Mathematical model and a variable neighborhood search algorithm for mixed-model robotic two-sided assembly line balancing problems with sequence-dependent setup times

被引:18
作者
Aslan, Sehmus [1 ]
机构
[1] Mardin Artuklu Univ, Business Adm, Mardin, Turkey
关键词
Mixed-model; Robotic; Two-sided assembly line balancing; Sequence-dependent setup times; Variable neighborhood search; GENETIC ALGORITHM; OPTIMIZATION ALGORITHM;
D O I
10.1007/s11081-022-09718-3
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Human labor is generally being replaced with robots for high automation, increased flexibility, and reduced costs in modern industry. Few studies consider the sequence-dependent setup times in the assembly line balancing literature. However, it should not be overlooked in a real-life setting. This article presents a new mathematical model and variable neighborhood search (VNS) algorithm for mixed-model robotic two-sided assembly line balancing, with the aim of minimizing the cycle time by considering the sequence-dependent setup times. The effectiveness of the proposed VNS is tested with a set of test problems from the literature. The computational results and statistical analysis indicate that the proposed method yields promising results.
引用
收藏
页码:989 / 1016
页数:28
相关论文
共 48 条
[31]   Balancing two-sided assembly lines with sequence-dependent setup times [J].
Ozcan, Ugur ;
Toklu, Bilal .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (18) :5363-5383
[32]   Balancing of mixed-model two-sided assembly lines [J].
Ozcan, Ugur ;
Toklu, Bilal .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (01) :217-227
[33]   Multi-objective metaheuristics for solving a type II robotic mixed-model assembly line balancing problem [J].
Rabbani, Masoud ;
Mousavi, Zahra ;
Farrokhi-Asl, Hamed .
JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (07) :472-484
[34]  
Roshanaei HZ., 2021, INFORMS J COMPUT, V162, P201, DOI [10.1287/ijoc.2020.1015, DOI 10.1287/IJOC.2020.1015]
[35]  
Rubinovitz J., 1993, CIRP Annals - Manufacturing Technology, V42, P497, DOI [10.1016/S0007-8506(07)62494-9, DOI 10.1016/S0007-8506(07)62494-9]
[36]   Developing optimization & robust models for a mixed-model assembly line balancing problem with semi-automated operations [J].
Samouei, Parvaneh ;
Ashayeri, Jalal .
APPLIED MATHEMATICAL MODELLING, 2019, 72 :259-275
[37]   The sequence-dependent assembly line balancing problem [J].
Scholl, Armin ;
Boysen, Nils ;
Fliedner, Malte .
OR SPECTRUM, 2008, 30 (03) :579-609
[38]   The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics [J].
Scholl, Armin ;
Boysen, Nils ;
Fliedner, Malte .
OR SPECTRUM, 2013, 35 (01) :291-320
[39]   A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasks [J].
Seyed-Alagheband, S. A. ;
Ghomi, S. M. T. Fatemi ;
Zandieh, M. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (03) :805-825
[40]   2-ANTBAL: An ant colony optimisation algorithm for balancing two-sided assembly lines [J].
Simaria, Ana S. ;
Vilarinho, Pedro M. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (02) :489-506