Moderating Effect of Project Type on the Relationship between Project Delivery Systems and Cost Performance

被引:4
|
作者
Moon, Hyosoo [1 ]
Park, Moonseo [1 ]
Ahn, Yonghan [2 ]
Kwon, Nahyun [1 ]
机构
[1] Hanyang Univ Erica, Dept Architecture & Architectural Engn, Ansan 15588, South Korea
[2] Hanyang Univ Erica, Dept Smartcity Engn, Ansan 15588, South Korea
基金
新加坡国家研究基金会;
关键词
Project delivery system (PDS); Design-build (DB); Design-bid-build (DBB); Moderation analysis; Project type; Cost performance; DESIGN-BUILD; UNCERTAINTY; MANAGEMENT; CONTRACTS; MEDIATORS; MODEL;
D O I
10.1061/(ASCE)ME.1943-5479.0001097
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study examines the moderating role of project type between project delivery system (PDS) and cost performance to decide whether project types should be addressed prior to evaluating PDS performance. Previous studies evaluating PDSs performance using direct relationship analysis present controversial assessments in terms of cost-efficiency. They recognize that project type causes inconsistencies when comparing design-build (DB) and design-bid-build (DBB) systems. However, they have yet to determine the specific role of the project type, leading to ambiguity regarding how to control the project type (e.g., a dataset using unspecified or mixed project types). This study employed a moderation analysis to identify the role of project type and to compare the cost performance of DB and DBB systems associated with project types as a post hoc test, leveraging statistical methodology, based on 90 public building projects in Seoul, South Korea. The results show that the moderating effect of project type is statistically significant. The cost growth in DB for nonresidential building projects presents statistically lower than that in DBB, whereas the cost growth difference between DB and DBB for residential buildings is not statistically significant. Additional analysis of full life-cycle cost performance shows another dimension of comparison that indicates the cost performance comparison of DB and DBB projects is controversial and more likely to be influenced by other factors. This study contributes to the engineering in the management body of knowledge by distinguishing the effects of project type and PDS on cost performance using a causal relationship analysis. The findings provide objective criteria for public-sector practitioners in the Architecture, Engineering, and Construction industry on how to address project types when they evaluate and select PDS and enhance the consistency of PDS evaluation in terms of cost performance.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Relationship between the interactive use of control systems and the project performance: The moderating effect of uncertainty and equivocality
    Sakka, Ouafa
    Barki, Henri
    Cote, Louise
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (03) : 508 - 522
  • [2] Influence of project conflict on cost performance in different project delivery systems
    College of Management and Economics, Tianjin University, Tianjin
    300072, China
    Tongji Daxue Xuebao, 10 (1626-1632):
  • [3] The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance
    Zailani, Suhaiza
    Ariffin, Hazrina Aziz Md.
    Iranmanesh, Mohammad
    Moeinzadeh, Soroush
    Iranmanesh, Masoomeh
    JOURNAL OF SCIENCE AND TECHNOLOGY POLICY MANAGEMENT, 2016, 7 (03) : 346 - 368
  • [4] Quantitative Comparison of Project Performance between Project Delivery Systems
    Ibrahim, Michael W.
    Hanna, Awad
    Kievet, Dave
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (06)
  • [5] Moderating Effect of Senior Management Support on the Relationship Between Schedule Delay Factors and Project Performance
    Ahmed, Riaz
    Hussain, Abrar
    Philbin, Simon P.
    ENGINEERING MANAGEMENT JOURNAL, 2022, 34 (03) : 374 - 393
  • [6] Comparative Analysis between Project Delivery Systems through Quantitative Assessment of Project Performance
    Ibrahim, Michael
    Hanna, Awad
    Kievet, Dave
    CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 670 - 680
  • [7] The moderating effect of human resource management practices on the relationship between knowledge absorptive capacity and project performance in project-oriented companies
    Popaitoon, Sujinda
    Siengthai, Sununta
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (06) : 908 - 920
  • [8] Leadership Style And Project Teamwork In Project Management Performance: Moderating Effect Of Project Knowledge
    Humaidi, Norshima
    Said, Noor Azzah
    PROCEEDING OF KNOWLEDGE MANAGEMENT INTERNATIONAL CONFERENCE (KMICE) 2014, VOLS 1 AND 2, 2014, : 5 - 10
  • [9] Investigating the Relationship between IS Project Risk and Project Performance
    Wu, Chun-Hui
    Wang, Shiow-Luan
    Fang, Kwoting
    THIRD 2008 INTERNATIONAL CONFERENCE ON CONVERGENCE AND HYBRID INFORMATION TECHNOLOGY, VOL 2, PROCEEDINGS, 2008, : 100 - +
  • [10] Relationship between project performance and accidents
    Rodriguez, YA
    Jaselskis, EJ
    Russell, JS
    IMPLEMENTATION OF SAFETY AND HEALTH ON CONSTRUCTION SITES, 1996, : 251 - 257