CORRECTION TECHNOLOGY FOR MAIN GIRDER TORSION IN A COMPOSITE GIRDER CABLE-STAYED BRIDGE

被引:0
|
作者
She, Q. C. [1 ,2 ]
Yan, D. H. [1 ]
Chen, C. S. [1 ]
Li, B. [2 ]
Huang, G. [1 ]
机构
[1] Changsha Univ Sci & Technol, Sch Civil Engn, Changsha 410114, Peoples R China
[2] Hunan Inst Sci & Technol, Coll Civil Engn & Architecture, Yueyang, Peoples R China
基金
中国国家自然科学基金;
关键词
Composite Girder Cable-Stayed Bridge; Main Girder Torsion; Finite Element Analysis; Correction Technology;
D O I
10.2507/IJSIMM22-3-653
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
To solve the problem of the steel longitudinal beam being unable to match precise installation of the steel main beam due to torsional deformation during the steel installation process of a composite twin-box girder cable-stayed bridge, a torsion correction method through the multipoint jacking adjustment of transverse steel beams is proposed. Based on the constrained torsion calculation theory for closed thin-walled members, a constrained torsion differential equation for steel longitudinal beams and its general solution were established. Then, the torsion angle and the jacking force on each steel beam at zero torsion angles were obtained. In addition, a local refined model by the finite element software Abaqus was established, simulating the jacking process with the transverse steel beams as a lever arm. The accuracy of the theoretical and numerical analysis was verified by the measured results on site. Results show that the torsion angle of the steel longitudinal beam could be adjusted through multipoint jacking of the steel crossbeam, the installation error caused by the torsion is effectively eliminated, and the efficiency and accuracy of the composite twin-box girder cable-stayed bridge are improved.
引用
收藏
页码:450 / 461
页数:12
相关论文
共 50 条
  • [41] Research on Synchronous Construction Control Technology for the Pylon and Girder of Maling River Cable-stayed Bridge
    Xiong, Shao-Hui
    Zhang, You-Jin
    PROCEEDINGS OF THE 2ND ANNUAL INTERNATIONAL CONFERENCE ON ADVANCED MATERIAL ENGINEERING (AME 2016), 2016, 85 : 778 - 790
  • [42] Analysis on bearing safety of anchorage zone between girder and cable in cable-stayed bridge
    Wei, X
    Li, XZ
    Li, J
    Qiang, SZ
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL V, PTS A AND B, 2005, 5 : 1523 - 1528
  • [43] Study on Fatigue Behavior of Anchorage of Cable and Girder of Long Span Cable-Stayed Bridge
    刘庆宽
    强士中
    张强
    Journal of Southwest Jiaotong University, 2001, (01) : 42 - 49
  • [44] Study on Static and Dynamic Reliability of Main Girder of Cable-stayed Bridge Based on Subset Simulation Method
    Zhenhao Zhang
    Mengmeng Tao
    Fuming Wang
    Yi Yang
    Lu Ke
    KSCE Journal of Civil Engineering, 2023, 27 : 657 - 669
  • [45] Study on Static and Dynamic Reliability of Main Girder of Cable-stayed Bridge Based on Subset Simulation Method
    Zhang, Zhenhao
    Tao, Mengmeng
    Wang, Fuming
    Yang, Yi
    Ke, Lu
    KSCE JOURNAL OF CIVIL ENGINEERING, 2023, 27 (02) : 657 - 669
  • [46] FULLY NONLINEAR-ANALYSIS OF COMPOSITE GIRDER CABLE-STAYED BRIDGES
    ADELI, H
    ZHANG, J
    COMPUTERS & STRUCTURES, 1995, 54 (02) : 267 - 277
  • [47] PC Cable-Stayed Bridge Main Girder Shear Lag Effects: Assessment of Single Cable Plane in Construction Stage
    Li, Yan-feng
    Sun, Xing-long
    Bao, Long-sheng
    ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2020, 2020
  • [48] Study on Mechanical Performance of Steel-concrete Composite Segment of Main Girder of Long Span Cable-stayed Railway Bridge
    Shi Z.
    Jia W.
    Ning B.
    Shi J.
    Li S.
    Zhang J.
    Tiedao Xuebao/Journal of the China Railway Society, 2023, 45 (03): : 36 - 46
  • [49] Overall Design of Single Pylon Cable-Stayed Bridge with Very Wide Main Girder and Twisted Back Cable Planes
    Zhang W.
    Fu K.
    Wang W.-M.
    Bridge Construction, 2023, 53 : 98 - 104
  • [50] Damage identification method for the main girder of cable-stayed bridge based on the tension indices of the most sensitive stay cable
    Li, Yanqiang
    Zhao, Shiying
    Du, Yanliang
    Zhongguo Tiedao Kexue/China Railway Science, 2014, 35 (02): : 20 - 25