D O I
10.3390/su15075872
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The construction industry is one of the world's fastest-growing industries, since it directly and indirectly contributes to several other industries. It has been observed that delays in the decision making of important stakeholders negatively impact construction projects. Thus, this has multiple consequences on project performance. Consequently, the purpose of this study was to identify the primary causes of delayed decision-making and offer a decision support model for timely construction project decisions. For factor identification, a comprehensive literature analysis was conducted, followed by an analysis of questionnaire responses of ninety-one professionals. For data analysis, the relative importance index (RII) method was applied. The results indicate that client decision-making delays pose a substantial obstacle for building projects. The early decision-making process is impacted by a lack of technical competence, incomplete paperwork, poor leadership, and coordination/communication issues. The proposed model could also assist project practitioners in improving their project decision making. This research study encourages stakeholders to create and implement an efficient decision-making procedure for timely project decisions. A procedure for decision making that is successful could decrease delays in the decision-making process and prevent conflicts and disputes in projects.
引用
收藏
页数:22
相关论文
共 82 条
[1]  
Abdus Saeed Shaikh Asif., 2009, DELAY TO PROJECTS - CAUSE, EFFECT AND MEASURES TO REDUCE / ELIMINATE DELAY BY MITIGATION / ACCELERATION
[2]  
Abidin S.S.Z., 2018, Applied Computing and Informatics, V16, P137, DOI DOI 10.1016/J.ACI.2018.04.002
[3]  
Akmam S.Z.S., 2014, EUR J WORK ORGAN PSY, P525
[4]  
Al Mohsin M., 2012, INT J ADV SCI ENG IN, V2, P186
[5]   Communication, coordination, decision-making and knowledge-sharing: a case study in construction management [J].
Al Nahyan, Moza Tahnoon ;
Sohal, Amrik ;
Hawas, Yaser ;
Fildes, Brian .
JOURNAL OF KNOWLEDGE MANAGEMENT, 2019, 23 (09) :1764-1781
[6]   Delay and Cost Overrun in Infrastructure Projects in Jordan [J].
Al-Hazim, Nabil ;
Abu Salem, Zaydoun ;
Ahmad, Hesham .
7TH INTERNATIONAL CONFERENCE ON ENGINEERING, PROJECT, AND PRODUCTION MANAGEMENT, 2017, 182 :18-24
[7]  
Al-Momani A.H., 2000, INT J PROJ MANAG, V18, P51, DOI [10.1016/S0263-7863(98)00060-X, DOI 10.1016/S0263-7863(98)00060-X]
[8]   Identification of coordination factors affecting building projects performance [J].
Alaloul, Wesam Salah ;
Liew, Mohd Shahir ;
Zawawi, Noor Amila Wan Abdullah .
ALEXANDRIA ENGINEERING JOURNAL, 2016, 55 (03) :2689-2698
[9]  
Alhomadi A., 2011, Procedia Engineering, V14, P1966
[10]  
[Anonymous], 2002, International Journal of Project Management, DOI [DOI 10.1016/S0263-7863(00)00037-5, 10.1016/S0263-7863(00)00037-5]