Leanness assessment of a complex assembly line using integrated value stream mapping: a case study

被引:13
|
作者
Sangwa, Narpat Ram [1 ]
Sangwan, Kuldip Singh [2 ]
机构
[1] Indian Inst Management Sirmaur, Area Operat & Supply Chain Management, Paonta Sahib, India
[2] Birla Inst Technol & Sci Pilani, Mech Engn Dept, Pilani, Rajasthan, India
关键词
Value stream mapping; Lean; Complex assembly line application of lean; Lean assessment; Integrated VSM; CYCLE TIME REDUCTION; SUPPLY CHAIN; PERFORMANCE; SYSTEMS; VSM; DESIGN;
D O I
10.1108/TQM-12-2021-0369
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose This paper proposes an integrated value stream mapping (VSM) for a complex assembly line to improve the leanness of a complex automotive component manufacturing organization. Design/methodology/approach This study depicts the application of VSM at the case organization, where top management is concerned about the challenges of higher cycle time and lower productivity. Gemba walks were conducted to establish the concept of "walk the flow, create the flow" along the assembly line. The multi-hierarchical cross-functional team developed the current value stream map to know the "as-is" state. Then, the team analysed the current VSM and proposed the future VSM for the "to-be" state. Findings The integrated VSM shows different processes and work cells, various wastes, non-value-added activities, cycle time, uptime and the material and information flows for both products of the assembly line on the same map. The integrated VSM reduced cycle time, non-value-added activities, work in process inventory and improved line efficiency and production per labour hour for both the products, simultaneously. Research limitations/implications The limitation of the study is that the study focussed only on the application of VSM for one complex assembly only. Future research may be conducted using the developed integrated VSM approach in other complex production environments. Practical implications Managers can identify and reduce system waste by incorporating the concept of integrated VSM in a complex production or assembly environment where two or more products are being manufactured/assembled with low similarity. Originality/value The application of VSM for assembly lines is highly challenging because of merging flows, a large number of child parts in the lines and assembly of more than one product on the same line.
引用
收藏
页码:893 / 923
页数:31
相关论文
共 50 条
  • [1] Integration of value stream mapping with DMAIC for concurrent Lean-Kaizen: A case study on an air-conditioner assembly line
    Guo, Wei
    Jiang, Pingyu
    Xu, Lei
    Peng, Guangzhou
    ADVANCES IN MECHANICAL ENGINEERING, 2019, 11 (02)
  • [2] Application of value stream mapping (VSM) for lean and cycle time reduction in complex production environments: a case study
    Seth, Dinesh
    Seth, Nitin
    Dhariwal, Pratik
    PRODUCTION PLANNING & CONTROL, 2017, 28 (05) : 398 - 419
  • [3] Life cycle assessment integrated value stream mapping framework to ensure sustainable manufacturing: a case study
    S. Vinodh
    R. Ben Ruben
    P. Asokan
    Clean Technologies and Environmental Policy, 2016, 18 : 279 - 295
  • [4] Investigating the effect of value stream mapping on procurement effectiveness: a case study
    Jing, Shuwei
    Hou, Kaixuan
    Yan, Junai
    Ho, Zih-Ping
    Han, Lu
    JOURNAL OF INTELLIGENT MANUFACTURING, 2021, 32 (04) : 935 - 946
  • [5] Life cycle assessment integrated value stream mapping framework to ensure sustainable manufacturing: a case study
    Vinodh, S.
    Ben Ruben, R.
    Asokan, P.
    CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, 2016, 18 (01) : 279 - 295
  • [6] Modelling and Simulation the Value Stream Mapping - Case Study
    Pekarcikova, Miriam
    Trebuna, Peter
    Klimenti, Marek
    Kral, Stefan
    Dic, Michal
    MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2021, 12 (02) : 107 - 114
  • [7] Deployment of fuzzy TOPSIS-integrated value stream mapping for a fabrication industry: a case study
    Aadithya, B. G.
    Asokan, P.
    Vinodh, S.
    TQM JOURNAL, 2023, 35 (06) : 1532 - 1555
  • [8] Quantifying Leanness Combining Value Stream Mapping with a Data Envelopment Analysis Based Method - A Case Study at a Swedish Logistics Company
    Hjalmarsson, V.
    Olsson, L.
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 740 - 744
  • [9] Case study in using value stream mapping in online graduate education
    Bloomquist, Candace D.
    Holtz, Lydia
    Lampe, Angela M.
    Carmichael, Christine T.
    EVALUATION AND PROGRAM PLANNING, 2024, 105
  • [10] Value stream mapping for identification and assessment of material waste in construction: A case study
    Vilventhan, Aneetha
    Ram, V. G.
    Sugumaran, S.
    WASTE MANAGEMENT & RESEARCH, 2019, 37 (08) : 815 - 825