Cracking Characteristics and Mechanism of Internal Components of Large-Span Shield Tunnel

被引:0
作者
Dong, Fei [1 ]
Li, Ao [1 ]
Huang, Jun [1 ]
Zhao, Guang [1 ]
Chen, Ningwei [2 ]
机构
[1] JSTI Grp, Nanjing 210029, Peoples R China
[2] Nanjing Metro Operat Co Ltd, Nanjing 210046, Peoples R China
关键词
INSPECTION;
D O I
10.1155/2023/2003441
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
With the ever-increasing number of large-span shield tunneling projects and the extended operational time, their distinctive internal component issues are becoming more pronounced and exhibiting unique characteristics. In order to reveal the cracking mechanism of concrete on the top of the middle partition wall, based on a large-span shield tunnel section of Nanjing Metro, the crack mode, distribution characteristics, and cracking process of concrete inside tunnel structure were studied by combined field investigation and extended finite element analysis. The results showed that: (1) there were 96 cracks of concrete on the top of the middle partition wall in the interval. Based on the propagation path, number, and shape of cracks, they could be divided into type I, II, III, Y, and Z, with type-Y and type-Z being subtypes of type-I. (2) The crack started at the opposite side of horizontal differential displacement of the flue plate. The development curves of the length and end width of type-I and type-II cracks showed the significant characteristics of three stages. The relationship between crack end width and length was nonlinear, showing that 250 and 225 mm, respectively, were the critical crack lengths growing with the rapid growth of the end width of type-I and type-II cracks. (3) In type-II cracks, the propagation curves of two cracks under the same working condition were consistent, and the spacing of plate joints greatly influenced the length and slope of each stage of the curve. For type-III cracks, the first crack propagation process was basically consistent with type-I and type-II cracks, and the propagation of the other two cracks had obvious brittle characteristics.
引用
收藏
页数:16
相关论文
共 17 条
[1]   Investigation on inspection scheduling for the maintenance of tunnel with different degradation modes [J].
Ai, Qing ;
Yuan, Yong ;
Shen, Shui-Long ;
Wang, Hui ;
Huang, Xingchun .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 106
[2]  
[Anonymous], 2010, UDC Code for Design of Concrete Structures: GB 50010-2010
[3]  
[Anonymous], 1991, CEB-FIP model code 1990: Design code
[4]   Tunnel inspection using photogrammetric techniques and image processing: A review [J].
Attard, Leanne ;
Debono, Carl James ;
Valentino, Gianluca ;
Di Castro, Mario .
ISPRS JOURNAL OF PHOTOGRAMMETRY AND REMOTE SENSING, 2018, 144 :180-188
[5]   Vision-based change detection for inspection of tunnel liners [J].
Attard, Leanne ;
Debono, Carl James ;
Valentino, Gianluca ;
Di Castro, Mario .
AUTOMATION IN CONSTRUCTION, 2018, 91 :142-154
[6]   Statistical prediction of fracture parameters of concrete and implications for choice of testing standard [J].
Bazant, ZP ;
Becq-Giraudon, E .
CEMENT AND CONCRETE RESEARCH, 2002, 32 (04) :529-556
[7]   Finite-Element Modeling of Intermediate Crack Debonding in FRP-Plated RC Beams [J].
Chen, G. M. ;
Teng, J. G. ;
Chen, J. F. .
JOURNAL OF COMPOSITES FOR CONSTRUCTION, 2011, 15 (03) :339-353
[8]   State-of-the-Art Review on Failure Mechanism and Waterproofing Performance of Linings for Shield Tunnels [J].
Du, Shaoshuai ;
Tang, Jinhua .
ADVANCES IN CIVIL ENGINEERING, 2022, 2022
[9]   Failure mechanism of joint waterproofing in precast segmental tunnel linings [J].
Gong, Chenjie ;
Ding, Wenqi ;
Soga, Kenichi ;
Mosalam, Khalid M. .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 84 :334-352
[10]   Multispectral water leakage detection based on a one-stage anchor-free modality fusion network for metro tunnels [J].
Han, Lei ;
Chen, Jiangfan ;
Li, Haobo ;
Liu, Genshuo ;
Leng, Biao ;
Ahmed, Ammar ;
Zhang, Zutao .
AUTOMATION IN CONSTRUCTION, 2022, 140