A framework to standardize causes of construction delay

被引:4
|
作者
Amarkhil, Qais [1 ]
Elwakil, Emad [1 ]
Hubbard, Bryan [1 ]
Byrd, Vetria L. [2 ]
机构
[1] Purdue Univ, Sch Construct Management, W Lafayette, IN 47907 USA
[2] Purdue Univ, Sch Comp Graph, W Lafayette, IN 47907 USA
关键词
Causes of delay; critical causes of delay; framework; standardized format; PROJECTS; TIME; COST; OVERRUNS; INDUSTRY;
D O I
10.1080/15623599.2021.2009097
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Available literature shows no standard method or framework to identify critical causes of delay and assess its impact on the construction project. The use of ambiguous phrases and unstructured identification of causes has resulted in the ineffectiveness of the study findings. Therefore, this study has developed a framework to identify critical causes of delay through a systematic approach. This systematic approach helps to identify critical causes of delay in a standardized format. The framework categorically sequences causes of delay and connects them to the responsible party. From the obtained data, three hundred thirty-five critical causes of delay were extracted, categorized into 14 groups, and summarized into 48 major critical causes presented in tables. This study provides a comprehensive list and reference of the critical causes identified in the past 10 years. The study also quantitatively analysed the collected data presented in tables. The developed framework and approach minimize alternate and ambiguous phrasing, enhance study findings application in practice, and increases the research outcome's consistency.
引用
收藏
页码:1791 / 1804
页数:14
相关论文
共 50 条
  • [1] Causes of Delay in Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    Dmaidi, Nabil
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (03) : 300 - 310
  • [2] Causes of delay in large construction projects
    Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia
    Int. J. Proj. Manage., 2006, 4 (349-357):
  • [3] CAUSES OF DELAY IN INDIAN CONSTRUCTION INDUSTRY
    Venkatesh, M. P.
    Renuka, S. M.
    Umarani, C.
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2768 - 2773
  • [4] Causes of construction delay: Traditional contracts
    Odeh, A.M.
    Battaineh, H.T.
    International Journal of Project Management, 2002, 20 (01) : 67 - 73
  • [5] Causes of delay in construction projects in Oman
    Umar, Tariq
    MIDDLE EAST JOURNAL OF MANAGEMENT, 2018, 5 (02) : 121 - 136
  • [6] Causes of Delay in Construction Industry in Iran
    Kouchaknezhad, Mehran
    Ali, Abang Abdullah Abang
    Kadir, Mohammad Razali Abdul
    INTERNATIONAL CONSTRUCTION BUSINESS & MANAGEMENT SYMPOSIUM 2011: WINNING & SUSTAINABLE STRATEGIES FOR INTERNATIONAL PROJECTS, 2011, : 211 - 217
  • [7] Review of Delay Causes in Construction Projects
    AlGheth, Abdulhamid
    Sayuti, Md Ishak
    PROCEEDINGS OF AICCE'19: TRANSFORMING THE NATION FOR A SUSTAINABLE TOMORROW, 2020, 53 : 429 - 437
  • [8] Causes of Delay in Road Construction Projects in Afghanistan
    Kivrak, Serkan
    Baha, Mohammad Yonis
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2024, 83 (01): : 46 - 57
  • [9] Causes of Delay in Smart and Complex Construction Projects
    Radman, Kambiz
    Babaeian Jelodar, Mostafa
    Ghazizadeh, Eghbal
    Wilkinson, Suzanne
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2021, 13 (04)
  • [10] Causes of Delay in Public Construction Projects in Iraq
    Bekr, Ghanim A.
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2015, 9 (02) : 149 - 162