Coupling analysis method of grouting construction with deformation response of adjacent existing tunnel

被引:8
作者
Jiang, Ping-wei [1 ]
Zhang, Zhi-hong [1 ]
Zheng, Hong [1 ]
Huang, Jin-kun [2 ,3 ]
机构
[1] Beijing Univ Technol, Key Lab Urban Secur & Disaster Engn China, Minist Educ, Beijing 100124, Peoples R China
[2] China MCC17 Grp Co Ltd, Maanshan 243000, Anhui, Peoples R China
[3] Shanghai Jiao Tong Univ, Sch Naval Architecture Ocean & Civil Engn, Shanghai 200240, Peoples R China
基金
中国国家自然科学基金;
关键词
Grouting; Close-range underpass; Tunnel; Random medium theory; Euler-Bernoulli continuous beam; PREDICTION; SETTLEMENT; SLURRY;
D O I
10.1016/j.undsp.2023.07.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the new tunnel under close distance through the existing tunnel risk source, the grouting scheme developed to compensate for stratum losses is still based on empirical methods, relying on the overburden thickness of existing tunnels. This can potentially lead to an excessively high or low probability of uplift of existing tunnels. Proposing a coupled deformation analysis method between the grouting construction and adjacent existing tunnels is of great theoretical significance for developing grouting schemes. In order to reasonably limit the design parameters of grouting construction, based on the theory of fluid-solid coupling elastic pore-column expansion and the theory of random media, the calculation method of stratum displacement which simultaneously considers the coexistence of grout compaction expansion and permeability diffusion mode is derived, and the accuracy of the calculation method is verified by engineering examples. The accuracy of this calculation method was verified through engineering examples. Combined with the deformation coordination condition, the existing tunnel is regarded as an elastic Euler-Bernoulli continuous beam, and the finite element coupling balance equation of the interaction between the existing tunnel and the surrounding soil is obtained. Based on this, a coupling calculation model of the grouting construction and the deformation response of the adjacent existing tunnel is established. Combined with three times of grouting construction examples in the shield tunneling project of Beijing Metro Line 12 under the existing airport line, the reliability of the coupling calculation model to determine the grouting construction parameters is verified. The calculation parameters in the coupling calculation model have clear physical meanings, which can provide a theoretical basis for the grouting design of similar risk source projects.
引用
收藏
页码:312 / 330
页数:19
相关论文
共 30 条
  • [11] Big tunnels in bad rock
    Hoek, E
    [J]. JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2001, 127 (09) : 726 - 740
  • [12] Interpretation of Free-Field Ground Movements Caused by Mechanized Tunnel Construction
    Ieronymaki, Evangelia S.
    Whittle, Andrew J.
    Simic Sureda, Davor
    [J]. JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2017, 143 (04)
  • [13] Kizilbash MH, 2017, GEOTECH SP, P238
  • [14] Soil-pipe interaction due to tunnelling: comparison between Winkler and elastic continuum solutions
    Klar, A
    Vorster, TEB
    Soga, K
    Mair, RJ
    [J]. GEOTECHNIQUE, 2005, 55 (06): : 461 - 466
  • [15] SMT-GP method of prediction for ground subsidence due to tunneling
    Li, Wen-Xiu
    Li, Ji-Fei
    Wang, Qi
    Xia, Yin
    Ji, Zhan-Hua
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 32 : 198 - 211
  • [16] Deformation behaviors of existing tunnels caused by shield tunneling undercrossing with oblique angle
    Lin, Xing-Tao
    Chen, Ren-Peng
    Wu, Huai-Na
    Cheng, Hong-Zhan
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 89 : 78 - 90
  • [17] Liu B.C., 1993, COMPREHENSIVE ROCK E, P781
  • [18] Mair RJ, 1994, WORLD TUNNELLING NOV, V7, P361
  • [19] Lining Induced Stresses for Mechanized Tunneling Along Curved Alignment
    Marwan, Ahmed
    Alsahly, Abdullah
    Abd Elrehim, Mostafa Z.
    Meschke, Gunther
    [J]. ENGINEERING CHALLENGES FOR SUSTAINABLE UNDERGROUND USE, 2018, : 36 - 52
  • [20] The role of slurry TBM parameters on ground deformation: Field results and computational modelling
    Mooney, Michael A.
    Grasmick, Jacob
    Kenneally, Bernadette
    Fang, Yong
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 57 : 257 - 264