Evaluation of Probabilistic Project Cost Estimates

被引:8
作者
Jorgensen, Magne [1 ,2 ]
Welde, Morten [3 ]
Halkjelsvik, Torleif [1 ]
机构
[1] Simula Metropolitan Ctr Digital Engn, N-0167 Oslo, Norway
[2] Oslo Metropolitan Univ, N-0167 Oslo, Norway
[3] Norwegian Univ Sci & Technol, N-7491 Trondheim, Norway
关键词
Uncertainty; Probabilistic logic; Measurement uncertainty; Guidelines; Probability distribution; Position measurement; Loss measurement; Cost distribution; cost estimation bias; cost estimation error; cost overrun; cost prediction intervals; probabilistic cost estimation; SOFTWARE-DEVELOPMENT; ERROR MEASURES; FRONT-END; PERFORMANCE; UNDERESTIMATION; OVERCONFIDENCE; DISTRIBUTIONS;
D O I
10.1109/TEM.2021.3067050
中图分类号
F [经济];
学科分类号
02 ;
摘要
Evaluation of cost estimates should be fair and give incentives for accuracy. These goals, we argue, are challenged by a lack of precision in what is meant by a cost estimate and the use of evaluation measures that do not reward the most accurate cost estimates. To improve the situation, we suggest the use of probabilistic cost estimates and propose guidelines on how to evaluate such estimates. The guidelines emphasize the importance of a match between the type of cost estimate provided by the estimators and the chosen cost evaluation measure, and the need for an evaluation of both the calibration and the informativeness of the estimates. The feasibility of the guidelines is exemplified in an analysis of a set of 69 large Norwegian governmental projects. The evaluation indicated that the projects had quite accurate and unbiased P50 estimates and that the prediction intervals were reasonably well-calibrated. It also showed that the cost prediction intervals were noninformative with respect to differences in cost uncertainty and, consequently, not useful to identify projects with higher cost uncertainty. The results demonstrate the usefulness of applying the proposed cost estimation evaluation guidelines.
引用
收藏
页码:3481 / 3496
页数:16
相关论文
共 49 条
  • [1] Aljohani A., 2017, INT J INNOVATION MAN, V8, P137, DOI [DOI 10.18178/IJIMT.2017.8.2.717, 10.18178/ijimt.2017.8.2.717]
  • [2] Low estimates - high stakes: underestimation of costs at the front-end of projects
    Andersen, Bjorn
    Samset, Knut
    Welde, Morten
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2016, 9 (01) : 171 - 193
  • [3] [Anonymous], GOD STYRING STATSBYG
  • [4] [Anonymous], COST ENG TERM
  • [5] [Anonymous], 2016, KARTLEGGING TID KOST
  • [6] ON THE SELECTION OF ERROR MEASURES FOR COMPARISONS AMONG FORECASTING METHODS
    ARMSTRONG, JS
    FILDES, R
    [J]. JOURNAL OF FORECASTING, 1995, 14 (01) : 67 - 71
  • [7] Probabilistic forecasting of project performance using stochastic S curves
    Barraza, GA
    Back, WE
    Mata, F
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (01) : 25 - 32
  • [8] Batanero C, 2016, ICME-13 TOPICAL SURV, P1, DOI 10.1007/978-3-319-31625-3_1
  • [9] Bias and error in mine project capital cost estimation
    Resource Capital Funds, Denver, CO, United States
    不详
    不详
    [J]. Engineering Economist, 2008, 53 (02) : 118 - 139
  • [10] Bukkestein, 2020, KARTLEGGING STATUS P