An integrative literature review on the causes of delays in construction projects: evidence from developing countries

被引:7
作者
Selcuk, Onur [1 ]
Turkoglu, Harun [1 ]
Polat, Gul [1 ]
Hajdu, Miklos [2 ]
机构
[1] Istanbul Tech Univ, Dept Civil Engn, Istanbul, Turkiye
[2] Budapest Univ Technol & Econ, Dept Construct Technol & Management, Budapest, Hungary
关键词
Causes of delays; construction; delays; developing countries; integrative review; time overrun; COST OVERRUNS; CAUSATIVE FACTORS; STAKEHOLDER; ESCALATION; INDUSTRY;
D O I
10.1080/15623599.2022.2135939
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Delays have commonly been a serious problem. This study aims to evaluate, criticize, and synthesize the literature on the causes of delays in construction. A total of 70 journal articles from 33 countries focussing on identifying the causes of delays were critically analysed. The main findings of this study are that the questionnaire survey is the most commonly used data collection method, the project phases at which the causes of delays are identified is not clearly stated in the majority of the reviewed articles, there is no agreement on the classification of causes of delays, the number of causes of delays studied by researchers greatly varies, the term 'delay' is not clearly defined in the majority of the articles, there is no standardized terminology for the causes of delays, key variables such as type of project, project delivery system and contract type are mostly ignored, and the location of the project is an important variable to consider when identifying the causes of delays. The findings of this study provide researchers, practitioners, and construction professionals with a detailed reference, which can assist them in better understanding the causes of delays, taking the necessary proactive actions, and improving the overall project performance.
引用
收藏
页码:610 / 622
页数:13
相关论文
共 86 条
[1]   Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran [J].
Abbasi, Omid ;
Noorzai, Esmatullah ;
Jafari, Kobra Gharouni ;
Golabchi, Mahmood .
JOURNAL OF ARCHITECTURAL ENGINEERING, 2020, 26 (03)
[2]   Aggregation of factors causing cost overruns and time delays in large public construction projects Trends and implications [J].
Adam, Abderisak ;
Josephson, Per-Erik Bertil ;
Lindahl, Goran .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (03) :393-406
[3]   The professionals' perspective on the causes of project delay in the construction industry [J].
Agyekum-Mensah, George ;
Knight, Andrew David .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (05) :828-841
[4]  
Aibinu A.A., 2002, INT J PROJ MANAG, V20, P593, DOI DOI 10.1016/S0263-7863(02)00028-5
[5]   Construction delays and their causative factors in Nigeria [J].
Aibinu, Ajibade Ayodeji ;
Odeyinka, Henry Agboola .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (07) :667-677
[6]   Importance and ranking evaluation of delay factors for development construction projects in Benin [J].
Akogbe, Romuald-Kokou T. M. ;
Feng, Xin ;
Zhou, Jing .
KSCE JOURNAL OF CIVIL ENGINEERING, 2013, 17 (06) :1213-1222
[7]   The desirability of Integrated Influential Factors (IIFs) Model of internal stakeholder as a panacea to project completion delay in Yemen [J].
Al-Fadhali, Najib ;
Zainal, Rozlin ;
Kasim, Narimah ;
Dodo, Mansir ;
Soon, Ng Kim ;
Hasaballah, Abdel Hafiz Ali .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (02) :128-136
[8]  
Al-Khalil MohammedI., 1999, Construction Management and Economics, V17, P647, DOI [10.1080/014461999371259, DOI 10.1080/014461999371259]
[9]   Causes of delays in Saudi Arabian public sector construction projects [J].
Al-Kharashi, Adel ;
Skitmore, Martin .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (01) :3-23
[10]  
Al-Momani A.H., 2000, INT J PROJ MANAG, V18, P51, DOI [10.1016/S0263-7863(98)00060-X, DOI 10.1016/S0263-7863(98)00060-X]