Domain- and task-analytic workload (DTAW) method: a methodology for predicting mental workload during severe accidents in nuclear power plants

被引:4
作者
Liu, Yang [1 ]
Gao, Qin [1 ]
Wu, Man [1 ]
机构
[1] Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
基金
中国国家自然科学基金;
关键词
Workload; severe accidents; nuclear power plants; task analysis; EMERGENCY OPERATING PROCEDURES; MAIN CONTROL ROOM; COMPLEXITY MEASURE; INFORMATION PRESENTATION; INTERFACE LAYOUT; DECISION-MAKING; PERFORMANCE; MODEL; COORDINATION; UNCERTAINTY;
D O I
10.1080/00140139.2022.2079727
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Excessive mental workload reduces operators' performance and threatens the safety of nuclear power plants (NPPs) in severe accident management (SAM). Given the lack of suitable mental workload measurement methods for SAM tasks, we proposed a Domain- and Task-Analytic Workload (DTAW) method to predict SAM workload. The DTAW method is developed in three stages: scenario construction based on work domain analysis, task analysis, and workload estimation with eight workload components scored through task-analytic and projective methods. To demonstrate its utility, we applied the method to construct two SAM scenarios and predict the mental workload demand of operators in these scenarios as compared to two design basis accident scenarios. With statistical analysis, the DTAW method can predict the overall subjective workload rated by NPP operators, be used to identify high-load tasks, cluster tasks with similar workload patterns, and provide direct implications for improving SAM strategies and supporting systems. Practitioner summary: To predict mental workload in severe accident management (SAM) scenarios in nuclear power plants, we proposed an analytic method and applied it to estimate mental workload in two SAM scenarios and two design basis accident (DBA) scenarios. We found that the workload pattern in SAM scenarios is different from that in DBA scenarios.
引用
收藏
页码:261 / 290
页数:30
相关论文
共 152 条
[1]  
Aldrich T. B., 1989, APPL HUMAN PERFORMAN, P65
[2]   Overview of plant specific severe accident management strategies for Kozloduy nuclear power plant, WWER-1000/320 [J].
Andreeva, M. ;
Pavlova, M. P. ;
Groudev, P. P. .
ANNALS OF NUCLEAR ENERGY, 2008, 35 (04) :555-564
[3]  
Annett J., 1967, OCCUP PSYCHOL, V41, P211
[4]  
[Anonymous], 1993, Human Factors in Engineering and Design
[5]  
[Anonymous], 1992, A guide to task analysis: The task analysis working group
[6]  
[Anonymous], 1999, Cognitive Work Analysis: Toward Safe, Productive, and Healthy Computer-Based Work
[7]   A passive brain-computer interface application for the mental workload assessment on professional air traffic controllers during realistic air traffic control tasks [J].
Arico, P. ;
Borghini, G. ;
Di Flumeri, G. ;
Colosimo, A. ;
Pozzi, S. ;
Babiloni, F. .
BRAIN-COMPUTER INTERFACES: LAB EXPERIMENTS TO REAL-WORLD APPLICATIONS, 2016, 228 :295-328
[8]  
Barnett J. S., 2003, P HUMAN FACTORS ERGO, V47, P961, DOI [10.1177/15419312030470080, DOI 10.1177/154193120304700802]
[9]   ANALYTICAL MODELING AND EXPERIMENTAL-STUDY OF HUMAN WORKLOAD IN SCHEDULING OF ADVANCED MANUFACTURING SYSTEMS [J].
BI, SX ;
SALVENDY, G .
INTERNATIONAL JOURNAL OF HUMAN FACTORS IN MANUFACTURING, 1994, 4 (02) :205-234
[10]   The impact of secondary task cognitive processing demand on driving performance [J].
Blanco, Myra ;
Biever, Wayne J. ;
Gallagher, John P. ;
Dingus, Thomas A. .
ACCIDENT ANALYSIS AND PREVENTION, 2006, 38 (05) :895-906