Robust virtual power plant investment planning

被引:5
作者
Baringo, Ana [1 ]
Baringo, Luis [2 ]
Arroyo, Jose M. [2 ]
机构
[1] Univ Pontificia Comillas, Inst Res Technol, ICAI, Alberto Aguilera 23, Madrid 28015, Spain
[2] Univ Castilla La Mancha, Dept Elect Engn, Campus Univ S-N, E-13071 Ciudad Real, Spain
关键词
Adjustable robust optimization; Energy electricity market; Investment planning; Nested column-and-constraint generation; algorithm; Nonconvex operation; Uncertainty; Virtual power plant; OPERATION; ENERGY; MODEL; NETWORK; STORAGE;
D O I
10.1016/j.segan.2023.101105
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper proposes a novel approach based on adjustable robust optimization for the investment planning of a virtual power plant that participates in the energy electricity market. The virtual power plant behaves in this market as a price-taking agent that faces exogenous prices. The virtual power plant comprises conventional, renewable, and storage units, as well as flexible demands. Investment decisions on conventional, renewable, and storage units are made under the uncertainty related to future production costs of the conventional generating units, future consumption levels of the flexible demands, and future energy market prices. As a major modeling contribution, the nonconvex operation of both conventional generating units and storage devices is precisely accounted for, thus yielding a trilevel program with lower-level binary variables. The resulting model is solved using an exact nested column-and-constraint generation algorithm, which constitutes the methodological contribution. Results from several case studies are provided to show the effective performance of the proposed approach.
引用
收藏
页数:12
相关论文
共 28 条
  • [1] Adaptive Robust Expansion Planning for a Distribution Network With DERs
    Amjady, Nima
    Attarha, Ahmad
    Dehghan, Shahab
    Conejo, Antonio J.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (02) : 1698 - 1715
  • [2] [Anonymous], 2014, Integrating renewables in electricity markets: operational problems
  • [3] On the Use of a Convex Model for Bulk Storage in MIP-Based Power System Operation and Planning
    Arroyo, Jose M.
    Baringo, Luis
    Baringo, Ana
    Bolanos, Ricardo
    Alguacil, Natalia
    Cobos, Noemi G.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2020, 35 (06) : 4964 - 4967
  • [4] Bagchi A, 2019, 2019 IEEE MILAN POWERTECH
  • [5] Adequacy Assessment of Generating Systems Incorporating Storage Integrated Virtual Power Plants
    Bagchi, Arijit
    Goel, Lalit
    Wang, Peng
    [J]. IEEE TRANSACTIONS ON SMART GRID, 2019, 10 (03) : 3440 - 3451
  • [6] Baringo A., 2023, ROBUST VIRTUAL POWER
  • [7] Holistic planning of a virtual power plant with a nonconvex operational model: A risk-constrained stochastic approach
    Baringo, Ana
    Baringo, Luis
    Arroyo, Jose M.
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2021, 132
  • [8] Adjustable robust solutions of uncertain linear programs
    Ben-Tal, A
    Goryashko, A
    Guslitzer, E
    Nemirovski, A
    [J]. MATHEMATICAL PROGRAMMING, 2004, 99 (02) : 351 - 376
  • [9] The price of robustness
    Bertsimas, D
    Sim, M
    [J]. OPERATIONS RESEARCH, 2004, 52 (01) : 35 - 53
  • [10] Robust Energy and Reserve Scheduling Under Wind Uncertainty Considering Fast-Acting Generators
    Cobos, Noemi G.
    Arroyo, Jose M.
    Alguacil, Natalia
    Street, Alexandre
    [J]. IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2019, 10 (04) : 2142 - 2151