Construction Risk Assessment of Yellow River Bridges Based on Combined Empowerment Method and Two-Dimensional Cloud Model

被引:8
|
作者
Wang, Lei [1 ]
Jin, Ruibao [1 ]
Zhou, Jianpeng [2 ]
Li, Qingfu [2 ]
机构
[1] Henan Jiaotou Jiaozheng Expressway Co Ltd, Zhengzhou 450016, Peoples R China
[2] Zhengzhou Univ, Sch Water Conservancy & Transportat, Zhengzhou 450001, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 19期
关键词
Yellow River bridges; risk assessment; two-dimensional cloud model; cloudification AHP; cloud entropy weight method; game theory combination weighting method;
D O I
10.3390/app131910942
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
(1) In recent years, the economy of the Yellow River basin in China has developed rapidly, and a series of large bridges across the Yellow River have been built on both sides of the Yellow River, which has brought great convenience to regional socio-economic activities. However, risk events are prone to occur during the construction of bridges across the Yellow River, which affect the safety of the bridges' structure. Therefore, it is necessary to establish a new scientific risk assessment system for the construction safety of bridges across the Yellow River. (2) Methods: Firstly, based on the construction safety risk assessment index system of bridges across the Yellow River, the cloud AHP method and the cloud entropy weight method are used to determine the subjective weight and objective weight of risk indexes, and then the game theory combination weighting method is used to determine the comprehensive weight of each risk index, and then the digital characteristic values of the risk probability cloud and the consequence cloud are calculated and input into the forward cloud generator algorithm. MATLAB was used to generate a two-dimensional comprehensive cloud map, which was visually compared with the standard cloud map, and the probability level and consequence level of each risk index were preliminarily obtained. Finally, the risk assessment matrix was used for comprehensive risk evaluation. (3) Results: Applying the method to the construction safety risk assessment of the Jiaoping Expressway, the overall construction safety risk level of the Yellow River bridge was determined as level 4, and the risk levels of the four primary indicators were: personnel risk (level 3), material and equipment risk (level 4), construction technology risk (level 5), and construction environment risk (level 4). (4) Conclusions: The results of the risk evaluation are consistent with the actual construction state of the bridge, which shows that game theory's combination of empowerment with a two-dimensional cloud model is scientific and effective when applied to the construction safety risk evaluation of Yellow River bridges.
引用
收藏
页数:25
相关论文
共 50 条
  • [41] Risk Assessment Method for Cable System Construction of Long-Span Suspension Bridge Based on Cloud Model
    Lu, Zhifang
    Wei, Chaofan
    Liu, Muyu
    Deng, Xiaoguang
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [42] A Two-Dimensional Risk Assessment Method for Oil and Gas Pipelines Based on “Accident Probability–Reputation Loss”
    Xuefeng Chen
    Wentao Chen
    Yifu Zhang
    Bin Peng
    Yuling Wang
    Mingwei Xu
    Korean Journal of Chemical Engineering, 2024, 41 : 135 - 145
  • [43] LQG Benchmark Based Performance Assessment for ILC Based on Two-Dimensional Model
    Wei, Shaolong
    Wang, Yongqing
    2014 IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND AUTOMATION (ICIA), 2014, : 141 - 146
  • [44] Research on Risk Assessment Method of Subway Operation Based on Cloud Model
    Li Lei
    Wu Yanhua
    Guo Ge
    Shi Jizhong
    PROCEEDINGS OF THE 35TH CHINESE CONTROL CONFERENCE 2016, 2016, : 9567 - 9572
  • [45] Risk Assessment Method and Application of Embankment Engineering Based on Cloud Model
    Huang, Xianfeng
    Yang, Zitong
    Chen, Yingqin
    Fang, Guohua
    Yang, Hongwei
    JOURNAL OF COASTAL RESEARCH, 2019, : 310 - 319
  • [46] EXPLORATION OF EQUIPMENT RESEARCH PROJECT COST RISK ASSESSMENT AND MENTAL HEALTH INFLUENCES IN PROJECT DECISION-MAKING BASED ON TWO-DIMENSIONAL CLOUD MODEL
    Zhu, Chen
    Sun, Shengxiang
    Chen, Tong
    Zhong, Qianghui
    Liu, Haobang
    Li, Jing
    He, Dubo
    MEDICINE, 2024, 103 (37)
  • [47] A hybrid two-dimensional path planning model based on frothing construction algorithm and local fast marching method
    Yu, Chong
    Qiu, Qiwen
    Chen, Xiong
    COMPUTERS & ELECTRICAL ENGINEERING, 2013, 39 (02) : 475 - 487
  • [48] Safety Risk Assessment of Highway Bridge Construction Based on Cloud Entropy Power Method
    Li, Qingfu
    Zhou, Jianpeng
    Feng, Jinghe
    APPLIED SCIENCES-BASEL, 2022, 12 (17):
  • [49] A new approach for face hallucination based on a two-dimensional direct combined model
    Tu, Ching-Ting
    Ho, Mei-Chi
    Lin, Meng-Ying
    PATTERN RECOGNITION, 2017, 62 : 1 - 20
  • [50] Research on EU natural gas security and countermeasures based on two-dimensional cloud model
    Zeng, Fenyu
    Li, Jiamei
    ENERGY, 2024, 305