Leanness assessment of a complex assembly line using integrated value stream mapping: a case study

被引:13
|
作者
Sangwa, Narpat Ram [1 ]
Sangwan, Kuldip Singh [2 ]
机构
[1] Indian Inst Management Sirmaur, Area Operat & Supply Chain Management, Paonta Sahib, India
[2] Birla Inst Technol & Sci Pilani, Mech Engn Dept, Pilani, Rajasthan, India
关键词
Value stream mapping; Lean; Complex assembly line application of lean; Lean assessment; Integrated VSM; CYCLE TIME REDUCTION; SUPPLY CHAIN; PERFORMANCE; SYSTEMS; VSM; DESIGN;
D O I
10.1108/TQM-12-2021-0369
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose This paper proposes an integrated value stream mapping (VSM) for a complex assembly line to improve the leanness of a complex automotive component manufacturing organization. Design/methodology/approach This study depicts the application of VSM at the case organization, where top management is concerned about the challenges of higher cycle time and lower productivity. Gemba walks were conducted to establish the concept of "walk the flow, create the flow" along the assembly line. The multi-hierarchical cross-functional team developed the current value stream map to know the "as-is" state. Then, the team analysed the current VSM and proposed the future VSM for the "to-be" state. Findings The integrated VSM shows different processes and work cells, various wastes, non-value-added activities, cycle time, uptime and the material and information flows for both products of the assembly line on the same map. The integrated VSM reduced cycle time, non-value-added activities, work in process inventory and improved line efficiency and production per labour hour for both the products, simultaneously. Research limitations/implications The limitation of the study is that the study focussed only on the application of VSM for one complex assembly only. Future research may be conducted using the developed integrated VSM approach in other complex production environments. Practical implications Managers can identify and reduce system waste by incorporating the concept of integrated VSM in a complex production or assembly environment where two or more products are being manufactured/assembled with low similarity. Originality/value The application of VSM for assembly lines is highly challenging because of merging flows, a large number of child parts in the lines and assembly of more than one product on the same line.
引用
收藏
页码:893 / 923
页数:31
相关论文
共 50 条
  • [31] COST VALUE-STREAM MAPPING AS A LEAN ASSESSMENT TOOL IN A SURGICAL GLOVE MANUFACTURING COMPANY
    Menon, Rajesh B.
    Shalij, P. R.
    Sajeesh, P.
    Tom, G.
    Pramod, V. R.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2021, 32 (01) : 157 - 170
  • [32] Empirical assessment of the future adequacy of value stream mapping in manufacturing industries
    Lugert, Andreas
    Batz, Aglaya
    Winkler, Herwig
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2018, 29 (05) : 886 - 906
  • [33] Continuous Improvement with Value Stream Mapping (VSM): A Case Study in SME Food Processing Industry
    Ramlan, Rohaizan
    Ahmad, Ahmad Nur Aizat
    Omar, Siti Sarah
    Suhaimi, Adam Harris
    ADVANCED SCIENCE LETTERS, 2017, 23 (01) : 674 - 678
  • [34] Value Stream Mapping as a Supporting Management Tool to Identify the Flow Of Industrial Waste: A Case Study
    Schoeman, Yolandi
    Oberholster, Paul
    Somerset, Vernon
    SUSTAINABILITY, 2021, 13 (01) : 1 - 15
  • [35] Assessing the leanness of a supply chain using multi-grade fuzzy logic: a health-care case study
    Almutairi, Abdulaziz Marzouq
    Salonitis, Konstantinos
    Al-Ashaab, Ahmed
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2019, 10 (01) : 81 - 105
  • [36] Advances and hotspots analysis of value stream mapping using bibliometrics
    Liu, Chaochao
    Zhang, Yang
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2023, 14 (01) : 190 - 208
  • [37] Designing a Future Value Stream Mapping to Reduce Lead Time using SMED-A Case Study
    Azizi, Amir
    Manoharan, Thulasi A. P.
    2ND INTERNATIONAL MATERIALS, INDUSTRIAL, AND MANUFACTURING ENGINEERING CONFERENCE, MIMEC2015, 2015, 2 : 153 - 158
  • [38] Improving Environmental and Production Performance in Construction Projects Using Value-Stream Mapping: Case Study
    Rosenbaum, Sergio
    Toledo, Mauricio
    Gonzalez, Vicente
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (02)
  • [39] Application of lean manufacturing using value stream mapping (VSM) in precast component manufacturing: A case study
    Sirajudeen, Rahima Shabeen
    Krishnan, K. Aravind
    MATERIALS TODAY-PROCEEDINGS, 2022, 65 : 1105 - 1111
  • [40] Sustainability-integrated value stream mapping with process mining
    Horsthofer-Rauch, Julia
    Guesken, Sarah Ranjana
    Weich, Jonas
    Rauch, Alexander
    Bittner, Maik
    Schulz, Julia
    Zaeh, Michael F.
    PRODUCTION AND MANUFACTURING RESEARCH-AN OPEN ACCESS JOURNAL, 2024, 12 (01):