Multi-objective green scheduling of integrated flexible job shop and automated guided vehicles

被引:17
|
作者
Xu, Gongjie [1 ]
Bao, Qiang [2 ]
Zhang, Hongliang [2 ,3 ]
机构
[1] Northwestern Polytech Univ, Sch Mech Engn, Dept Ind Engn, Xian 710072, Shaanxi, Peoples R China
[2] Anhui Univ Technol, Sch Management Sci & Engn, Maanshan 243032, Peoples R China
[3] Educ Dept Anhui Prov, Key Lab Multidisciplinary Management & Control Com, Maanshan 243002, Peoples R China
关键词
Flexible job shop; Automated guided vehicles; Total energy consumption; Makespan; Efficient heuristic algorithm; GENETIC ALGORITHM; OPTIMIZATION ALGORITHM; ENERGY-CONSUMPTION; MODELS;
D O I
10.1016/j.engappai.2023.106864
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The traditional flexible job shop scheduling problem (FJSP) ignores transportation issues or merely introduces a time lag for transportation tasks while assuming an infinite number of transportation resources. With the development of intelligent manufacturing, automated guided vehicles (AGVs), which are the key transportation equipment for manufacturing enterprises, have been widely used for their high flexibility and stability. In addition, the increase in energy consumption and the trend of green manufacturing make it critical to take into account energy-related objectives in the decision-making of scheduling. Therefore, the multi-objective green scheduling problem of integrated flexible job shop and AGVs (MOGSP-IFJS & AGVs) is addressed in this paper. To solve this problem effectively, the multi-objective mixed-integer programming (MMIP) model is formulated to minimize total energy consumption and makespan simultaneously. An efficient heuristic algorithm (EHA) is designed to solve the MMIP model. In the EHA, one solution encoding scheme and corresponding greedy insertion decoding method considering the selection of AGVs are presented. To acquire a high-quality initial population, the population initialization method balancing the processing time and energy consumption is designed. Further, a local search strategy is presented to enhance the quality of solutions and accelerate the convergence speed of the EHA. Experiment results of 45 test instances indicate that the EHA can obtain better solutions than that of comparison algorithms, which confirms the effectiveness of the EHA for solving the MOGSP-IFJS & AGVs.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] Application of multi-objective memetic algorithm in multi-objective flexible job-shop scheduling problem
    Zhenwen, H.U.
    Academic Journal of Manufacturing Engineering, 2019, 17 (03): : 24 - 28
  • [22] Integrated scheduling of machines and automated guided vehicles (AGVs) in flexible job shop environment using genetic algorithms
    Chaudhry, Imran Ali
    Rafique, Amer Farhan
    Elbadawi, Isam A-Q
    Aichouni, Mohamed
    Usman, Muhammed
    Boujelbene, Mohamed
    Boudjemline, Attia
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2022, 13 (03) : 343 - 362
  • [23] Robust scheduling for multi-objective flexible job-shop problems with flexible workdays
    Zhang, Jiae
    Yang, Jianjun
    Zhou, Yong
    ENGINEERING OPTIMIZATION, 2016, 48 (11) : 1973 - 1989
  • [24] Solving multi-objective green flexible job shop scheduling problem by an improved chimp optimization algorithm
    Luan F.
    Tang B.
    Li Y.
    Liu S.Q.
    Yang X.
    Masoud M.
    Feng B.
    Journal of Intelligent and Fuzzy Systems, 2024, 46 (04): : 7697 - 7710
  • [25] Research on Multi-objective Green Flexible Job-shop Scheduling Based on Improved ABC Algorithm
    Li Y.
    Huang W.
    Wu R.
    Wu, Rui (wurui@whut.edu.cn), 1600, China Mechanical Engineering Magazine Office (31): : 1344 - 1350and1385
  • [26] Multi-objective flexible job shop green scheduling problem with self-adaptive Jaya algorithm
    Wang, Jian-Hua
    Pan, Yu-Jie
    Sun, Rui
    Kongzhi yu Juece/Control and Decision, 2021, 36 (07): : 1714 - 1722
  • [27] Multi-objective Integrated Optimization Problem of Preventive Maintenance Planning and Flexible Job-Shop Scheduling
    Jing, Zha
    Hua, Jin
    Yi, Zhu
    PROCEEDINGS OF THE 23RD INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2016: THEORY AND APPLICATION OF INDUSTRIAL ENGINEERING, 2017, : 137 - 141
  • [28] Scheduling of a flexible job-shop using a multi-objective genetic algorithm
    Agrawal, Rajeev
    Pattanaik, L. N.
    Kumar, S.
    JOURNAL OF ADVANCES IN MANAGEMENT RESEARCH, 2012, 9 (02) : 178 - 188
  • [29] Due date optimization in multi-objective scheduling of flexible job shop production
    Ojstersek, R.
    Tang, M.
    Buchmeister, B.
    ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2020, 15 (04): : 481 - 492
  • [30] A Collaborative Evolutionary Algorithm for Multi-objective Flexible Job Shop Scheduling Problem
    Li, X. Y.
    Gao, L.
    2011 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2011, : 997 - 1002