On the two-stage assembly flow shop problem

被引:0
作者
Hadda, Hatem [1 ]
Dridi, Najoua [1 ]
Hajri-Gabouj, Sonia [2 ]
机构
[1] Univ Tunis El Manar, Ecole Natl Ingenieurs Tunis, BP 37 Le Belvedere, Tunis 1002, Tunisia
[2] Ctr Urbain Nord, INSAT, LISI, BP N676, Tunis 1080, Tunisia
关键词
Assembly flow shop; Branch and bound; Heuristic; Dominance rule; Lower bound; SCHEDULING PROBLEM; HEURISTICS; 3-MACHINE; ALGORITHM; MAKESPAN; MACHINE; SETUP;
D O I
10.1007/s11750-024-00664-0
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Numerous operational constraints within both industry and service sectors mandate the concurrent scheduling of tasks. This need is particularly evident in the assembly of products within manufacturing processes. This paper concentrates on minimizing makespan in the two-stage assembly flow shop problem. Our contributions include the introduction of novel dominance rules, a proposal for a heuristic method, and the development of a branch and bound algorithm. Additionally, we conduct an empirical analysis of makespan distribution for small-size instances. Through extensive experimentation, our study demonstrates the efficiency of the introduced dominance rules and the strong performance of the developed branch and bound algorithm.
引用
收藏
页码:224 / 244
页数:21
相关论文
共 20 条
  • [1] Dridi N., 2014, J MATH MODELL ALGORI, V13, P233, DOI DOI 10.1007/S10852-013-9235-7
  • [2] HEURISTIC METHOD FOR HYBRID FLOW SHOP ISSUES WITH DEDICATED MACHINES
    Dridi, Najoua
    Hadda, Hatem
    Hajri-Gabouj, Sonia
    [J]. RAIRO-OPERATIONS RESEARCH, 2009, 43 (04) : 421 - 436
  • [3] Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures
    Framinan, Jose M.
    Perez-Gonzalez, Paz
    Fernandez-Viagas, Victor
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 273 (02) : 401 - 417
  • [4] Hadda H, 2007, P 3 MULT INT C SCHED, P184
  • [5] On the optimality conditions of the two-machine flow shop problem
    Hadda, Hatem
    Dridi, Najoua
    Hajji, Mohamed Karim
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 266 (02) : 426 - 435
  • [6] ON THE TWO-STAGE HYBRID FLOW SHOP WITH DEDICATED MACHINES
    Hadda, Hatem
    Hajji, Mohamed Karim
    Dridi, Najoua
    [J]. RAIRO-OPERATIONS RESEARCH, 2015, 49 (04) : 795 - 804
  • [7] Exact resolution of the two-stage hybrid flow shop with dedicated machines
    Hadda, Hatem
    Dridi, Najoua
    Hajri-Gabouj, Sonia
    [J]. OPTIMIZATION LETTERS, 2014, 8 (08) : 2329 - 2339
  • [8] Optimal scheduling of the 3-machine assembly-type flow shop
    Haouari, M
    Daouas, T
    [J]. RAIRO-RECHERCHE OPERATIONNELLE-OPERATIONS RESEARCH, 1999, 33 (04): : 439 - 445
  • [9] A branch and bound algorithm for the two-stage assembly scheduling problem
    Hariri, AMA
    Potts, CN
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 103 (03) : 547 - 556
  • [10] Johnson S. M., 1954, NAV RES LOG, V1, P61, DOI [10.1002/nav.3800010110, DOI 10.1002/NAV.3800010110]