Research on the construction safety risk assessment of prefabricated subway stations in China

被引:16
作者
Luo, Zhenhua [1 ]
Guo, Juntao [1 ]
Han, Jianqiang [2 ]
Wang, Yuhong [3 ]
机构
[1] Southwest Petr Univ, Sch Civil Engn & Geomat, Chengdu, Peoples R China
[2] China Railway Acad Co Ltd, Chengdu, Peoples R China
[3] Sichuan Coll Architectural Technol, Deyang, Peoples R China
关键词
Prefabricated subway station; Construction safety; Risk assessment; Evidence theory; Matter-element theory; Structure entropy weight;
D O I
10.1108/ECAM-04-2022-0340
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposePrefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in China is in the initial stage of development, which is prone to construction safety issues. This study aims to evaluate the construction safety risks of prefabricated subway stations in China and formulate corresponding countermeasures to ensure construction safety.Design/methodology/approachA construction safety risk evaluation index system for the prefabricated subway station was established through literature research and the Delphi method. Furthermore, based on the structure entropy weight method, matter-element theory and evidence theory, a hybrid evaluation model is developed to evaluate the construction safety risks of prefabricated subway stations. The basic probability assignment (BPA) function is obtained using the matter-element theory, the index weight is calculated using the structure entropy weight method to modify the BPA function and the risk evaluation level is determined using the evidence theory. Finally, the reliability and applicability of the evaluation model are verified with a case study of a prefabricated subway station project in China.FindingsThe results indicate that the level of construction safety risks in the prefabricated subway station project is relatively low. Man risk, machine risk and method risk are the key factors affecting the overall risk of the project. The evaluation results of the first-level indexes are discussed, and targeted countermeasures are proposed. Therefore, management personnel can deeply understand the construction safety risks of prefabricated subway stations.Originality/valueThis research fills the research gap in the field of construction safety risk assessment of prefabricated subway stations. The methods for construction safety risk assessment are summarized to establish a reliable hybrid evaluation model, laying the foundation for future research. Moreover, the construction safety risk evaluation index system for prefabricated subway stations is proposed, which can be adopted to guide construction safety management.
引用
收藏
页码:1751 / 1787
页数:37
相关论文
共 69 条
  • [1] APPLICATION OF DELPHI METHOD IN CONSTRUCTION ENGINEERING AND MANAGEMENT RESEARCH: A QUANTITATIVE PERSPECTIVE
    Ameyaw, Effah Ernest
    Hu, Yi
    Shan, Ming
    Chan, Albert P. C.
    Le, Yun
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2016, 22 (08) : 991 - 1000
  • [2] [Anonymous], 2010, 1817342010 GB
  • [3] [Anonymous], 2008, 504482008 GBT
  • [4] [Anonymous], 2011, 507152011 GB
  • [5] [Anonymous], 2003, 192502013 GBT
  • [6] Utilizing and Adapting the Delphi Method for Use in Qualitative Research
    Brady, Shane R.
    [J]. INTERNATIONAL JOURNAL OF QUALITATIVE METHODS, 2015, 14
  • [7] Cai W., 1998, SYSTEMS ENG THEORY P, V1, P76, DOI DOI 10.3321/J.ISSN:1000-6788.1998.01.014
  • [8] CAMET (China Association of Metros), 2021, URB RAIL TRANS 2020
  • [9] Chen, 2015, RAILWAY CONSTRUCTION, V4, P62
  • [10] Chen J.H., 2015, RAILWAY CONSTRUCTION, V4, P69