Comparing bird strike risk assessment methods: a new perspective for safety management

被引:3
|
作者
Gutierrez Serralde, Sandra Mariel [1 ]
Soldatitni, Cecilia [1 ]
Albores-Barajas, Yuri V. [2 ]
Patricia Rosas-Hernandez, Martha [1 ]
de la Cueva, Horacio [3 ]
Rangel Baron, Pablo [4 ]
机构
[1] Ctr Invest Cient & Educ Super Ensenada, Baja California Unidad La Paz, Lab Aeroecol Marina, Miraflores 334, La Paz 23050, Baja Calif Sur, Mexico
[2] CIMACO Univ Autonoma Baja California, CONACYT Consejo Nacl Ciencia & Tecnol, Av Insurgentes 1582, La Paz 03240, Baja Calif Sur, Mexico
[3] Ctr Invest Cient & Educ Super Ensenada, Dept Biol Conserevac, Carretera Ensenada Tijuana 3918, Ensenada 22860, Baja California, Mexico
[4] Grp Aeroportuario Pacifico, Ave Mariano Otero 1249-B Piso 6, Guadalajara 44530, Jalisco, Mexico
关键词
Airport safety; Indexes; Wildlife strike; PCA; HCA; AIRCRAFT; COLLISIONS;
D O I
10.1007/s10344-023-01691-1
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
Bird and other wildlife strikes are an ever-increasing concern in the aeronautic industry. Several countries have developed methods to mitigate wildlife strikes, where indexes are valuable tools to reinforce airport wildlife management plans. Nevertheless, an international consensus on the application of a single method is lacking. Mexico follows the international normative, but there is ample room to develop new strategies to approach the wildlife strike phenomena. We evaluate, contrast, and compare three commonly used indexes in three Mexican airports, the heuristic risk assessment, the R index, and the bird strike risk assessment 2 (BRI2). These indexes use different methods to obtain their assessment value; thus, we use the more informative variables to effectively highlight the species scored as problematic to coincide with the species involved in wildlife strikes. The heuristic risk assessment showed risk values only for two airports, while outcomes of the R index and the BRI2 are similar at all airports. All risk and hazard groups calculated presented coincidences with at least one group involved in a wildlife strike. We suggest using the R index for hazard values and the BRI2 for risk values to obtain better and fastest results. Nevertheless, we encourage developing (a) a standardized survey method, (b) a standardized risk and hazard calculation method, and (c) a publicly available national report system for wildlife strikes.
引用
收藏
页数:9
相关论文
共 50 条
  • [31] Bridge safety assessment beyond deterministic methods: An Australian perspective
    Melhem, M. M.
    Caprani, C.
    Stewart, M. G.
    Ng, A.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, LIFE-CYCLE SUSTAINABILITY AND INNOVATIONS, 2021, : 551 - 559
  • [32] Safety in football - Risk avoidance and risk management: An attorney's perspective
    Granger, MS
    SAFETY IN AMERICAN FOOTBALL, 1997, 1305 : 184 - 188
  • [33] Assessment of multi-physics FE methods for bird strike modelling-application to a metallic riveted airframe
    Langrand, B
    Bayart, AS
    Chauveau, Y
    Deletombe, E
    INTERNATIONAL JOURNAL OF CRASHWORTHINESS, 2002, 7 (04) : 415 - 428
  • [34] Portfolio risk assessment: A tool for dam safety risk management
    Bowles, DS
    Anderson, LR
    Glover, TF
    Chauhan, SS
    MANAGING THE RISKS OF DAM PROJECT DEVELOPMENT, SAFETY AND OPERATION, 1998, : 317 - 334
  • [35] USE OF PROBABILISTIC METHODS FOR RISK ASSESSMENT AND FOR SAFETY STANDARD
    APOSTOLAKIS, GE
    OKRENT, D
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1977, 26 : 404 - 405
  • [36] Safety evaluation and risk assessment using immunotoxicology methods
    Dean, JH
    Hincks, J
    Luster, MI
    Gerberick, GF
    Neumann, DA
    Hastings, KL
    INTERNATIONAL JOURNAL OF TOXICOLOGY, 1998, 17 (03) : 277 - 296
  • [37] RISK ANALYSIS METHODS: THEIR IMPORTANCE FOR THE SAFETY ASSESSMENT OF RADIOTHERAPY
    Lopez, P. Ortiz
    Ramirez, M. L.
    Dumenigo, C.
    McDonnell, J. D.
    Vilaragut, J. J.
    Papadopulos, S.
    Pereira, R. P.
    Goncalves, M.
    Morales, J.
    Ferro, R.
    Lopez Morones, R.
    Delgado, J. M.
    Somoano, F.
    Alvarez, C.
    Guillen, A.
    Rodriguez, M.
    RADIOTHERAPY AND ONCOLOGY, 2008, 88 : S119 - S120
  • [38] PROJECT MANAGEMENT RISK ASSESSMENT - AN OVERVIEW OF THE METHODS
    Miszczynski, Piotr Marek
    AD ALTA-JOURNAL OF INTERDISCIPLINARY RESEARCH, 2015, 5 (01): : 63 - 66
  • [39] Qualitative Versus Quantitative Methods in Safety Risk Management
    Hewitt, John
    Pham, Joan
    2018 ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2018,
  • [40] Comparing Three Life Cycle Impact Assessment Methods from an Endpoint Perspective
    Weidema, Bo P.
    JOURNAL OF INDUSTRIAL ECOLOGY, 2015, 19 (01) : 20 - 26