Availability contracts under hierarchical maintenance

被引:2
作者
Patra, Pradipta [1 ]
Kumar, U. Dinesh [2 ]
机构
[1] Indian Inst Management Sirmaur, Paonta Sahib, Himachal Prades, India
[2] Indian Inst Management Bangalore, Bannerghatta Rd, Bangalore 560076, India
关键词
Maintenance; Replacement; Reliability; Optimization; Availability contract; Performance based contracting; PERFORMANCE-BASED CONTRACTS; INVENTORY SYSTEM; PARTS LOGISTICS; SPARE PARTS; RELIABILITY; POLICIES; DESIGN;
D O I
10.1007/s10479-023-05504-1
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Availability contracting is a prominent procurement strategy among many defense and other capital equipment suppliers and their customers. Under availability contracting, the revenue generated for a service provider is a function of equipment/system availability over the predetermined contract period. A major challenge in implementing availability contracting is predicting the availability of equipment, defining the target availability, and determining the best contract duration based on the target availability. In this paper, we extend the classical operational availability model for estimating equipment availability under hierarchical maintenance, which is frequently used for complex equipment such as aircraft. Under an availability contract, bounds have been proposed on system-level operational availability. The current study also develops optimization models for finding the optimal availability contract duration under different scenarios: stochastic and non-stochastic contract durations; contract written at parts level, system level; minimizing total maintenance costs with minimum level of target operational availability as a constraint etc. The study also shows that the optimal contract duration is a non-decreasing function of spares on hand, and the inherent availability of system part. The results from the study have been validated using numerical study with both simulated and real data.
引用
收藏
页码:389 / 423
页数:35
相关论文
共 50 条
  • [41] Reliability-based maintenance optimization under imperfect predictive maintenance
    Li Changyou
    Zhang Yimin
    Xu Minqiang
    CHINESE JOURNAL OF MECHANICAL ENGINEERING, 2012, 25 (01) : 160 - 165
  • [42] Maintenance Optimization for Repairable Deteriorating Systems under Imperfect Preventive Maintenance
    Lee, Juhyun
    Kim, Byunghoon
    Ahn, Suneung
    MATHEMATICS, 2019, 7 (08)
  • [43] Availability and maintenance strategy under time-varying environments for redundant repairable systems with PH distributions
    Li, Yan
    Zhang, Wei
    Liu, Baoliang
    Wang, Xiaofeng
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 246
  • [44] Optimal delivery due date for a supplier with an unreliable machine under outsourced maintenance
    Sharafali, Moosa
    Tarakci, Hakan
    Kulkarni, Shailesh
    Hameed, Raja Abdul Razack Shahul
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2019, 208 : 53 - 68
  • [45] Maintenance Technology Tools to Improve Plant Availability for Dairy Industry: Case Study
    Madanhire, Ignatio
    Mbohwa, Charles
    WORLD CONGRESS ON ENGINEERING, WCE 2015, VOL II, 2015, : 933 - 938
  • [46] A dynamic opportunistic maintenance model to maximize energy-based availability while reducing the life cycle cost of wind farms
    Erguido, A.
    Crespo Marquez, A.
    Castellano, E.
    Gomez Fernandez, J. F.
    RENEWABLE ENERGY, 2017, 114 : 843 - 856
  • [47] Optimizing the Spare Unit Ordering Strategies for Replacement Under Constrained Availability From a Mathematical Perspective
    Dong, Wenjie
    Du, Junliang
    Hua, Chenchen
    Liu, Sifeng
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2023, 53 (08): : 4799 - 4807
  • [48] A Two-dimensional Maintenance Service Contract Considering Availability and Maintenance Cost
    Sa'idah, Nur Faizatus
    Cakravastia, Andi
    Pasaribu, Udjianna Sekteria
    Iskandar, Bermawi Priyatna
    INTERNATIONAL JOURNAL OF TECHNOLOGY, 2023, 14 (02) : 363 - 373
  • [49] Maintenance optimization in failure-prone systems under imperfect preventive maintenance
    A. Khatab
    Journal of Intelligent Manufacturing, 2018, 29 : 707 - 717
  • [50] Optimization of the joint selective maintenance and repairperson assignment problem under imperfect maintenance
    Khatab, A.
    Diallo, C.
    Venkatadri, U.
    Liu, Z.
    Aghezzaf, E-H.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 413 - 422