Joint maintenance planning and production scheduling optimization model for green environment

被引:0
|
作者
Attia, Ahmed M. [1 ,2 ]
Alatwi, Ahmad O. [1 ,2 ]
Al Hanbali, Ahmad [1 ,2 ]
Alsawafy, Omar G. [1 ,3 ]
机构
[1] King Fahd Univ Petr & Minerals, Dept Ind & Syst Engn, Dhahran, Saudi Arabia
[2] King Fahd Univ Petr & Minerals, Interdisciplinary Res Ctr Smart Mobil & Logist, Dhahran, Saudi Arabia
[3] King Fahd Univ Petr & Minerals, Interdisciplinary Res Ctr Intelligent Mfg & Robot, Dhahran, Saudi Arabia
关键词
Maintenance planning; Production scheduling; Green environment; Mixed-integer nonlinear programming; MACHINE; INSPECTION; ALGORITHM;
D O I
10.1108/JQME-05-2023-0047
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposeThis research integrates maintenance planning and production scheduling from a green perspective to reduce the carbon footprint.Design/methodology/approachA mixed-integer nonlinear programming (MINLP) model is developed to study the relation between production makespan, energy consumption, maintenance actions and footprint, i.e. service level and sustainability measures. The speed scaling technique is used to control energy consumption, the capping policy is used to control CO2 footprint and preventive maintenance (PM) is used to keep the machine working in healthy conditions.FindingsIt was found that ignoring maintenance activities increases the schedule makespan by more than 21.80%, the total maintenance time required to keep the machine healthy by up to 75.33% and the CO2 footprint by 15%.Research limitations/implicationsThe proposed optimization model can simultaneously be used for maintenance planning, job scheduling and footprint minimization. Furthermore, it can be extended to consider other maintenance activities and production configurations, e.g. flow shop or job shop scheduling.Practical implicationsMaintenance planning, production scheduling and greenhouse gas (GHG) emissions are intertwined in the industry. The proposed model enhances the performance of the maintenance and production systems. Furthermore, it shows the value of conducting maintenance activities on the machine's availability and CO2 footprint.Originality/valueThis work contributes to the literature by combining maintenance planning, single-machine scheduling and environmental aspects in an integrated MINLP model. In addition, the model considers several practical features, such as machine-aging rate, speed scaling technique to control emissions, minimal repair (MR) and PM.
引用
收藏
页码:153 / 174
页数:22
相关论文
共 50 条
  • [1] A methodology for joint optimization for maintenance planning, process quality and production scheduling
    Pandey, Divya
    Kulkarni, Makarand S.
    Vrat, Prem
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (04) : 1098 - 1106
  • [2] Joint Optimization of Maintenance and Production Scheduling
    Kiani, Amirkiarash
    Taghipour, Sharareh
    2017 ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2017,
  • [3] A Joint Optimization Model for Production Scheduling and Preventive Maintenance Interval
    Babaeimorad, S.
    Fattahi, P.
    Fazlollahtabar, H.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2021, 34 (11): : 2508 - 2516
  • [4] A joint optimization model for production scheduling and preventive maintenance interval
    Babaeimorad S.
    Fattahi P.
    Fazlollahtabar H.
    International Journal of Engineering, Transactions B: Applications, 2021, 34 (11): : 2508 - 2516
  • [5] Single-machine-based joint optimization of predictive maintenance planning and production scheduling
    Liu Qinming
    Dong Ming
    Chen, F. F.
    Lv Wenyuan
    Ye Chunming
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2019, 55 : 173 - 182
  • [6] Single-machine-based joint optimization of predictive maintenance planning and production scheduling
    Liu, Qinming
    Dong, Ming
    Chen, F. F.
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2018, 51 : 238 - 247
  • [7] Multiobjective Joint Optimization of Production Scheduling and Maintenance Planning in the Flexible Job-Shop Problem
    Ye, Jianfei
    Ma, Huimin
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [8] Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems
    Mishra, Aseem K.
    Shrivastava, Divya
    Tarasia, Devesh
    Rahim, Abdur
    ANNALS OF OPERATIONS RESEARCH, 2022, 316 (01) : 401 - 444
  • [9] Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems
    Aseem K. Mishra
    Divya Shrivastava
    Devesh Tarasia
    Abdur Rahim
    Annals of Operations Research, 2022, 316 : 401 - 444
  • [10] Joint optimization of production scheduling and machine group preventive maintenance
    Xiao, Lei
    Song, Sanling
    Chen, Xiaohui
    Coit, David W.
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2016, 146 : 68 - 78