Failure mechanism of the deep-buried metro tunnel in mixed strata: Physical model test and numerical investigation

被引:7
|
作者
Qiu, Jutao [1 ]
Zhou, Xiaojun [1 ]
Shen, Yusheng [1 ,2 ]
Zhang, Xi [1 ]
Yu, Bingxin [1 ]
Luo, Yang [1 ]
机构
[1] Southwest Jiaotong Univ, Key Lab Transportat Tunnel Engn, Minist Educ, Chengdu 610031, Sichuan, Peoples R China
[2] Southwest Jiaotong Univ, Natl Engn Res Ctr Geol Disaster Prevent Technol La, Chengdu 610031, Sichuan, Peoples R China
关键词
Metro tunnel engineering; Failure mechanism; Mechanical response; Lining cracking; Physical model test; FACE STABILITY; DEFORMATION; EXCAVATION;
D O I
10.1016/j.tust.2023.105224
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Lining cracking is a typical damage phenomenon during the construction of metro tunnels, especially in the mixed strata with soft upper and lower hard rock, which severely affects the safety of the tunnel. In this paper, the physical model test was conducted to investigate the failure mechanism of metro tunnels. The full-face excavation apparatus was used to simulate tunnel excavation. The pressure cells, displacement transducers, strain gauges, and quartz sand marking method were adopted to monitor the mechanical response of the tunnel. Moreover, the failure evolution process of tunnel lining was recorded. The effectiveness of the model test was verified by numerical simulation. Meanwhile, the influences of the soil mechanical parameters, tunnel geometry, and lining stiffness on the failure behaviors of the tunnel were systematically discussed. The test results indicate that the tunnel excavation induced a slight deep soil disturbance. At buried depths ranging from 50 to 500 m, the soil settlement near the tunnel entrance was significant due to the uneven longitudinal compression, and the settlement decreased with increasing depth. The attenuation magnitude of the ground pressure in the vertical direction was greater than that in the horizontal direction. For the spring line, it was most affected by the coupling of axial compression and bending moment. The bearing capacity of the lining reached the limit when the buried depth was 150 m. The damage of the tunnel invert was the most severe, followed by the crown and the spring lines. In addition, the damage of the left part of the lining was more severe than that on the right part due to asymmetrical pressure. The entrance of the tunnel had little convergence, while the convergence at the end of the tunnel was the most significant.
引用
收藏
页数:18
相关论文
共 50 条
  • [31] Study on Mechanism of Segmental Lining-Bolt Combined Support for Deep-Buried Tunnel
    Ming-yang Ren
    Qiang-yong Zhang
    Zhen-jie Zhang
    Long-yun Zhang
    Qiang Gao
    Geotechnical and Geological Engineering, 2019, 37 : 3649 - 3671
  • [32] Excavation disturbance response of deep-buried tunnel with novel dynamic anisotropic mechanical model and failure degree index
    Zheng, Zhi
    Li, Ronghua
    Pan, Pengzhi
    Wang, Wei
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2025, 158
  • [33] Surrounding rock instability based on catastrophe model of deep-buried tunnel excavation
    Zhu, Yun-Hua
    Liu, Xin-Rong
    Huang, Ming
    Li, Xiao-Hong
    Shu, Zhi-Le
    Yantu Lixue/Rock and Soil Mechanics, 2009, 30 (03): : 805 - 809
  • [34] Research on rockburst mechanism and profile suitability of deep-buried tunnel in fold structure body
    Guo, Changbao
    Zhang, Yongshuang
    Jiang, Liangwen
    Sun, Dongsheng
    Xiong, Tanyu
    Du, Yuben
    Zheng, Guang
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2012, 31 (SUPPL.1): : 2758 - 2766
  • [35] Study on Mechanism of Segmental Lining-Bolt Combined Support for Deep-Buried Tunnel
    Ren, Ming-yang
    Zhang, Qiang-yong
    Zhang, Zhen-jie
    Zhang, Long-yun
    Gao, Qiang
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (05) : 3649 - 3671
  • [36] Deformation and failure mechanism of metro shield tunnel subjected to buried fault dislocation
    Li, Hanyuan
    Li, Xinggao
    Liu, Hao
    ENGINEERING FAILURE ANALYSIS, 2023, 153
  • [37] Numerical investigation on fracturing behaviors of deep-buried opening under dynamic disturbance
    Li, Xibing
    Weng, Lei
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 54 : 61 - 72
  • [38] Physical model experiment research on evolution process of water inrush hazard in a deep-buried tunnel containing the filling fault
    Xu, Xin
    Jing, Hongwen
    Zhao, Zhenlong
    Yin, Qian
    Li, Jian
    Li, Hong
    ENVIRONMENTAL EARTH SCIENCES, 2022, 81 (20)
  • [39] Physical model experiment research on evolution process of water inrush hazard in a deep-buried tunnel containing the filling fault
    Xin Xu
    Hongwen Jing
    Zhenlong Zhao
    Qian Yin
    Jian Li
    Hong Li
    Environmental Earth Sciences, 2022, 81
  • [40] The formation mechanism of dynamic water and mud inrush geohazard triggered by deep-buried tunnel crossing active fault: Insights from the geomechanical model test
    Kong, Fanmeng
    Xue, Yiguo
    Gong, Huimin
    Jiang, Xudong
    Song, Qian
    Fu, Yusong
    Fu, Kang
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 142