Forecasting Construction Cost Index through Artificial Intelligence
被引:4
作者:
Aslam, Bilal
[1
]
Maqsoom, Ahsen
[2
]
Inam, Hina
[3
]
ul Basharat, Mubeen
[4
]
Ullah, Fahim
[5
]
机构:
[1] No Arizona Univ, Sch Informat Comp & Cyber Syst, Flagstaff, AZ 86011 USA
[2] COMSATS Univ Islamabad, Dept Civil Engn, Wah Cantt 47040, Pakistan
[3] Natl Univ Sci & Technol, Coll Elect & Mech Engn, Rawalpindi 44000, Pakistan
[4] HITEC Univ, Dept Comp Sci & Engn, Taxila 47080, Pakistan
[5] Univ Southern Queensland, Sch Surveying & Built Environm, Springfield, Qld 4300, Australia
来源:
SOCIETIES
|
2023年
/
13卷
/
10期
关键词:
building materials;
construction cost index (CCI);
developing countries;
cost estimation;
artificial neural network (ANN);
TIME-SERIES;
NEURAL-NETWORKS;
PREDICTION;
ACCURACY;
ANN;
D O I:
10.3390/soc13100219
中图分类号:
C91 [社会学];
学科分类号:
030301 ;
1204 ;
摘要:
This study presents a novel approach for forecasting the construction cost index (CCI) of building materials in developing countries. Such estimations are challenging due to the need for a longer time, the influence of inflation, and fluctuating project prices in developing countries. This study used three techniques-a modified Artificial Neural Network (ANN), time series, and linear regression-to predict and forecast the local building material CCI in Pakistan. The predicted CCI is based on materials, including bricks, steel, cement, sand, and gravel. In addition, the swish activation function was introduced to increase the accuracy of the associated algorithms. The results suggest that the ANN model has superior prediction results, with the lowest Mean Error (ME), Mean Absolute Error (MAE), and Theil's U statistic (U-Stat) values of 0.04, 28.3, and 0.62, respectively. The time series and regression models have ME values of 0.22 and 0.3, MAE values of 30.07 and 28.3, and U-Stat values of 0.65 and 0.64, respectively. The proposed models can assist contractors, project managers, and owners through an accurately estimated cost index. Such accurate CCIs help correctly estimate project budgets based on building material prices to mitigate project risks, delays, and failures.