Simulation studies on optimizing oil productivity in oil rim reservoirs under gas cap blow down production strategy

被引:2
|
作者
Olabode, Oluwasanmi [1 ]
Adewunmi, Pelumi [1 ]
Uzodinma, Odera [1 ]
Famurewa, Gideon [1 ]
Ogba, Princess [1 ]
Amah, Chukwuemeka [1 ]
机构
[1] Covenant Univ, Dept Petr Engn, Ota, Ogun, Nigeria
关键词
Oil rim; Gas cap blow down; Water and gas injection; Oil recovery factor;
D O I
10.1016/j.petlm.2022.08.001
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Gas cap blow down strategy is normally deployed for Ultra-thin oil rim reservoirs with huge gas caps due to extremely high gas oil ratios from wells in such reservoirs. The current state leads to loss of production from the oil reserves due to high initial reservoir pressure thus, reducing its net present value. Data on important factors essential to the productivity of oil rim reservoirs are used to build a heterogeneous ultra-thin reservoir with a time step of 10,000 days using the Eclipse software and its embedded correlations. The reservoir is subjected to a gas cap blowdown via a gas well, then an oil well is initiated into the model at onset and after time periods of 2000 days, 4000 days, 6000 days and 8000 days to estimate the oil recovery. It is expected that due to the large nature of the gas cap, pressure decline will be drastic and leading to a low oil recovery, hence the injection of water and gas at different rates at the periods indicated. The results indicate an oil recovery of 4.3% during gas cap blow down and 10.34% at 6000 days. Peak oil recoveries of 12.64% and 10.80% are estimated under 30,000 Mscf/day at 4000 days and 1000 stb/day at 6000 days respectively. This shows an incremental oil recovery of 8.34% and 6.5% over that recorded during gas cap blow down. The results also indicate that the gas production at those periods was not greatly affected with an estimated increment of 257 Bscf recorded during 30,000 Mscf/day at 4000 days. All secondary injection schemes at the respective time steps had positive impact on the overall oil recoveries. It is recommended that extra production and injection wells be drilled, enhanced oil recovery options and injection patterns be considered to further increase oil recovery. (c) 2022 Southwest Petroleum University. Publishing services by Elsevier B.V. on behalf of KeAi Communications Co. Ltd. This is an open access article under the CC BY-NC-ND license (http:// creativecommons.org/licenses/by-nc-nd/4.0/).
引用
收藏
页码:373 / 389
页数:17
相关论文
共 23 条
  • [1] Simulation studies on optimizing oil productivity in oil rim reservoirs under gas cap blow down production strategy
    Oluwasanmi Olabode
    Pelumi Adewunmi
    Odera Uzodinma
    Gideon Famurewa
    Princess Ogba
    Chukwuemeka Amah
    Petroleum, 2023, 9 (03) : 373 - 389
  • [2] Dataset on modelling a synthetic oil rim reservoirs for optimizing oil production during gas cap blow down strategy
    Olabode, Oluwasanmi
    Nnorom, ChukwuEbuka
    Ajagunna, Samuel
    Awelewa, Kehinde
    Umunna, Precious
    Uzodinma, Odera
    DATA IN BRIEF, 2022, 45
  • [3] Optimizing productivity in oil rims: simulation studies on horizontal well placement under simultaneous oil and gas production
    Olabode, Oluwasanmi
    Isehunwa, Sunday
    Orodu, Oyinkepreye
    Ake, Daniel
    JOURNAL OF PETROLEUM EXPLORATION AND PRODUCTION TECHNOLOGY, 2021, 11 (01) : 385 - 397
  • [4] Optimizing productivity in oil rims: simulation studies on horizontal well placement under simultaneous oil and gas production
    Oluwasanmi Olabode
    Sunday Isehunwa
    Oyinkepreye Orodu
    Daniel Ake
    Journal of Petroleum Exploration and Production, 2021, 11 : 385 - 397
  • [5] Water influx calculation of oil-rim reservoir with condensate gas cap under concurrent development of gas cap and oil rim
    Zhang, Angang
    Fan, Zifei
    Song, Heng
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2015, 46 (08): : 3040 - 3046
  • [6] WATER DRIVE OF OIL UNDER THE GAS-CAP OF OIL-AND-GAS RESERVOIRS
    KURBANOV, AK
    UDUMOV, RK
    NEFTYANOE KHOZYAISTVO, 1987, (08): : 29 - 32
  • [7] Optimizing productivity in oil rims: simulation studies on water and gas injection patterns
    Oluwasanmi O.
    Pastor A.-N.
    Charles O.
    Christopher N.
    Seyi O.
    Arabian Journal of Geosciences, 2021, 14 (7)
  • [8] Model-based feedback control of oil production in oil-rim reservoirs under gas coning conditions
    Siddhamshetty, Prashanth
    Kwon, Joseph Sang-Il
    COMPUTERS & CHEMICAL ENGINEERING, 2018, 112 : 112 - 120
  • [9] Model-based feedback control of oil production in oil-rim reservoirs under gas coning conditions
    Siddhamshetty, Prashanth
    Sang-Il Kwon, Joseph
    2018 ANNUAL AMERICAN CONTROL CONFERENCE (ACC), 2018, : 2605 - 2610
  • [10] Fluid interface moving for the concurrent production of gas cap and oil ring of gas cap reservoirs
    Fan Zifei
    Cheng Linsong
    Song Heng
    Wu Xuelin
    Zhang An'gang
    PETROLEUM EXPLORATION AND DEVELOPMENT, 2015, 42 (05) : 683 - 690