Coupling analysis method of grouting construction with deformation response of adjacent existing tunnel

被引:8
作者
Jiang, Ping-wei [1 ]
Zhang, Zhi-hong [1 ]
Zheng, Hong [1 ]
Huang, Jin-kun [2 ,3 ]
机构
[1] Beijing Univ Technol, Key Lab Urban Secur & Disaster Engn China, Minist Educ, Beijing 100124, Peoples R China
[2] China MCC17 Grp Co Ltd, Maanshan 243000, Anhui, Peoples R China
[3] Shanghai Jiao Tong Univ, Sch Naval Architecture Ocean & Civil Engn, Shanghai 200240, Peoples R China
基金
中国国家自然科学基金;
关键词
Grouting; Close-range underpass; Tunnel; Random medium theory; Euler-Bernoulli continuous beam; PREDICTION; SETTLEMENT; SLURRY;
D O I
10.1016/j.undsp.2023.07.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the new tunnel under close distance through the existing tunnel risk source, the grouting scheme developed to compensate for stratum losses is still based on empirical methods, relying on the overburden thickness of existing tunnels. This can potentially lead to an excessively high or low probability of uplift of existing tunnels. Proposing a coupled deformation analysis method between the grouting construction and adjacent existing tunnels is of great theoretical significance for developing grouting schemes. In order to reasonably limit the design parameters of grouting construction, based on the theory of fluid-solid coupling elastic pore-column expansion and the theory of random media, the calculation method of stratum displacement which simultaneously considers the coexistence of grout compaction expansion and permeability diffusion mode is derived, and the accuracy of the calculation method is verified by engineering examples. The accuracy of this calculation method was verified through engineering examples. Combined with the deformation coordination condition, the existing tunnel is regarded as an elastic Euler-Bernoulli continuous beam, and the finite element coupling balance equation of the interaction between the existing tunnel and the surrounding soil is obtained. Based on this, a coupling calculation model of the grouting construction and the deformation response of the adjacent existing tunnel is established. Combined with three times of grouting construction examples in the shield tunneling project of Beijing Metro Line 12 under the existing airport line, the reliability of the coupling calculation model to determine the grouting construction parameters is verified. The calculation parameters in the coupling calculation model have clear physical meanings, which can provide a theoretical basis for the grouting design of similar risk source projects.
引用
收藏
页码:312 / 330
页数:19
相关论文
共 30 条
  • [1] STOCHASTIC TRANSPORT-THEORY FOR POROUS-MEDIA
    AXELRAD, DR
    [J]. ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND PHYSIK, 1990, 41 (02): : 157 - 173
  • [2] Experimental determination of the longitudinal dispersivity during the injection of a micro-cement grout in a one-dimensional soil column
    Bouchelaghem, F
    Almosni, A
    [J]. TRANSPORT IN POROUS MEDIA, 2003, 52 (01) : 67 - 94
  • [3] Frost heave and thawing settlement of the ground after using a freeze-sealing pipe-roof method in the construction of the Gongbei Tunnel
    Cai, Haibing
    Hong, Rongbao
    Xu, Liuxun
    Wang, Changbai
    Rong, Chuanxin
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 125
  • [4] Improved analytical prediction of ground frost heave during tunnel construction using artificial ground freezing technique
    Cai, Haibing
    Liu, Zheng
    Li, Sheng
    Zheng, Tenglong
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 92
  • [5] Movements of ground and existing structures induced by slurry pressure-balance tunnel boring machine (SPB TBM) tunnelling in clay
    Cao, Liqiang
    Zhang, Dingli
    Fang, Qian
    Yu, Lin
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 97
  • [6] Cheong MT, 2006, GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, P369
  • [7] Model of compaction grouting
    El-Kelesh, AM
    Mossaad, ME
    Basha, IM
    [J]. JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2001, 127 (11) : 955 - 964
  • [8] A proposal for a secondary permeability index obtained from water pressure tests in dam foundations
    Foyo, A
    Sánchez, MA
    Tomillo, C
    [J]. ENGINEERING GEOLOGY, 2005, 77 (1-2) : 69 - 82
  • [9] Response of operating metro tunnels to compensation grouting of an underlying large-diameter shield tunnel: A case study in Hangzhou
    Gan, Xiaolu
    Yu, Jianlin
    Gong, Xiaonan
    Hou, Yongmao
    Liu, Nianwu
    Zhu, Min
    [J]. UNDERGROUND SPACE, 2022, 7 (02) : 219 - 232
  • [10] Prediction of ground surface displacement caused by grouting
    Guo Feng-qi
    Liu Xiao-tan
    Tong Wu-qi
    Shan Zhi
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2015, 22 (09) : 3564 - 3570