Factors affecting BIM implementation in Saudi Arabia: a critical analysis

被引:12
作者
Al-Mohammad, Mohammad S. [1 ]
Haron, Ahmad Tarmizi [1 ]
Rahman, Rahimi A. [1 ,2 ]
Alhammadi, Yasir [3 ]
机构
[1] Univ Malaysia Pahang, Fac Civil Engn Technol, Kuantan, Malaysia
[2] Daffodil Int Univ, Gen Educ Dept, Dhaka, Bangladesh
[3] Prince Sattam bin Abdulaziz Univ, Coll Engn, Al Kharj, Saudi Arabia
关键词
Automation; Building information modeling; Inferential statistics; Multivariate analysis; Saudi Arabia; INFORMATION MODELING BIM; CRITICAL SUCCESS FACTORS; CONSTRUCTION-INDUSTRY; ADOPTION; BARRIERS; PROJECTS; OPTIMIZATION; CAPABILITIES; STRATEGIES; SUPPORT;
D O I
10.1108/IJBPA-09-2021-0122
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose - This study examines the underlying relationships between the critical factors of building information modeling (BIM) implementation and the factors' groupings among architecture, engineering and construction (AEC) organizations in Saudi Arabia. The objectives of the study are to (1) identify the critical factors for BIM implementation, (2) analyze the interrelationships between the critical factors and (3) compare the critical factors between the different organizational characteristics. Design/methodology/approach - First, potential factors were identified through a systematic literature review and interviews with AEC professionals. Then, a questionnaire survey was sent to AEC professionals and the collected data were analyzed using the following techniques and tests: mean score ranking, standard deviation, normalized value, factor analysis (FA), analysis of variance (ANOVA) and post-hoc Tukey test. Findings - The analyses show that 14 factors are critical for BIM implementation in Saudi Arabia. The top critical factors include the existence of standard contracts on data security and user confidentiality, consistent views on BIM among stakeholders and the availability of guidelines for implementing BIM. Of the 14 critical factors, 9 can be grouped into 4 underlying factors: environmental, governmental, legal and organizational. The analysis shows that the criticality of the most critical factors grouped by the FA varies between different levels of BIM competency. Finally, the presence of public-private partnerships (PPPs) in realizing BIM projects is a new and emerging critical factor for BIM implementation in Saudi Arabia. Originality/value - This study differs from prior works on BIM implementation in Saudi Arabia by using FA to explore the underlying relationships among factors of BIM implementation and the factors' groupings. Based on the FA results, a roadmap for implementing the BIM was developed. These findings will help to purposefully and efficiently customize BIM implementation strategies and initiatives to ensure successful BIM implementation in Saudi Arabia.
引用
收藏
页数:26
相关论文
共 99 条
[1]   Building Information Modelling (BIM) adoption and implementation enablers in AEC firms: a systematic literature review [J].
Abbasnejad, Behzad ;
Nepal, Madhav Prasad ;
Ahankoob, Alireza ;
Nasirian, Araz ;
Drogemuller, Robin .
ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2021, 17 (5-6) :411-433
[2]   A unified BIM adoption taxonomy: Conceptual development, empirical validation and application [J].
Ahmed, Ahmed Louay ;
Kassem, Mohamad .
AUTOMATION IN CONSTRUCTION, 2018, 96 :103-127
[3]  
Ahmed S., 2020, 2020 IEEE 8 R10 HUMA, P1, DOI [10.1109/R10-HTC49770.2020.9357016, DOI 10.1109/R10-HTC49770.2020.9357016]
[4]   BIM-based techno-economic assessment of energy retrofitting residential buildings in hot humid climate [J].
Ahmed, Wahhaj ;
Asif, Muhammad .
ENERGY AND BUILDINGS, 2020, 227
[5]   Status of BIM Adoption and the BIM Experience of Cost Consultants in Australia [J].
Aibinu, Ajibade ;
Venkatesh, Sudha .
JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 2014, 140 (03)
[6]  
Al-Hammadi M.A., 2020, Open Constr. Build. Technol. J, V14, P98, DOI [10.2174/1874836802014010098, DOI 10.2174/1874836802014010098]
[7]   Factors affecting BIM implementation: evidence from countries with different income levels [J].
Al-Mohammad, Mohammad S. ;
Haron, Ahmad Tarmizi ;
Esa, Muneera ;
Aloko, Mohammad Numan ;
Alhammadi, Yasir ;
Anandh, K. S. ;
Rahman, Rahimi A. .
CONSTRUCTION INNOVATION-ENGLAND, 2023, 23 (03) :683-710
[8]   Factors affecting BIM implementation in post-conflict low-income economies: the case of Afghanistan [J].
Al-Mohammad, Mohammad S. ;
Haron, Ahmad Tarmizi ;
Aloko, Mohammad Numan ;
Rahman, Rahimi A. .
JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2023, 21 (01) :299-318
[9]  
Al-Suhaili I., 2015, J ENV SCI ENG, P451, DOI [DOI 10.17265/2162-5263/2015.08, 10.17265/2162-5263/2015.08.006, DOI 10.17265/2162-5263/2015.08.006]
[10]   BIM in the Saudi Arabian construction industry: state of the art, benefit and barriers [J].
Al-Yami, Abdullah ;
Sanni-Anibire, Muizz O. .
INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2021, 39 (01) :33-47