Integrating flexibility in open pit mine planning to survive commodity price decline

被引:1
作者
Madziwa, Lawrence [1 ]
Pillalamarry, Mallikarjun [1 ]
Chatterjee, Snehamoy [2 ]
机构
[1] Namibia Univ Sci & Technol, Dept Civil Min & Proc Engn, Windhoek, Namibia
[2] MichiganTech, Geol & Min Engn & Sci, Houghton, MI USA
关键词
MAXIMUM-FLOW; ECONOMIC-GROWTH; OPTIMIZATION; SUBSTITUTION; ALGORITHMS; SELECTION; CLOSURE; DESIGN; MARKET; RISK;
D O I
10.1016/j.resourpol.2023.103428
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Historically the mining industry grew substantially across the globe, acquiring new licenses, investing in exploration activities, and opening new mines along with the boom in commodity prices. However, the steady decline in mineral commodities prices significantly affects mineral industry as well as commodity producing nations. Mining risk management is undertaken to mitigate the adverse effects of uncertainties such as price fluctuations using Net Present Value (NPV). In this article risk management of commodity price decline was undertaken by integrating a recourse action with mine planning. The framework was presented in four distinct phases namely commodity price simulation using autoregressive distributed lag forecasting method; formulation of the mathematical stochastic phase design structure of the stochastic graph framework, and parametric solution of the graph problem; estimation and analysis of risk by Value at Risk (Var) and Weibull exceedance of losses concepts respectively, and minimizing the risk by optimizing operating level using the Lagrange model on Cobb-Douglass model. The proposed methodology was applied on an anonymous gold mine and the analysis of potential losses using Gumbel exceedance shows that mine could incur an annual loss of $20 million with a recurrence period of 1 in 1.38 years with a probability of 0.72. The recourse action was identified using the Lagrange model on the Cobb-Douglass model which reduced the cost by about 50% and subsequently the production level. The NPVs for the stochastic minimum cut models after application of the recourse action was 54% of the NPV at full production showing that there is an increase in the value of the project.
引用
收藏
页数:11
相关论文
共 23 条
  • [1] Integrating stochastic mine planning model with ARDL commodity price forecasting
    Madziwa, Lawrence
    Pillalamarry, Mallikarjun
    Chatterjee, Snehamoy
    RESOURCES POLICY, 2023, 85
  • [2] A dynamic stochastic programming approach for open-pit mine planning with geological and commodity price uncertainty
    Rimele, Adrien
    Dimitrakopoulos, Roussos
    Gamache, Michel
    RESOURCES POLICY, 2020, 65
  • [3] Long Term Planning In Open Pit Mines In Presence Of Commodity Price Uncertainty
    Rahmanpour, M.
    Osanloo, M.
    PROCEEDINGS OF THE 24TH INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY, IMCET 2015, 2015, : 660 - 667
  • [4] Integration of commodity price uncertainty in long-term open pit mine production planning by using an imperialist competitive algorithm
    Asl, M. Mokhtarian
    Sattarvand, J.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2018, 118 (02) : 165 - 172
  • [5] Incorporation of Geometallurgical Attributes and Geological Uncertainty into Long-Term Open-Pit Mine Planning
    Morales, Nelson
    Seguel, Sebastian
    Caceres, Alejandro
    Jelvez, Enrique
    Alarcon, Maximiliano
    MINERALS, 2019, 9 (02):
  • [6] Incorporation price uncertainty into open-pit to underground mine transition
    Dehghani, Hesam
    Sakinezhad, Reza
    Nabavi, Zohre
    Babanouri, Nima
    MINERAL ECONOMICS, 2024, 37 (01) : 89 - 99
  • [7] Concurrent open-pit mine production and in-pit crushing-conveying system planning
    Paricheh, Morteza
    Osanloo, Morteza
    ENGINEERING OPTIMIZATION, 2020, 52 (10) : 1780 - 1795
  • [8] AN APPOXIMATION TO THE OPEN PIT MINE PLANNING APPROACH BASED ON DECISIONS UNDER UNCERTAINTY
    Franco Sepulveda, Giovanni
    Branch Bedoya, John Willian
    Jaramillo Alvarez, Patricia
    BOLETIN DE CIENCIAS DE LA TIERRA, 2010, (28): : 7 - 13
  • [9] Research on production capacity planning method of open-pit coal mine
    Liu, Guangwei
    Guo, Weiqiang
    Chai, Senlin
    Li, Jiaming
    SCIENTIFIC REPORTS, 2023, 13 (01)
  • [10] Evaluating Geomechanical Uncertainty and Slope Reliability Analysis in Open Pit Mine Planning and Optimization
    Ricchio-Hitchcock, Evan
    Chatterjee, Snehamoy
    MINING METALLURGY & EXPLORATION, 2025, 42 (01) : 27 - 43