Multi-objective green scheduling of integrated flexible job shop and automated guided vehicles

被引:17
|
作者
Xu, Gongjie [1 ]
Bao, Qiang [2 ]
Zhang, Hongliang [2 ,3 ]
机构
[1] Northwestern Polytech Univ, Sch Mech Engn, Dept Ind Engn, Xian 710072, Shaanxi, Peoples R China
[2] Anhui Univ Technol, Sch Management Sci & Engn, Maanshan 243032, Peoples R China
[3] Educ Dept Anhui Prov, Key Lab Multidisciplinary Management & Control Com, Maanshan 243002, Peoples R China
关键词
Flexible job shop; Automated guided vehicles; Total energy consumption; Makespan; Efficient heuristic algorithm; GENETIC ALGORITHM; OPTIMIZATION ALGORITHM; ENERGY-CONSUMPTION; MODELS;
D O I
10.1016/j.engappai.2023.106864
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The traditional flexible job shop scheduling problem (FJSP) ignores transportation issues or merely introduces a time lag for transportation tasks while assuming an infinite number of transportation resources. With the development of intelligent manufacturing, automated guided vehicles (AGVs), which are the key transportation equipment for manufacturing enterprises, have been widely used for their high flexibility and stability. In addition, the increase in energy consumption and the trend of green manufacturing make it critical to take into account energy-related objectives in the decision-making of scheduling. Therefore, the multi-objective green scheduling problem of integrated flexible job shop and AGVs (MOGSP-IFJS & AGVs) is addressed in this paper. To solve this problem effectively, the multi-objective mixed-integer programming (MMIP) model is formulated to minimize total energy consumption and makespan simultaneously. An efficient heuristic algorithm (EHA) is designed to solve the MMIP model. In the EHA, one solution encoding scheme and corresponding greedy insertion decoding method considering the selection of AGVs are presented. To acquire a high-quality initial population, the population initialization method balancing the processing time and energy consumption is designed. Further, a local search strategy is presented to enhance the quality of solutions and accelerate the convergence speed of the EHA. Experiment results of 45 test instances indicate that the EHA can obtain better solutions than that of comparison algorithms, which confirms the effectiveness of the EHA for solving the MOGSP-IFJS & AGVs.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] MULTI OBJECTIVE FLEXIBLE JOB SHOP SCHEDULING PROBLEMS
    Kaya, Serkan
    Figlali, Nilgun
    SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2013, 31 (04): : 605 - 623
  • [42] Blocking job shop cell scheduling with automated guided vehicles
    Zeng, Chengkuan
    Tang, Jiafu
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 438 - 441
  • [43] Robustness measures and robust scheduling for multi-objective stochastic flexible job shop scheduling problems
    Xiao-Ning Shen
    Ying Han
    Jing-Zhi Fu
    Soft Computing, 2017, 21 : 6531 - 6554
  • [44] Robustness measures and robust scheduling for multi-objective stochastic flexible job shop scheduling problems
    Shen, Xiao-Ning
    Han, Ying
    Fu, Jing-Zhi
    SOFT COMPUTING, 2017, 21 (21) : 6531 - 6554
  • [45] Dynamic Integrated Scheduling of Production Equipment and Automated Guided Vehicles in a Flexible Job Shop Based on Deep Reinforcement Learning
    Wang, Jingrui
    Li, Yi
    Zhang, Zhongwei
    Wu, Zhaoyun
    Wu, Lihui
    Jia, Shun
    Peng, Tao
    PROCESSES, 2024, 12 (11)
  • [46] Flexible Job Shop Scheduling Optimization for Green Manufacturing Based on Improved Multi-Objective Wolf Pack Algorithm
    Li, Jian
    Li, Huankun
    He, Pengbo
    Xu, Liping
    He, Kui
    Liu, Shanhui
    APPLIED SCIENCES-BASEL, 2023, 13 (14):
  • [47] Research on multi-objective fuzzy job shop scheduling
    Lei, De-Ming
    Wu, Zhi-Ming
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2006, 12 (02): : 174 - 179
  • [48] Study on Job Shop Scheduling Optimization with Multi-objective
    Ze, Tao
    Di, Liang
    Qun, Zhou
    HIGH PERFORMANCE STRUCTURES AND MATERIALS ENGINEERING, PTS 1 AND 2, 2011, 217-218 : 326 - +
  • [49] Study on Multi-objective Dynamic Job Shop Scheduling
    Qi, Lixin
    Liu, Xiaoxia
    ARTIFICIAL INTELLIGENCE AND COMPUTATIONAL INTELLIGENCE, PT II, 2011, 7003 : 648 - +
  • [50] A Multi-swarm Approach to Multi-objective Flexible Job-shop Scheduling Problems
    Liu, Hongbo
    Abraham, Ajith
    Wang, Zuwen
    FUNDAMENTA INFORMATICAE, 2009, 95 (04) : 465 - 489