A process-based hydrological model for continuous multi-year simulations of large-scale watersheds

被引:1
|
作者
Politano, Marcela [1 ,2 ]
Arenas, Antonio [1 ,3 ]
Weber, Larry [1 ]
机构
[1] Univ Iowa, IIHR Hydrosci & Engn, Iowa City, IA 52242 USA
[2] US Army, Engineer Res & Dev Ctr ERDC, Vicksburg, MS USA
[3] Iowa State Univ Sci & Technol, Ames, IA 50011 USA
关键词
Hydrological model; process-based model; surface-subsurface interactions; Cedar River Watershed; GHOST; DIAGNOSE INTEGRATED HYDROLOGY; TILE DRAINAGE; SURFACE; FLOW; ACCURACY; SOIL; IOWA; SET; LAI;
D O I
10.1080/15715124.2023.2216937
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Process-based hydrological models are useful tools to understand the mechanisms responsible for extreme floods and droughts and thus facilitate watershed management. This paper describes a watershed model, based on the coupled surface-subsurface distributed model Penn State Hydrologic Model (PIHM), to capture the hydrologic response of large watersheds over decades. Mathematical models for coupling surface-subsurface fluxes were developed to achieve mass conservation in multi-year simulations. A Voronoi technique was implemented to improve accuracy and computational efficiency. The model was used to simulate the Cedar River Watershed, IA, from 2003 to 2018. Model predictions were compared against streamflow observations at four gauging stations. Results show good model performance with average Nash-Sutcliffe efficiency values greater than 0.70. The model results helped to identify the main hydrologic processes that contributed to the historic 2008 flood in the Cedar River Watershed. In addition to heavy storms, several other factors played an important role, including snowmelt and rainstorms in the spring, as well as low evapotranspiration values associated with traditional row crop agriculture in the first half of the year.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] Large-scale multi-agent transportation simulations
    Cetin, N
    Nagel, K
    Raney, B
    Voellmy, A
    COMPUTER PHYSICS COMMUNICATIONS, 2002, 147 (1-2) : 559 - 564
  • [22] Homotopy based backtracking method for large-scale process simulations with load variation
    Zhu, Ling-Yu
    Chen, Zhi-Qiang
    Chen, Xi
    Shao, Zhi-Jiang
    Qian, Ji-Xin
    Gao Xiao Hua Xue Gong Cheng Xue Bao/Journal of Chemical Engineering of Chinese Universities, 2009, 23 (04): : 690 - 695
  • [23] Multi-directional continuous traffic model for large-scale urban networks
    Tumash, Liudmila
    Canudas-de-Wit, Carlos
    Delle Monache, Maria Laura
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2022, 158 : 374 - 402
  • [24] Assessing the implementation processes of a large-scale, multi-year quality improvement initiative: survey of health care providers
    Donna Goodridge
    Masud Rana
    Elizabeth L. Harrison
    Thomas Rotter
    Roy Dobson
    Gary Groot
    Sonia Udod
    Joshua Lloyd
    BMC Health Services Research, 18
  • [25] Assessing the implementation processes of a large-scale, multi-year quality improvement initiative: survey of health care providers
    Goodridge, Donna
    Rana, Masud
    Harrison, Elizabeth L.
    Rotter, Thomas
    Dobson, Roy
    Groot, Gary
    Udod, Sonia
    Lloyd, Joshua
    BMC HEALTH SERVICES RESEARCH, 2018, 18
  • [26] Multi-year in situ hydrogeochemical monitoring of hard rock lithium mine tailings in a large-scale experimental pile
    Roy, Tomy
    Plante, Benoit
    Demers, Isabelle
    Benzaazoua, Mostafa
    Isabel, Denis
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2024, 356
  • [27] KEY FACTORS FOR IMPROVING LARGE-SCALE HYDROLOGICAL MODEL PERFORMANCE
    Andersson, J. C. M.
    Pechlivanidis, I. G.
    Gustafsson, D.
    Donnelly, C.
    Arheimer, B.
    PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2013,
  • [28] A hydrological process-based neural network model for hourly runoff forecasting
    Gao, Shuai
    Zhang, Shuo
    Huang, Yuefei
    Han, Jingcheng
    Zhang, Ting
    Wang, Guangqian
    ENVIRONMENTAL MODELLING & SOFTWARE, 2024, 176
  • [29] Large-scale brain network model and multi-band electroencephalogram rhythm simulations
    Al-Hossenat, Auhood
    Wen, Peng
    Li, Yan
    INTERNATIONAL JOURNAL OF BIOMEDICAL ENGINEERING AND TECHNOLOGY, 2022, 38 (04) : 395 - 409
  • [30] LARGE-SCALE SIMULATIONS OF THE KINETIC ISING-MODEL
    MUNKEL, C
    INTERNATIONAL JOURNAL OF MODERN PHYSICS C-PHYSICS AND COMPUTERS, 1993, 4 (06): : 1137 - 1145