A stochastic bi-objective project scheduling model under failure of activities

被引:2
|
作者
Rezaei, Fatemeh [1 ,2 ]
Najafi, Amir Abbas [2 ]
Demeulemeester, Erik [1 ]
Ramezanian, Reza [2 ]
机构
[1] Katholieke Univ Leuven, Fac Econ & Business, Res Ctr Operat Management, Dept Decis Sci & Informat Management, B-3000 Leuven, Belgium
[2] KN Toosi Univ Technol, Fac Ind Engn, Tehran, Iran
关键词
R&D project scheduling; Activity failure; Conditional value-at-risk; NET PRESENT VALUE; VALUE-AT-RISK; ACTIVITY DURATION; ALGORITHM; MAXIMIZE;
D O I
10.1007/s10479-023-05600-2
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, the research and development project scheduling problem (RDPSP) under uncertain failure of activities is formulated where an activity's failure results in the project's overall failure. A scenario-based bi-objective model to maximize the expected net present value (eNPV) and to minimize the NPV's risk by conditional value-at-risk (CVaR) measurement is presented. For this purpose, different modes of failure or success of activities have been considered as a stochastic parameter by a set of scenarios. To formulate the problem, a nonlinear model is first presented, then a mixed-integer programming (MIP) model of the problem is developed by piecewise approximation. Some valid inequalities are presented to improve the performance of the MIP model. A sequential sampling procedure is also used to approximate the solution of the MIP model with a large number of scenarios. The experimental results have shown that the sequential sampling procedure attains high-quality solutions in a reasonable CPU time.
引用
收藏
页码:453 / 476
页数:24
相关论文
共 50 条
  • [31] Bi-objective perishable product delivery routing problem with stochastic demand
    Wang, Qi
    Li, Hui
    Wang, Dujuan
    Cheng, T. C. E.
    Yin, Yunqiang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 175
  • [32] A bi-objective model for the retail spatial design problem
    Yapicioglu, Haluk
    Smith, Alice E.
    ENGINEERING OPTIMIZATION, 2012, 44 (03) : 243 - 266
  • [33] A Bi-Objective Model for Multi-Mode Resource Constrained Scheduling Problem to Optimize the Net Present Value of Costs and Makespan
    Bagherinejad, Jafar
    Zare, Farideh
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2019, 18 (03): : 340 - 348
  • [34] Bi-objective optimization of a multi-mode, multi-site resource-constrained project scheduling problem
    Hessami, Shiba
    Davari-Ardakani, Hamed
    Javid, Youness
    Ameli, Mariam
    JOURNAL OF MODELLING IN MANAGEMENT, 2024, 19 (04) : 1136 - 1154
  • [35] SOLVING BI-OBJECTIVE TRANSPORTATION PROBLEM UNDER NEUTROSOPHIC ENVIRONMENT
    Sandhiya, S.
    Dhanapal, Anuradha
    JOURNAL OF APPLIED MATHEMATICS & INFORMATICS, 2024, 42 (04): : 831 - 854
  • [36] A Multi-objective DCP Model for Bi-Level Resource-Constrained Project Scheduling Problems in Grounding Grid System Project under Hybrid Uncertainty
    Zhang, Zhe
    Liu, Ming
    Zhou, Xiaoyang
    Chen, Lu
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (05) : 1631 - 1641
  • [37] A Bi-objective green tugboat scheduling problem with the tidal port time windows
    Zhong, Huiling
    Zhang, Yugang
    Gu, Yimiao
    TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2022, 110
  • [38] Bi-objective scheduling with cooperating heuristics for embedded real-time systems
    Bendib, Sonia Sabrina
    Kalla, Hamoudi
    Kalla, Salim
    INTERNATIONAL JOURNAL OF EMBEDDED SYSTEMS, 2020, 12 (02) : 234 - 242
  • [39] Bi-objective multi-resource scheduling problem for emergency relief operations
    Bodaghi, Behrooz
    Palaneeswaran, Ekambaram
    Abbasi, Babak
    PRODUCTION PLANNING & CONTROL, 2018, 29 (14) : 1191 - 1206
  • [40] A NEW BI-OBJECTIVE MODEL FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS AND FOUR PAYMENT MODELS
    Seifi, M.
    Tavakkoli-Moghaddam, R.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2008, 21 (04): : 347 - 360