Flexible job-shop scheduling method based on interval grey processing time

被引:6
作者
Xu, Wenxing [1 ]
Wu, Wentong [1 ]
Wang, Yao [1 ]
He, Yunliang [2 ]
Lei, Zhimei [3 ]
机构
[1] Beijing Inst Petrochem Technol, Coll Informat Engn, Beijing 102617, Peoples R China
[2] Beijing Inst Petrochem Technol, Coll Chem Engn, Beijing 102617, Peoples R China
[3] Kunming Univ Sci & Technol, Fac Management & Econ, Kunming 650500, Yunnan, Peoples R China
关键词
Flexible job shop scheduling problem; Uncertainty modeling; Initialization; DPSO algorithm; Interval grey processing time; ALGORITHM; MODEL;
D O I
10.1007/s10489-022-04213-9
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
With the complexity of industrial products, the processing time of products is affected by many factors, and it is difficult to give a concrete time estimate. Therefore, it is significant to study the flexible job shop scheduling problem (FJSP) with uncertain processing time. This paper defines the uncertain processing time as the interval grey processing time (IGPT). Also, an FJSP model with IGPT (G-FJSP) is formulated to minimize the interval grey maximum completion time, and the mathematical operation rules of IGPT are improved. Based on this, a step-size adaptive discrete particle swarm algorithm with load balancing (LS-DPSO) is put forward to solve the G-FJSP model. The experimental analysis on six classical test cases indicates that LS-DPSO outperforms four algorithms proposed in recent literature in terms of speed and solution quality. Taking IMK05 as an example, the minimum and the average values of LS-DPSO IGPT are 1.8% and 2.2% smaller than the optimal results of other four algorithms. Also, the resulting grey Gantt chart has better processing time flexibility to guide practical production.
引用
收藏
页码:14876 / 14891
页数:16
相关论文
共 41 条
[1]  
Aarts E. H., 1994, ORSA Journal on Computing, V6, P118, DOI 10.1287/ijoc.6.2.118
[2]  
Brandimarte P., 1993, Annals of Operations Research, V41, P157, DOI 10.1007/BF02023073
[3]   JOB-SHOP SCHEDULING WITH MULTIPURPOSE MACHINES [J].
BRUCKER, P ;
SCHLIE, R .
COMPUTING, 1990, 45 (04) :369-375
[4]  
Chen X., 2018, Study on seismic performance of RC shear wall structure reinforced with HRB600 high strength reinforcement
[5]   A study on flowshop scheduling problem combining Taguchi experimental design and genetic algorithm [J].
Cheng, Bor-Wen ;
Chang, Chun-Lang .
EXPERT SYSTEMS WITH APPLICATIONS, 2007, 32 (02) :415-421
[6]   Integrated planning and scheduling under production uncertainties: Bi-level model formulation and hybrid solution method [J].
Chu, Yunfei ;
You, Fengqi ;
Wassick, John M. ;
Agarwal, Anshul .
COMPUTERS & CHEMICAL ENGINEERING, 2015, 72 :255-272
[7]  
Cook S., 1971, STOC '71: Proceedings of the third annual ACM symposium on Theory of computing, P151, DOI [DOI 10.1145/800157.805047, 10.1145/800157.805047]
[8]   Investigation on process parameters of electrospinning system through orthogonal experimental design [J].
Cui, Wenguo ;
Li, Xiaohong ;
Zhou, Shaobing ;
Weng, Jie .
JOURNAL OF APPLIED POLYMER SCIENCE, 2007, 103 (05) :3105-3112
[9]   CONTROL-PROBLEMS OF GREY SYSTEMS [J].
DENG, JL .
SYSTEMS & CONTROL LETTERS, 1982, 1 (05) :288-294
[10]   Improved particle swarm optimization algorithm based novel encoding and decoding schemes for flexible job shop scheduling problem [J].
Ding, Haojie ;
Gu, Xingsheng .
COMPUTERS & OPERATIONS RESEARCH, 2020, 121