Research on Determining Resource Utilization Rates of Regional Construction and Demolition Waste from the Perspective of Collaborative Governance

被引:4
作者
Shen, Ling [1 ]
Zhang, Zhaokun [2 ]
Tang, Lingyi [3 ]
机构
[1] Sanjiang Univ, Sch Civil Engn, Dept Construct Management, Nanjing 210012, Jiangsu, Peoples R China
[2] Nanjing Tech Univ, Sch Civil Engn, Dept Smart Construct & Management, Nanjing 211816, Jiangsu, Peoples R China
[3] Southeast Univ, Sch Civil Engn, Dept Construct Management & Real Estate, Jiulonghu Campus, Nanjing 211189, Jiangsu, Peoples R China
关键词
Regional C&DW resource utilization; Utilization rate target; Dynamic regulation mechanism; Collaborative effects; SD-MOP coupled collaborative model; MANAGEMENT; MODEL;
D O I
10.1007/s12205-022-0465-y
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
How to achieve diversified and cooperative management of construction and demolition waste (C&DW) has always been a difficult problem for the government and the public. To achieve collaborative governance, it is necessary to coordinate the conflicting interests among multiple subjects and reasonably determine the collaborative goals. This study aims to illustrate the necessity and feasibility of collaborative governance, determine the phased resource utilization rate target from the perspective of balance of interests, and design a dynamic adjustment mechanism for local government's collaborative governance target, regional C&DW resource utilization rate and rewards and punishments from a quantitative perspective. From the perspective of maximizing social benefits and balancing the interests shared by three stakeholders: construction and demolition enterprises, waste resource treatment enterprises and the government, the system dynamics (SD) and multi-objective planning (MOP) coupling model (SD-MOP) are constructed. The MOP model is used to solve the optimal solution that satisfactory to all parties, and the SD model simulates the internal and external environmental changes of the C&DW management system under the optimal solution to provide dynamic parameters for the MOP model. This paper takes Jiangbei New Area in Nanjing, China as an example to verify the validity of the proposed SD-MOP model. The calculation results show that the three stakeholders with relevant interests can achieve a win-win situation by integrating resources and optimizing resource allocation, while promoting the goal of collaborative governance, that is, improving the utilization rate of C&DW resource utilization. In addition, the model also gives the specific time for the establishment and realization of the phased target of resource utilization in Nanjing Jiangbei New Area, with resource utilization rate targets of 75%, 79% and 84% in 2024, 2029 and 2036, respectively.
引用
收藏
页码:27 / 39
页数:13
相关论文
共 34 条
[1]   A sustainable medical waste collection and transportation model for pandemics [J].
Babaee Tirkolaee, Erfan ;
Aydin, Nadi Serhan .
WASTE MANAGEMENT & RESEARCH, 2021, 39 (1_SUPPL) :34-44
[2]   Large scale laboratory investigation in the improvement of subgrade characteristics of clay soil stabilized with construction demolition waste [J].
Bagriacik, Baki .
JOURNAL OF ENGINEERING RESEARCH, 2022, 10 (1B) :55-67
[3]   Utilization of alkali-activated construction demolition waste for sandy soil improvement with large-scale laboratory experiments [J].
Bagriacik, Baki .
CONSTRUCTION AND BUILDING MATERIALS, 2021, 302
[4]   Construction and demolition waste management in Saudi Arabia: Current practice and roadmap for sustainable management [J].
Blaisi, Nawaf I. .
JOURNAL OF CLEANER PRODUCTION, 2019, 221 :167-175
[5]  
Chen, 2021, ADHESION, V45, P171
[6]   Stabilisation of construction and demolition waste with a high fines content using alkali activated fly ash [J].
Cristelo, Nuno ;
Fernandez-Jimenez, Ana ;
Vieira, Castorina ;
Miranda, Tiago ;
Palomo, Angel .
CONSTRUCTION AND BUILDING MATERIALS, 2018, 170 :26-39
[7]   Effect of the particle size range of construction and demolition waste on the fresh and hardened-state properties of fly ash-based geopolymer mortars with total replacement of sand [J].
De Rossi, A. ;
Ribeiro, M. J. ;
Labrincha, J. A. ;
Novais, R. M. ;
Hotza, D. ;
Moreira, R. F. P. M. .
PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2019, 129 :130-137
[8]  
Desmyter J, 2010, C CENTRAL EUROPE SUS
[9]   Evolutionary game analysis of stakeholders' decision-making behaviours in construction and demolition waste management [J].
Du, Lei ;
Feng, Yingbin ;
Lu, Wei ;
Kong, Lingkai ;
Yang, Zhi .
ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2020, 84
[10]  
Gan, 2021, RES USING URBAN CONS