Construction Risk Assessment of Yellow River Bridges Based on Combined Empowerment Method and Two-Dimensional Cloud Model

被引:8
|
作者
Wang, Lei [1 ]
Jin, Ruibao [1 ]
Zhou, Jianpeng [2 ]
Li, Qingfu [2 ]
机构
[1] Henan Jiaotou Jiaozheng Expressway Co Ltd, Zhengzhou 450016, Peoples R China
[2] Zhengzhou Univ, Sch Water Conservancy & Transportat, Zhengzhou 450001, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 19期
关键词
Yellow River bridges; risk assessment; two-dimensional cloud model; cloudification AHP; cloud entropy weight method; game theory combination weighting method;
D O I
10.3390/app131910942
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
(1) In recent years, the economy of the Yellow River basin in China has developed rapidly, and a series of large bridges across the Yellow River have been built on both sides of the Yellow River, which has brought great convenience to regional socio-economic activities. However, risk events are prone to occur during the construction of bridges across the Yellow River, which affect the safety of the bridges' structure. Therefore, it is necessary to establish a new scientific risk assessment system for the construction safety of bridges across the Yellow River. (2) Methods: Firstly, based on the construction safety risk assessment index system of bridges across the Yellow River, the cloud AHP method and the cloud entropy weight method are used to determine the subjective weight and objective weight of risk indexes, and then the game theory combination weighting method is used to determine the comprehensive weight of each risk index, and then the digital characteristic values of the risk probability cloud and the consequence cloud are calculated and input into the forward cloud generator algorithm. MATLAB was used to generate a two-dimensional comprehensive cloud map, which was visually compared with the standard cloud map, and the probability level and consequence level of each risk index were preliminarily obtained. Finally, the risk assessment matrix was used for comprehensive risk evaluation. (3) Results: Applying the method to the construction safety risk assessment of the Jiaoping Expressway, the overall construction safety risk level of the Yellow River bridge was determined as level 4, and the risk levels of the four primary indicators were: personnel risk (level 3), material and equipment risk (level 4), construction technology risk (level 5), and construction environment risk (level 4). (4) Conclusions: The results of the risk evaluation are consistent with the actual construction state of the bridge, which shows that game theory's combination of empowerment with a two-dimensional cloud model is scientific and effective when applied to the construction safety risk evaluation of Yellow River bridges.
引用
收藏
页数:25
相关论文
共 50 条
  • [1] Risk Assessment Method of Deep Foundation Pit Construction Based on Two-Dimensional Cloud Model
    Huang, Zhen
    Cao, Chen
    Zhang, Wei
    Ma, Shao-Kun
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2024, 45 (10): : 1504 - 1512
  • [2] Risk assessment of box culverts construction under existing railway based on combined weighted two-dimensional cloud model
    Wang, Jingchun
    Dong, Yanyan
    Li, Qin
    Cheng, Yueli
    Journal of Railway Science and Engineering, 2020, 17 (02) : 516 - 523
  • [3] Construction risk probability assessment of shield tunneling projects in karst areas based on improved two-dimensional cloud model
    Sun, Huaiyuan
    Rui, Yi
    Lu, Yanyun
    Dai, Yiming
    Wang, Xiang
    Li, Xiaojun
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 154
  • [4] Dynamic risk early warning system for tunnel construction based on two-dimensional cloud model
    Sun, Huaiyuan
    Zhu, Mengqi
    Dai, Yiming
    Liu, Xiangsheng
    Li, Xiaojun
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 255
  • [5] Risk Assessment of Equipment Research Project Costs Based on FAHP-CRITIC Combined Weights for Two-Dimensional Cloud Model
    Zhu, Chen
    Sun, Shengxiang
    Chen, Tong
    Zhong, Qianghui
    Liu, Haobang
    Li, Jing
    He, Dubo
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2024, 2024
  • [6] Risk Assessment Based on Combined Weighting-Cloud Model of Tunnel Construction
    Wang, Jing-chun
    Liu, Jia-qi
    Wei, Qiang
    Wang, Peng
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2021, 28 (01): : 203 - 210
  • [7] Reliability Assessment of Highway Bridges Based on Combined Empowerment-TOPSIS Method
    Xu, Baosheng
    Qi, Ningning
    Zhou, Jianpeng
    Li, Qingfu
    SUSTAINABILITY, 2022, 14 (13)
  • [8] Study on risk assessment of tunnel construction across mined-out region based on combined weight-two-dimensional cloud model
    Liang, Haibin
    Xie, Xiong-gang
    Chen, Xuexi
    Li, Qingsong
    He, Wenjie
    Yang, Zhicheng
    Ren, Meirong
    SCIENTIFIC REPORTS, 2025, 15 (01):
  • [9] Two-dimensional sediment mathematical model for unsteady flow in the lower yellow river
    Zhang, Hongwu
    Li, Dongfeng
    Xu, Yuxin
    Zhang, Junhua
    International Journal of Sediment Research, 1999, 14 (02) : 295 - 301
  • [10] TWO-DIMENSIONAL SEDIMENT MATHEMATICAL MODEL FORUNSTEADY FLOW IN THE LOWER YELLOW RIVER
    ZHANG Hongwu
    LI Dongfeng
    XU Yuxin
    ZHANG Junhua (1 Project (No. 39890200) Supported by the National Nature Science Foundation Commission and the Ministry of Water Conservancy 2 Yellow River Institute of Hydraulic Research
    InternationalJournalofSedimentResearch, 1999, (02) : 295 - 301