共 20 条
- [1] Dridi N., 2014, J MATH MODELL ALGORI, V13, P233, DOI DOI 10.1007/S10852-013-9235-7
- [4] Hadda H, 2007, P 3 MULT INT C SCHED, P184
- [8] Optimal scheduling of the 3-machine assembly-type flow shop [J]. RAIRO-RECHERCHE OPERATIONNELLE-OPERATIONS RESEARCH, 1999, 33 (04): : 439 - 445
- [10] Johnson S. M., 1954, NAV RES LOG, V1, P61, DOI [10.1002/nav.3800010110, DOI 10.1002/NAV.3800010110]