Optimal Configuration of Power-to-Heat Equipment Considering Peak-Shaving Ancillary Service Market

被引:1
|
作者
Yu, Yanjuan [1 ]
Zhou, Guohua [1 ]
Wu, Kena [1 ]
Chen, Cheng [1 ]
Bian, Qiang [1 ]
机构
[1] Naval Univ Engn, Coll Elect Engn, Wuhan 430030, Peoples R China
基金
中国国家自然科学基金;
关键词
combined heat and power; power-to-heat equipment; peak-shaving ancillary service market; optimal configuration; wind power integration; WIND POWER; ELECTRIC BOILERS; TECHNOLOGIES; STORAGE; SYSTEM; ACCOMMODATION; INTEGRATION;
D O I
10.3390/en16196860
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The serious problem of wind power curtailment in northern China has created a pressing need to enhance the peak-shaving ability of the power system. As the main source of power supply in northern China, combined heat and power (CHP) units have significant potential for peak-shaving. Currently, the Chinese government encourages CHP plants to increase their peak-shaving capacity by installing power-to-heat (P2H) equipment. In addition, the government has implemented auxiliary service market policies to encourage CHP plants to provide peak-shaving services. In order to maximize economic benefits for CHP plants, this paper proposes an optimal configuration method of P2H equipment with the static payback time (SPT) as the objective function. Cost and income models of installing the P2H equipment are constructed by taking into account the auxiliary service market policies. The peak-shaving income model of the CHP plant is derived emphatically as a key part of the proposed method. Finally, the district heating region in Jilin province is used as a case study example. The results show that adding the P2H equipment is significantly effective in improving the peak-shaving ability of CHP units, and investing in heat pumps is more cost-effective than electric boilers. The proposed method can be applied to other northern regions relying on CHP units for central heating, providing a valuable solution to the problem of wind power curtailment in these regions.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] HIERARCHICAL OPTIMAL SCHEDULING STRATEGY FOR CONCENTRATING SOLAR POWER PARTICIPATING IN DEEP PEAK SHAVING CONSIDERING DEMAND RESPONSE
    Chen W.
    Liu W.
    Wei Z.
    Zhang X.
    Li W.
    Feng Z.
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2024, 45 (03): : 579 - 590
  • [42] A Multi-Source Coordinated Optimal Operation Model Considering the Risk of Nuclear Power Peak Shaving and Wind Power Consumption
    Zhao, Jie
    Ma, Yuhui
    Liu, Qi
    Wen, Libin
    Jia, Chenyiyang
    Fang, Yudi
    IEEE ACCESS, 2020, 8 : 189702 - 189719
  • [43] Optimizing peak-shaving cooperation among electric vehicle charging stations: A two-tier optimal dispatch strategy considering load demand response potential
    Xie, Tuo
    Su, Yang
    Zhang, Gang
    Zhang, Kaoshe
    Li, Hua
    Wang, Ruogu
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2024, 162
  • [44] Modeling and simulation analysis of waste heat recovery heating system for flue gas of peak-shaving gas-fired combined heat and power plant with distributed heat pump
    分布式热泵调峰型燃气热电联产烟气余热回收供热系统建模及模拟分析
    Zhao, Xiling (zhaoxiling@126.com), 2018, Science Press (39):
  • [45] Peak shaving control model of power load participation system considering day-ahead spot market risk
    Han X.
    Liu W.
    Pan Q.
    Shen Z.
    Li Y.
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2022, 50 (17): : 55 - 67
  • [46] Modeling and operation strategy of nuclear power plant with electric heat storage in the ancillary service market
    Wang, Haixin
    Mu, Siyu
    Li, Gen
    Yang, Zihao
    Yang, Junyou
    Marquez, Fausto Pedro Garcia
    Zhou, Xiran
    Ma, Yiming
    Chen, Zhe
    NUCLEAR ENGINEERING AND DESIGN, 2023, 415
  • [47] Research on Operation Analysis Method of East China Power Grid Peak-Regulation Ancillary Service Market
    Zhang Huaiyu
    Guo Xiaorui
    Hu Hong
    Lu Jianyu
    Teng Xiaobi
    Chen Xinyi
    2020 5TH ASIA CONFERENCE ON POWER AND ELECTRICAL ENGINEERING (ACPEE 2020), 2020, : 967 - 971
  • [48] Chronological operation simulation for power system with peak regulation ancillary service market in China: Formulation, solving, and validation
    Wei, Lishen
    Ai, Xiaomeng
    Fang, Jiakun
    Lou, Yixuan
    Liao, Shiwu
    Wen, Jinyu
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2023, 152
  • [49] Market Mechanism and Clearing Model of Inter-provincial Peak Regulation Ancillary Service for Regional Power Grid
    Xu F.
    Ge Z.
    Wu X.
    Zhu M.
    Tu M.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2019, 43 (16): : 109 - 115
  • [50] Low-carbon economic dispatching of power system considering joint peak shaving of generalized energy storage and carbon capture equipment
    Cui Y.
    An N.
    Fu X.
    Zhao Y.
    Zhong W.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2023, 43 (08): : 40 - 48