Cost optimization in the construction of prefabricated buildings by using BIM and finite element simulation

被引:4
作者
Zou, YaFeng [1 ]
Feng, WenHui [1 ]
机构
[1] Henan Vocat Coll Econ & Trade, Coll Engn Econ, Zhengzhou 450000, Henan, Peoples R China
关键词
BIM technology; Wireless sensor; Prefabricated building; Cost optimization; MANAGEMENT; TECHNOLOGY; DESIGN; SYSTEM;
D O I
10.1007/s00500-023-08239-0
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper uses patterned structure to study the efficiency improvement of the practical application of BIM technology, and innovates the patterned structure method based on this. The research focus of this paper is to build a new assembly component library based on BIM model and algorithm optimization, improve its use and management efficiency, and use the core technology to design the simulation analysis model of BIM in construction, and give timely feedback of experimental information. Analyze the existing assembly structure design process, design standards and design methods, propose a BIM-based assembly structure design method, change the design idea from the whole to the component elements, and use the design method for prefabricated components. Taking the W prefabricated component library as a starting point, select the prefabricated components of the component library for assembly design to form a BIM model with a complete structure. Adjust and optimize the BIM model, and finally form a reasonable design plan. This BIM type of product includes production, transportation and assembly construction. Prefabricated buildings have obvious advantages, its comprehensive benefits are higher than other buildings, and the technical content is relatively high, through innovative prefabricated buildings, the modernization level of the building can be improved. Therefore, on the basis of in-depth investigation and study of the development status of China's construction industry, this paper studies the impact of different factors on engineering costs, including engineering schemes, engineering construction modes, etc., based on a large number of actual engineering operations and application cases, so as to achieve the purpose of reducing cost costs, improving project income, and improving project quality.
引用
收藏
页码:10107 / 10119
页数:13
相关论文
共 18 条
  • [1] Wireless Integrated Sensor Network: Boundary Intellect system for elephant detection via cognitive theory and Fuzzy Cognitive Maps
    Anni, Jerline Sheebha
    Sangaiah, Arun Kumar
    [J]. FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2018, 83 : 522 - 534
  • [2] Knowledge management perceptions in construction and design companies
    Forcada, Nuria
    Fuertes, Alba
    Gangolells, Marta
    Casals, Miquel
    Macarulla, Marcel
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 29 : 83 - 91
  • [3] Board independence and GRI-IFC performance standards: The mediating effect of the CSR committee
    Garcia-Sanchez, I. M.
    Gomez-Miranda, M. E.
    David, F.
    Rodriguez-Ariza, L.
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 225 : 554 - 562
  • [4] Cost-effective energy saving measures based on BIM technology: Case study at National Taiwan University
    Guo, Sy-Jye
    Wei, Taibing
    [J]. ENERGY AND BUILDINGS, 2016, 127 : 433 - 441
  • [5] The impact of natural gas price control in China: A computable general equilibrium approach
    He, Yongda
    Lin, Boqiang
    [J]. ENERGY POLICY, 2017, 107 : 524 - 531
  • [6] Towards Future BIM Technology Innovations: A Bibliometric Analysis of the Literature
    Khudhair, Ali
    Li, Haijiang
    Ren, Guoqian
    Liu, Song
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (03): : 1 - 21
  • [7] People consultation to construct the future: A Delphi application
    Landeta, Jon
    Barrutia, Jon
    [J]. INTERNATIONAL JOURNAL OF FORECASTING, 2011, 27 (01) : 134 - 151
  • [8] Investments in project management are profitable: A case study-based analysis of the relationship between the costs and benefits of project management
    Lappe, Mare
    Spang, Konrad
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (04) : 603 - 612
  • [9] Research on Construction Schedule Management Based on BIM Technology
    Li, Xue
    Xu, Jing
    Zhang, Qun
    [J]. 13TH GLOBAL CONGRESS ON MANUFACTURING AND MANAGEMENT, 2017, 174 : 657 - 667
  • [10] Makarova I, 2012, TRANSP PROBL, V7, P53